Post Job Free

Resume

Sign in

Engineer Chemical Engineering

Location:
Putatan, Muntinlupa, 1777, Philippines
Posted:
March 18, 2021

Contact this candidate

Resume:

Renaldo John Paul Magat Joves

Unit * -** Anuva Residences, Brgy. Buli, Muntinlupa City, NCR, Philippines Phone: +639********* E-mail: adk0yd@r.postjobfree.com Summary:

An engineer with more than six years of experience in process engineering for chemical and oil/gas industries covering different project phases in North America, Australia, Japan, Qatar, and Brunei, while executing broad range of process engineering activities. Recognized by his passion to simplify and leverage his skills during his temporary assignment in one of the Refinery – Terminal overseas. WORK EXPERIENCE

JGC PHILIPPINES, Muntinlupa City Philippines

Process Engineer, Process Department

September 2018 – Present

Lead Engineer, handles the execution of thermal rating works

Acts as coordinator between JGC Yokohama Office and Manila Office

Acts as coordinator between Equipment Design Group and other design disciplines such Process and Mechanical groups

Coordinates the submission of deliverables, clarifications and other concerns to Client

Evaluates the deliverables in accordance to the Client and/or Design Standards

Interprets different Client Requirements for easier execution of design activities

Monitors schedule for the submission of deliverables

Helps in the delegation of activities to the team members and check their outputs for the execution of various technical works

Performs heat exchanger thermal rating for Shell and Tube heat exchangers, including trouble shooting.

Performs Relief load calculation including PSV sizing.

Performs Hydraulic Calculation for Line Sizing, Control Valves and Rotating Equipment

Prepares Equipment Datasheets for Rotating equipment Major Project Involvements Include (but not limited to):

Basrah Refinery Upgrading Project, July 2020 to Present

South Ghawar Project, May 2019 to July 2020

PK-USA, June 2019 to October 2019

Project Harmony, September 2018 to May 2019

SHELL BUSINESS OPERATION, Makati City Philippines

Process Data Engineer and Facilities Engineer, Finance Operations Data – Capital Projects October 2017 – July 2018

Support and execute capital projects CMMS (Computerized Maintenance Management System) build and assurance activities for identified projects across upstream and downstream to help deliver first time right data from project to operations and maintenance. This includes delivery of quality asset data from the project to support the business to transition smoothly to run and maintain. This requires also close cooperation with other FOD units (like Procurement).

Execute and support the development of strategies and plans, in conjunction with the business and the process manager for CMMS build projects, as well as assurance and data quality activities in support of projects

Analyzing technical data and documents and processes by working with engineering, maintenance, operations and project team & partners by thorough checking of documents such as P&ID, PEFS & PFD conducting site verification to support the continuous improvement of the capital project CMMS build process and related team objectives. Major Project Involvements Include (but not limited to):

Shell Sewaren Terminal (111 State Street, Sewaren, NJ), October 2017 – July 2018 o Temporary International Assignment for the Physical Verification and P&ID review, March to April 2018 CHIYODA PHILIPPINES CORPORATION, Mandaluyong City Philippines Thermal Rating Engineer, Equipment Design Group

June 2015 – October 2017

Handles the execution of thermal rating works in the absence of the Lead Engineer

Acts as coordinator between Chiyoda Yokohama Office and Manila Office

Acts as coordinator between Equipment Design Group and other design disciplines such Process and Mechanical groups

Coordinates the submission of deliverables, clarifications and other concerns to Client

Evaluates the deliverables in accordance to the Client and/or Design Standards

Interprets different Client Requirements for easier execution of design activities

Monitors schedule for the submission of deliverables in coordination with the Lead Engineer

Helps in the delegation of activities to the team members and check their outputs for the execution of various technical works

Trouble shooting of heat exchangers for the following concerns: o Study case for localized corrosion for shell and tube heat exchangers

Conducts training for basic heat exchanger design and special heat exchanger service for entry level engineers.

Involved and acted as originator in preparation of design manual and guideline for the design of Heat exchangers (Air cooled heat exchangers and Shell and Tube heat exchangers)

Performs heat exchanger thermal rating for both Shell and Tube heat exchangers and Air cooled heat exchangers

Performs Detailed Single tube Vibration Analysis for Shell and Tube heat exchangers

Conducts performance check, case studies and provide design recommendations for shell and tube heat exchangers and air cooled heat exchangers for Green field and Brownfield Projects Major Project Involvements Include (but not limited to):

LNG Canada Project (Study), April 2017

Chiba Arkon Chemical Plant, March – April 2017

PNG LNG Plant Project, January – February 2017

Osaka Gas Senboku second factory Low Temp LPG Receiving Facility, December 2016 – January 2017

Golden Pass LNG Export Project (GPX), June – October 2016

Jordan Cove LNG Export Project (JCL), April – September 2016

Petron Hydrogen Heat Recovery Project, December 2015 – January 2016 Process Engineer

June 2014 – October 2017

Acts as coordinator between Chiyoda Singapore Office and Manila Office

Prepares and verify the EPC development of the following documents: o Process Flow Diagram

o Material Selection Diagram

o Piping and Instrumentation Diagram

o Process Flow Safeguarding Diagram

o Engineering Diagram

Helps in the delegation of activities to the team members and check their outputs for the execution of PFD, MSD, P&ID, and PFSD.

Submits reports to Project Management Team for manhour control and status of process engineering activities

Attends to bi-monthly meetings with the Project Management Team for reporting of activities, MH consumption, change notices and other contract related concerns.

Develops Hydraulic Calculation for Line Sizing, and Rotating Equipment Hydraulics (pumps)

Prepares Equipment Datasheets

Conducts consistency checks and design verification for process deliverables such as datasheets, engineering drawings, project design basis, stream summary, equipment list, and design pressure and design temperature diagrams Major Project Involvements Include (but not limited to):

Refrigerated Gaseous Tank Facility for Ethylene and Propylene for PDT2 (RGTF), November 2016 – October 2017

Flint Hills Resource Delayed Coker Unit Troubleshooting (Pre-EPC Bid Estimation), October 2016 – January 2017

LNG Canada Project (LCP – PRE-FID), June – July 2016

LNG Canada Project (LCP), November 2014– May 2015

Scarborough Floating LNG (SFL), January 2015 – April 2015

Golden Pass LNG Export Project (GPX), November 2014 – January 2015 SKILLS:

With at least basic knowledge on the following software/computer applications:

HTRI Xchanger Suite Package

Simsci PRO II Version 9.1

ProDraw (Hydraulic Calculation Program by

Chiyoda)

Best Pipe (Hydraulic Calculation Program by

JGC)

EDUCATIONAL BACKGROUND:

Registered Chemical Engineer Professional

Regulatory Commission, Manila Board Certified –

May 2014

License Number: 0029787

Tray-D PC (Tray Sizing Program by Chiyoda)

AutoCAD

Microsoft Office (Word, Excel, Powerpoint, Viso)

Saint Louis University, Bonifacio Road, Baguio

City, Philippines

Bachelor of Science in Chemical Engineering,

November 2013



Contact this candidate