Renaldo John Paul Magat Joves
Unit * -** Anuva Residences, Brgy. Buli, Muntinlupa City, NCR, Philippines Phone: +639********* E-mail: *********@*****.*** Summary:
An engineer with more than six years of experience in process engineering for chemical and oil/gas industries covering different project phases in North America, Australia, Japan, Qatar, and Brunei, while executing broad range of process engineering activities. Recognized by his passion to simplify and leverage his skills during his temporary assignment in one of the Refinery – Terminal overseas. WORK EXPERIENCE
JGC PHILIPPINES, Muntinlupa City Philippines
Process Engineer, Process Department
September 2018 – Present
Lead Engineer, handles the execution of thermal rating works
Acts as coordinator between JGC Yokohama Office and Manila Office
Acts as coordinator between Equipment Design Group and other design disciplines such Process and Mechanical groups
Coordinates the submission of deliverables, clarifications and other concerns to Client
Evaluates the deliverables in accordance to the Client and/or Design Standards
Interprets different Client Requirements for easier execution of design activities
Monitors schedule for the submission of deliverables
Helps in the delegation of activities to the team members and check their outputs for the execution of various technical works
Performs heat exchanger thermal rating for Shell and Tube heat exchangers, including trouble shooting.
Performs Relief load calculation including PSV sizing.
Performs Hydraulic Calculation for Line Sizing, Control Valves and Rotating Equipment
Prepares Equipment Datasheets for Rotating equipment Major Project Involvements Include (but not limited to):
Basrah Refinery Upgrading Project, July 2020 to Present
South Ghawar Project, May 2019 to July 2020
PK-USA, June 2019 to October 2019
Project Harmony, September 2018 to May 2019
SHELL BUSINESS OPERATION, Makati City Philippines
Process Data Engineer and Facilities Engineer, Finance Operations Data – Capital Projects October 2017 – July 2018
Support and execute capital projects CMMS (Computerized Maintenance Management System) build and assurance activities for identified projects across upstream and downstream to help deliver first time right data from project to operations and maintenance. This includes delivery of quality asset data from the project to support the business to transition smoothly to run and maintain. This requires also close cooperation with other FOD units (like Procurement).
Execute and support the development of strategies and plans, in conjunction with the business and the process manager for CMMS build projects, as well as assurance and data quality activities in support of projects
Analyzing technical data and documents and processes by working with engineering, maintenance, operations and project team & partners by thorough checking of documents such as P&ID, PEFS & PFD conducting site verification to support the continuous improvement of the capital project CMMS build process and related team objectives. Major Project Involvements Include (but not limited to):
Shell Sewaren Terminal (111 State Street, Sewaren, NJ), October 2017 – July 2018 o Temporary International Assignment for the Physical Verification and P&ID review, March to April 2018 CHIYODA PHILIPPINES CORPORATION, Mandaluyong City Philippines Thermal Rating Engineer, Equipment Design Group
June 2015 – October 2017
Handles the execution of thermal rating works in the absence of the Lead Engineer
Acts as coordinator between Chiyoda Yokohama Office and Manila Office
Acts as coordinator between Equipment Design Group and other design disciplines such Process and Mechanical groups
Coordinates the submission of deliverables, clarifications and other concerns to Client
Evaluates the deliverables in accordance to the Client and/or Design Standards
Interprets different Client Requirements for easier execution of design activities
Monitors schedule for the submission of deliverables in coordination with the Lead Engineer
Helps in the delegation of activities to the team members and check their outputs for the execution of various technical works
Trouble shooting of heat exchangers for the following concerns: o Study case for localized corrosion for shell and tube heat exchangers
Conducts training for basic heat exchanger design and special heat exchanger service for entry level engineers.
Involved and acted as originator in preparation of design manual and guideline for the design of Heat exchangers (Air cooled heat exchangers and Shell and Tube heat exchangers)
Performs heat exchanger thermal rating for both Shell and Tube heat exchangers and Air cooled heat exchangers
Performs Detailed Single tube Vibration Analysis for Shell and Tube heat exchangers
Conducts performance check, case studies and provide design recommendations for shell and tube heat exchangers and air cooled heat exchangers for Green field and Brownfield Projects Major Project Involvements Include (but not limited to):
LNG Canada Project (Study), April 2017
Chiba Arkon Chemical Plant, March – April 2017
PNG LNG Plant Project, January – February 2017
Osaka Gas Senboku second factory Low Temp LPG Receiving Facility, December 2016 – January 2017
Golden Pass LNG Export Project (GPX), June – October 2016
Jordan Cove LNG Export Project (JCL), April – September 2016
Petron Hydrogen Heat Recovery Project, December 2015 – January 2016 Process Engineer
June 2014 – October 2017
Acts as coordinator between Chiyoda Singapore Office and Manila Office
Prepares and verify the EPC development of the following documents: o Process Flow Diagram
o Material Selection Diagram
o Piping and Instrumentation Diagram
o Process Flow Safeguarding Diagram
o Engineering Diagram
Helps in the delegation of activities to the team members and check their outputs for the execution of PFD, MSD, P&ID, and PFSD.
Submits reports to Project Management Team for manhour control and status of process engineering activities
Attends to bi-monthly meetings with the Project Management Team for reporting of activities, MH consumption, change notices and other contract related concerns.
Develops Hydraulic Calculation for Line Sizing, and Rotating Equipment Hydraulics (pumps)
Prepares Equipment Datasheets
Conducts consistency checks and design verification for process deliverables such as datasheets, engineering drawings, project design basis, stream summary, equipment list, and design pressure and design temperature diagrams Major Project Involvements Include (but not limited to):
Refrigerated Gaseous Tank Facility for Ethylene and Propylene for PDT2 (RGTF), November 2016 – October 2017
Flint Hills Resource Delayed Coker Unit Troubleshooting (Pre-EPC Bid Estimation), October 2016 – January 2017
LNG Canada Project (LCP – PRE-FID), June – July 2016
LNG Canada Project (LCP), November 2014– May 2015
Scarborough Floating LNG (SFL), January 2015 – April 2015
Golden Pass LNG Export Project (GPX), November 2014 – January 2015 SKILLS:
With at least basic knowledge on the following software/computer applications:
HTRI Xchanger Suite Package
Simsci PRO II Version 9.1
ProDraw (Hydraulic Calculation Program by
Chiyoda)
Best Pipe (Hydraulic Calculation Program by
JGC)
EDUCATIONAL BACKGROUND:
Registered Chemical Engineer Professional
Regulatory Commission, Manila Board Certified –
May 2014
License Number: 0029787
Tray-D PC (Tray Sizing Program by Chiyoda)
AutoCAD
Microsoft Office (Word, Excel, Powerpoint, Viso)
Saint Louis University, Bonifacio Road, Baguio
City, Philippines
Bachelor of Science in Chemical Engineering,
November 2013