SAMUEL B. PENIX
Blk * Lot ** Adelina Homes Subdv., Lipa City
Batangas City, Philippines 4217
Tel.no. 0063-947-5621-826
e-mail add. adjzzg@r.postjobfree.com
PERSONAL DATA:
DATE OF BIRTH : MAY 31, 1969
PLACE OF BIRTH : LIMAY, BATAAN
HEIGHT : 5’ 5”
WEIGHT : 70 Kgs.
NATIONALITY : FILIPINO
CIVIL STATUS : MARRIED
RELIGION : ROMAN CATHOLIC
PASSPORT No. : P6285555A
EDUCATIONAL BACKGROUND
DATE SCHOOL DEGREE
March 1995 Technological institute of Bachelor of Science in the Philippines Mechanical Engineer
April 1986 Limay Municipal High School Graduate
Limay, Bataan
April 1982 Limay Elementary School Graduate
Limay, Bataan
June 1994 Interface Computer learning AUTOCAD
Center, Manila
QUALIFICATION HIGHLIGHTS:
Applies technical knowledge in the design, application, and procurement of piping systems. Application of a strong working knowledge of piping codes and standards is required to ensure that the most effective design has been selected and that it is in compliance with Safety and Loss Prevention principles, industry standards, and codes. Field surveying and data gathering of existing piping systems tie-ins, Field routing new pipe lines and laying out new equipment in existing plant facilities. Provide detailed fabrication drawings and installation details. Drawing layout and generation using established pipe specifications, P&ID’s, and detail design standards. Prepare final piping detail design drawing package include job instructions, for IFA Issue for Approval, IFC Issue for Construction and MST Material Specification Transmittal. Provide project leadership, coordination with other disciplines, and construction support when required. Responsible for meeting project schedules and design team objectives. Proponent engineer for specific Shutdown related piping scopes of work, Provide all aspects of engineering/technical support and assistance to shutdown teams, Develop and maintain productive and constructive relationships with site- based / offshore personnel, onshore operations / technical teams and external contractors / vendors.
WORK EXPERIENCE:
COMPANY : Sisco(Specialized Industries Services Co.Ltd./ CB&I / McDermott
POSITION : QA / QC PIPING INSPECTOR
PROJECT : SASREF Master Plan Margin Growth Project LOCATION : Saudi Aramco Shell Refinery Company (SASREF) Al Jubail Kingdom of Saudi Arabia
DATE : November 2018 – January 2020
DUTIES AND RESPONSIBILITIES:
: Follow the QA/QC management system at sites.
: Ensure Piping and Mechanical ITP stages are followed and complied
: Communicate with management, staff, and clients the requirements of quality's scope of work.
: Verify that all site activities comply with the quality codes and standards.
: Provide appropriate feedback to management regarding QA/QC matters.
: Performing visual inspection of piping installation.
: Verifying piping material identity (pipe, valves and fittings) and its conformance to the installation drawings
: Verifying that welding inspection has been performed and joints have been released
: Verification that dimensions and alignment tolerances of the piping systems are as per constructs specifications
: In-process surveillance to verify compliance with specified piping erection procedure including flange alignments, torquing, cleanliness etc.
: Performing piping walkdown inspection and completing punch lists. Verifying that punch list items have been dealt with in accordance with the contractual arrangements.
: Reviewing and verifying completeness of piping test packages (hydro or pneumatic) prior to testing.
: Witnessing final piping tests.
: Completing and endorsing all inspection records from initial inspection till final acceptance of the piping systems
: Maintaining interface with the Client (at the shop level) to ensure that all contractual and code requirements are met as far as the inspection scope is concerned.
COMPANY : Sisco(Specialized Industries Services Co.Ltd./ MCS ( MODERN CHEMICAL & SERVICES )
POSITION : MECHANICAL QC/ PIPING ENGINEER
PROJECT : AL KHABRA MINES AN FACILITIES PROJECT
LOCATION : UMM WU’AL PROJECT TURAIF SAUDI ARABIA
CLIENT : MA’ADEN WA’AD AL SHAMAL PHOSPHATE
COMPANY
DATE : JULY 2017 TO OCT 2018
DUTIES AND RESPONSIBILITIES:
: Perform all daily inspection and test of the scope and character necessary to achieve the quality of construction required in the drawings and specifications for all works under the contract performed ON or OFF site.
: Carry out inspection and checking for all quality related procedures in the site and ensures activity at the site are as per approved method statement and inspection test plan.
: Coordinate with the consultant’s representative and Site En-charge for inspection and meeting about quality problems including the closure of Non-Compliance Report.
: Report to the QA/QC Manager, control, and monitor all activities related to Quality Management System, QMS.
