CURRICULUM VITAE
Md. Wahiduzzaman
Mobile 009****-***-****
E-mail: adjwgx@r.postjobfree.com
Alternate email: adjwgx@r.postjobfree.com
OBJECTIVE:
Pursuing an innovative Project Management position in the field of Engineering and Construction. Field of interest includes Construction management, Project Control and Estimation & Budget.
1.
Educational Qualification
:
B. Sc. Engineering (Elect. & Electronic)
Passed in 1988
From Khulna University of Engineering & Technology, Bangladesh
2.
Computer Skills
:
12 weeks short course on computer programming
MS- Project
PRIMAVERA
MS Word
MS-Excel
MS-Power Point
3.
Foreign Training
:
Attend 2 Weeks training on Generator Control (PLC) system at Dale Power Solution in England.
CANDY Estimation Software Training in Bahrain.
4.
Seminar/Training Attended
:
ISO -9001 -2015 awareness training under TUV Saudi Arabia
Internal Audit training under TUV Saudi Arabia
Project Management and Budget Control System under Markus Evans, Dubai
Risk Assessment Seminar arranged by McDermott & Saudi ARAMCO, conducted by Intever Canada, held in Dubai
Successfully completed ISO 9001: 2008 Lead Auditor training Course under Larnaca Management Consultants Wll, Bahrain
Attend PMP Exam Preparation course in Saudi Arabia by PMI.
Successfully Completed Lead Auditor Course 9001-2015 in the year 2020.
Attended seminar in Dubai for CANDY estimation Software.
5.
Experience Summary
:
30+ Years of experience in project management, construction, project estimation & bidding
Experience in Saudi Arabia
:
20+ Years
Experience in Bangladesh
:
11 +Years
6.
Experience Details
Project Management
:
Project coordination,
Planning & scheduling
Design review
Technical clarifications
Material sourcing & procurement
Field Assistance for resolution of problems
Testing & commissioning
Development of Construction Bid Specification
Invoicing
Preparation of Change order item
Establish, monitor and maintain up to date Safety and Quality plans for the project
Lead to Prepare the lesson learned document
Budget Preparation, Estimation & Bidding
:
Preparation of Budget & Budget Control
Estimation
Preparation of BOQ & bid documents,
Preparation of Commercial Proposal
Guidance for preparation of Technical Proposal
Planning and Schedule
Bid clarifications,
Technical clarifications & commercial negotiation,
Procurement & resource planning etc.
Having sound knowledge of preparing contract between world famous company such as McDermot, SAIPEM, HITACHI, FUTAI Arabia, SNC Lavalin etc…
Having knowledge about FIDIC Contract
7.
Employment Record
From June 2000 to date
:
1.Abahsain Consolidated Co. for Energy & Power ltd, Saudi Arabia.
From November 1989 to May 2000
:
Rural Electrification Board (REB),
Bangladesh
8.
Projects worked
S/N
Project
Client
A.
Saudi Arabia
8.1
Construction of 115/13.8 KV Faisaliyah 2 S/S
Saudi Electricity Co. SEC- NG (at present)
8.2
Power Supply to Safaniyah
Saudi ARAMCO
8.3
Sea water Cooling Sub-Station, Jubail.
Royal Commission
8.4
HV work at Qurayyah Sea Water Treatment Plant
Saudi Arabian Oil Company (ARAMCO), Saudi Arabia
8.5
East West Pump Station Control System Upgrade
Saudi Arabian Oil Company (ARAMCO), Saudi Arabia
8.6
Hawiyah Inlets & Auxiliary Facilities – 230/13.8 KV Substation
Saudi Arabian Oil Company (ARAMCO), Saudi Arabia
8.7
Up gradation of 115/13.8 KV Sub-station, NAVAL BASE, Jubail
Saudi Electricity Company, Saudi Arabia
8.8
Berri Power Plant – 115/13.8 KV Substation
Saudi Electricity Company, Saudi Arabia
8.9
230/34.5 KV substation
IBN BAYTAR, SABIC
8.10
115 kV transmission line RAFEAH
Saudi Electricity Company
8.11
Upgrading of MAJARDAH 132/33 KV S/S
Saudi Electricity Company
8.12
132/33 KV KHAMIS New Substation
Saudi Electricity Company
8.13
34.5/13.8 KV Sub-station in SABIC Technology Center
SABIC R & T
8.14
Installation, testing & commissioning of Electrical Equipments
National Industrial Gases Company (GAS), SABIC
Jubail, Saudi Arabia
8.15
SCADA panels replacement at various SEC substations
Saudi Electricity Company
Eastern Region Branch
8.16
Replacement, testing & commissioning of 3 Power Transformer, NATD
Saudi Electricity Company,
Saudi Arabia
8.17
Replacement of 230/13.8 KV, 149 MVA transformer
National Industrial Gases Company (GAS), SABIC
Jubail, Saudi Arabia
8.18
Revamping of Generator Control Panel
SHARQ, SABIC, Saudi Arabia
8.19
Replacement of 13.8 KV SWGR
HADEED, SABIC, Jubail
B.