: Taking care of QA/QC documents of the entire project including certificates, calibration, test results, inspection requests, non-compliance reports and site instruction/observations, permanent materials delivered and other QA/QC documents. Responsible for the closure of Non-conformance, NCR and Site Instruction, SI.
: Responsible for the quality and workmanship of every activity, thorough knowledge of all phases of engineering construction relating to Mechanical discipline interfacing the multidisciplinary operations.
: Develop method statement for the activity including risk assessment and job safety environmental analysis and Inspection Test Plan and Checklist based on specifications of the project.
: Carry out Internal Audit at the site as scheduled in the Project Quality Plan, PQP.
: Liaise the Technical Engineer for submission of material submittals to Consultant. COMPANY : Sisco(Specialized Industries Services Co.Ltd./ MAG Engineering and Contacting Co.W.L.L. Saudi
Arabia
POSITION : QC PIPING INSPECTOR
PROJECT : HAIL POWER PLANT Conversion from Simple Cycle to Combine Cycle Project
LOCATION : HAIL INDUSTRIAL CITY KINGDOM OF SAUDI
ARABIA(GCC)
CLIENT : S.E.C (SAUDI ELECTRIC COMPANY)
DATE : JULY 2015 TO JUNE 2017
DUTIES AND RESPONSIBILITIES:
: Maintain and Reviewed all engineering documents in accordance to global procedures.
: Coordinated with engineering and manufacturing teams and recommended Materials for processes.
: Analyzed materials and ensured their fabrication capability and their compatibility with Engineering design.
: Evaluated engineering drawings and ensured that correct materials were used in manufacturing process.
: Monitored materials used and recommended alternatives that would reduce cost of project and enhance quality.
: Coordinates with vendors regarding material and documented all materials that were used in process.
: Assisted supply team and procured materials.
: Updated knowledge of industry material specification and quality codes and standards.
: Inspects materials, products, and work in progress for conformance to specifications, and adjusts process or assembly equipment to meet standards.
: Marks items for acceptance or rejection, records test results and inspection data, and compare findings with specifications to ensure conformance to standards.
: Confers with vendors and others regarding inspection results, recommends corrective procedures, and compiles reports of results, recommendations, and needed repairs.
: Performed or provided technical supervision of inspection.
: Conducted and observed sampling and testing of aggregates.
: Reviewed materials delivered to site for conformance with approved by clients.
: Inspected the materials delivered,prior of issuance to site.
: Assisted with the inspection of completed received materials. COMPANY : Sisco(Specialized Industries Services Co.Ltd./ BONATTI CONSTRUCTION S.P.A Saudi Arabia
POSITION : PIPING ENGINEER/COMMISSIONING ENGINEER
PROJECT : YANBU ARAMCO SINOPEC REFINING COMPANY
(YASREF)
LOCATION : YANBU INDUSTRIAL CITY KINGDOM OF SAUDI
ARABIA(GCC)
CLIENT : YASREF (YANBU ARAMCO SINOPEC REFINING
COMPANY)
DATE : DECEMBER 2012 TO JANUARY 2015
DUTIES AND RESPONSIBILITIES:
: Preparation, organization and realization of all activities related to commissioning, for all relevant modification works done on the Site.These modification works are done mainly by external entities, in the frame work of RFM(requests for modification)system,following proper SMR(site modification request) process. All disciplines, System Control \Instrumentation, Electricity, Mechanical, Piping, Valves, Vessels.
: Assistance to the preparation of operating procedures for new equipments and production facilities.
: Coordination of the interfaces with others Field Operation activities.
: Responsible for developing and ensuring adherence to established standards, practices and procedures.
: Drafting operating and commissioning procedures as required.
: Establishing systems and system acceptance criteria.
: Overseeing in system walkdowns and punch listing to ensure installation is per design and reflects piping and instrument diagrams.
: Deficiency categorization.
: Develop and oversee the pre-commissioning and commissioning activities in a safe and efficient manner.
: Oversee start-up activities according to the implementation plans, schedules and budget.
: Actively participate in Commissioning risk management processes.
: Assuring activities undertaken are appropriately risk managed.
: Assuring the appropriate lockout-tagout processes are in place for commissioning and that the
management of these processes is being performed by competent personnel.
: Assuring that progress towards commissioning progress goals is monitored and adequately resourced to ensure team success.
: Assuring that the project scope is divided up into systems that are defined in a manner that will support ease of commissioning.
: Assuring that the System Commissioning Procedures are developed, approved, and finalized per the planning schedule and include the appropriate content and detail to support safe and thorough commissioning. COMPANY : DAELIM INDUSTRIES & ENG’G CO.LTD.
POSITION : PIPING ENGINEER
PROJECT : REFINERY MASTER PLAN PHASE 2 (RMP2)
LOCATION : PETRON BATAAN REFINERY
LIMAY, BATAAN
CLIENT : PETRON BATAAN REFINERY (PBR)
DATE : OCT. 2010 – NOV. 2012
DUTIES AND RESPONSIBILITIES:
: Responsible for delivering piping deliverables for the facility.
: Provides review of piping and layout deliverables to ensure they meet codes, standards,company specifications, basis of design, and safety standards.
: Responsible for managing all aspects of Piping scope of work including but not limited to: codes and standards compliance, technical support, Model Reviews of piping and equipment layout to ensure Company Safety in Design, Operability,Interfaces.intainability and Constructability objectives are met
: Provides engineering input in the area of Piping Design, Piping Engineering
(i.e. technical review of piping requisitions, piping line classes, etc.) and Multi- Office Workshare.
: Responsible to do Design and Calculation works.
: Review and Interpret drawings and engineering specification.
: Conduct site analysis for engineering problems and design deficiencies, and recommend immediate action to the field engineer.
: Monitor all piping work if done accordance with the latest revision of drawings and specification.
: Assigned to handle existing area for more than 200 Tie-in points to checked construction drawing and existing line based on P & ID’s and actual condition at site.
: Initiates field change notice and additional work orders.
: Prepared material take-off and cost estimate as required for change work for the purpose of material control and cost estimate.
: Preparation of documents for answering client queries on engineering matters.
: Study and review the design concept of all pipe line connection to Tank, Equipment and Existing pipe line based on P & ID’s prior for fabrication and erection.
: Updating Plan drawings regarding the field changes & revision. COMPANY : ABB LUMMUS GLOBAL B.V.
POSITION : PIPING ENGINEER
PROJECT : GAS DEVELOPMENT PROJECT
OHANET, ALGERIA
LOCATION : ALGERIA
CLIENT : ARCO CHEMIE NEDERLAND, LTD
BHP PETROLEUM
DATE : JULY. 2008 – SEPT. 2010
DUTIES AND RESPONSIBILITIES:
: Provide response to technical queries raised by Contractors during the execution in relation to piping engineering and design without significant variation.
: Participate in design review meetings with consultants and contractors to provide guidance and direction in all piping engineering matters.
: Review and approve contractors piping engineering deliverables (piping plans, isometrics, pipe support details, line lists, tie-in schedules, etc.) for Contracts to ensure compliance with latest codes, standards,specifications, and company requirements.
: Review and evaluate construction change orders and ensure compliance with standards as well as costs are in line with project budgets.
: Provide technical support to the projects on design matters during Construction, detail engineering, procurement, fabrication, testing, installation, and commissioning and start up stages of the project, as well as during operations and maintenance stages, which often involves site visits, mobilization to facilities at appropriate phases of the project.
: Take control of piping list/ schedules
: Review and endorse pipe stress analysis studies.
: Plan, schedule, coordinate and perform major piping installations, maintenance, and inspections.
: Provide on-site/ remote technical support and direction to assigned locations.
: Assist in turnaround planning and cost estimation of mechanical work related to piping.
: Support root cause analysis program for major failures.Drive resolution of highest impact issues with a strong sense of urgency and integrity. COMPANY : ABB LUMMUS GLOBAL B.V.
POSITION : PIPING ENGINEER
PROJECT : PIPE FABRICATION FOR
LYONDELL CHEMICAL NEDERLAND
ROTTERDAM THE NETHERLANDS /
: GAS DEVELOPMENT PROJECT
OHANET, ALGERIA
LOCATION : KINGDOM OF THAILAND
CLIENT : ARCO CHEMIE NEDERLAND, LTD. /
BHP PETROLEUM
DATE : AUG 2001 TO JUNE 2008
DUTIES AND RESPONSIBILITIES:
: Work as a Piping Engineer, assigned in engineering department.
: Responsible for the revision of fabrication drawing both Piping & Structural.
: Interpret and Explained construction drawing to the sub-contructor regarding the descreapancies of shop drawing.
: Working with the network by transferring and getting information data from the engineering head office (Netherland).
: Working in micro-soft access Database for complete information regarding the Line list, Hold Isometric drawing and other related document.
: Responsible to issue Shop instruction & Shop memo regarding the querry on shop.
: Responsible to reply technical querry coming from the sub-contractor.
: Responsible to up-date status report for engineering matter regarding the remaining item by using micro-soft excel and word.
: Do a model scale drawing & Other related drawing by using Autocad released 2000. COMPANY : DAELIM INDUSTRIES & ENG’G.CO.LTD.
POSITION : PIPING ENGINEER
PROJECT : ILIJAN 1200MW COMBINE CYCLE
POWER PLANT
LOCATION : ILIJAN, BATANGAS CITY, PHILIPPINES
DATE : OCT. 2000 – AUG 2001
DUTIES AND RESPONSIBILITIES:
: Assigned as a Piping engineer in engineering department
: Responsible for design work both Piping & Structural.
: Review the Design analysis, Interpret the drawing and specification.
: Responsible for the preparation of construction drawings, such as isometric, detail pipe support drawing and other engineering works.
: Prepared material take-off and cost estimate as required for the change order and additional work.
: Conduct site survey need for the line checking and line modification.
: Revised and Check Piping plan include isometric drawing as per P & ID’s, Engineering specification and actual condition at site. COMPANY : SAMSUNG HEAVY & INDUSTRIES CO.LTD.
POSITION : PIPING ENGINEER
PROJECT : 56 OIL STORAGE TANKS FOR 150,000
BPSD REFINERY
LOCATION : THAI PETROCHEMICAL INDUSTRY
RAYONG, THAILAND
CLIENT : THAI PETROCHEM INDUSTRY(TPI)
DATE : SEPT. 1999 – SEPT. 2000
DUTIES AND RESPONSIBILITIES:
: Assigned as a Piping Engineer in engineering department.
: Responsible to do Design and Calculation works.
: Review and Interpret drawings and engineering specification.
: Conduct site analysis for engineering problems and design deficiencies, and recommend
immediate action to the field engineer.
: Monitor all piping work if done accordance with the latest revision of drawings and specification.
: Assigned to handle existing area for more than 200 Tie-in points to checked construction
drawing and existing line based on P & ID’s and actual condition at site.
: Initiates field change notice and additional work orders.
: Prepared material take-off and cost estimate as required for change work for the purpose of material control and cost estimate.
: Preparation of documents for answering client queries on engineering matters.
: Study and review the design concept of all pipe line connection to Tank, Equipment and Existing pipe line based on P & ID’s prior for fabrication and erection.
: Updating Plan drawings regarding the field changes & revision. COMPANY : HYUNDAI ENGINEERING & CONSTRUCTION
POSITION : PIPING ENGINEER / SUPERVISOR
PROJECT : TCCU & MIXED XYLENE UNIT
REVAMPING PROJECT
LOCATION : PETRON BATAAN REFINERY
LIMAY, BATAAN, PHILIPPINES
CLIENT : PETRON BATAAN REFINERY (PBR)
DATE : MARCH 1999 – SEPT. 1999
COMPANY : YU CHU ROQUE CONSTRUTION CO. LTD.
POSITION : PIPING SUPERVISOR
PROJECT : UTILITY REVAMPING PROJECT
LOCATION : PETRON BATAAN REFINERY
LIMAY, BATAAN PHILIPPINES
CLIENT : DAELIM ENGINEERING & CONST’N.CO.
DATE : JULY 1998 – FEB. 1999
COMPANY : DAELIM ENGINEERING & CONST’N CO.
POSITION : PIPING ENGINEER
PROJECT : PETRON BATAAN REFINERY EXPANSION
LOCATION : PETRON BATAAN REFINERY
LIMAY, BATAAN, PHILIPPINES
CLIENT : PETRON BATAAN REFINERY
DATE : JUNE 1997 – JULY 1998
COMPANY : POONG LIM INDUSTRIAL CO; LTD.
POSITION : PIPING ENGINEER / QA-QC STR’L. INSPECTOR PROJECT : EQUATE INFRASTRUCTURE
LOCATION : STATE OF KUWAIT
CLIENT : FLOUR DANIEL LTD.
DATE : APRIL 1996 – APRIL 1997
DUTIES AND RESPONSIBILITIES:
: Assigned as a Piping Engineer in engineering department.
: Responsible in design drafting work for piping such as making isometric drawing, detail pipe support and other related works.
: Preparing material estimate, quantity take-off required for processing of field material request.
: Conduct site survey for research work needed for some designed calculation prior to Revision per instruction of the immediate supervisor.
: Responsible for document controlling, distribution of isometric drawing and other related engineering documents.
: Performed site inspection on installation of all structural erection.
: Checking and inspect quality of material in accordance to the material specification before and after erection.
: Preparing and Applying for pre-inspection notice to the client if there is any modification required after erection.
: Responsible to performed field inspection on all ongoing and completed works for the erection of structural.
: Conduct site inspection with the client for the punch list item.
: Closing of NCR, (Non-conformance report), SR (Surveillance Report), SER (Site Engineering Request) given by the client and other similar works.