Bangladesh
8.20
Project Division, Barisal
Rural Electrification Board
8.21
Central Warehouse, Khulna
Rural Electrification Board
9.
Project scope
9.1
9.2
9.3
9.4
9.5
Construction of 115 KV Faisalyah 2 S/S
Power Supply to Safaniyah
Project
Scope
Project
Scope
Project
Scope
Project
:
:
:
Close follow up for the procurement and design work, supervision of construction work, coordinate with Client and the company top management.
Project Management, Supervision of Design and Engineering, Procurement and Construction of 230/115 KV, Substation, 230 KV and 115 KV Overhead Transmission line, Control and Protection system with PSA and Communication system.
Sea Water Cooling Sub Station, Jubail
Supervision of Installation, Testing and commissioning of 115 KV GIS, Power cable, related control and protection and instrumentation work.
Qurayyah Sea water treatment Plant 230/34.5 KV GIS Substation
Engineering & Design, Procurement and Construction of 230 KV Transmission Line between Substation # 10 and 30, Outdoor Switchyard and 230 KV GIS equipment installation, Testing and Commissioning
East West Pump Station Control System Upgrade
Building Extension, Replacement of Process Automation System at East West Pump Stations # 1 to 11 and PRS # 1.
HAWIYAH Inlets & Auxiliary Facilities – 230/13.8 KV Substation
Scope
:
Installation, testing & commissioning of 60/80 MVA Power Transformer, Circuit Breaker, and Disconnect switch, CCVT, Surge Arrester, Mimic Control Panel, Protection Panel, SCADA, SOE & DFR panel, MV/LV cables.
9.6
Project
:
IBN-BAYTER Substation - 230/34.5 KV
Scope
Installation of 35/47 MVA Power Transformer, 230 KV Circuit Breaker, Disconnect switch, CCVT, Surge Arrester, Control, Protection & Communication Panel. Testing and commissioning the same
9.7
Project
Naval Base Substation, Jubail
Scope
Installation of 33.44/46.88 MVA Power Transformer, 115 KV GIS, Protection Panel & Communication Panel and testing & commissioning the same
9.8
Project
Berry Power Plant and Jubail City S/S
Scope
Installation Testing and Commissioning of Control and Protection Panel.
9.9
Project
Upgrading Majardah 132/33 KV S/S
Scope
Installation 132 KV GIS, 132/33 KV 70 MVA Power Transformer, 33 KV SWGR and Control Panel Control and Power cable laying and Termination
9.10
Project
132/33 KV Substation at Khamis
Scope
Installation of 100 MVA 132/33/13.8 KV Power Transformer, 33, 13.8 KV SWGR, 132 and 33 KV Relay and Control, Panel, SCADA Panel and Testing and Commissioning the same.
9.11
Project
34.5/13.8 KV New Substation at SABIC Technology Center
Scope
Installation of 20 MVA 34.5/13.8 KV Power Transformer, 34.5 KV and 13.8 KV SWGR, Develop the complete interconnection Diagram for the complete substation, testing and commissioning the same
9.12
Project
Installation of Elect. Equipments at GAS
Scope
Installation of 33 MVA 34. 5 /13.8 KV Transformer, Battery Charger, 1000 KVA Generator, Emergency Power supply panel, laying and termination of Power and Control cable, testing and commissioning the same
9.13
Project
SCADA Panel Replacement
Scope
Dismantling of old RTU and IFC panel, Installation Testing and Commissioning New RTU and IFC Panel including cabling and testing and commissioning
9.14
Project
Replacement of Transformer 40 MVA
Scope
Dismantle the old transformer, Transport it to the store, reassemble and Testing the same. Installation of new Transformer, Protection Modification, testing and commissioning the same
9.15
Project
149 MVA 230/13.8 KV Transformer Dismantle and Reassemble
Scope
Dismantle of Transformer from ARAMCO Rastanurah, Transport it to Gas Jubail, Reassemble it, Testing and Commissioning and energize it, again dismantle from Gas, Reassemble it at ARAMCO Rastanurah and doing Testing and Commissioning.
9.16
Project
Revamping of Generator control Panel
Scope
Design, Engineering, Supply installation, Testing and commissioning of Generator control panel.
9.17
Project
Replacement of 13.8 KV SCRAP Shear SWGR at HADEED, SABIC, Jubail.
Scope
Design, Engineering, Supply, Installation, Testing and Commissioning of 13.8 KV SWGR at SCRAP Shear Substation at HADEED, upgrade/ modification of SCADA system.
9.18
Project
Assistant Engineer - Project Division Barisal
Scope
Design & Construction Supervision of 33/11 KV Substation, Overhead Distribution Line, Testing and commissioning the same. Management of Local Electrical and Civil Consultant. Inspection of Electrical & substation Construction materials. Administrative work
9.19
Project
Assistant Engineer- Khulna Warehouse
Scope
Post landing inspection of Hardware, Conductors, Insulators, OCR, Voltage Regulators, Power and Distribution transformer, Tools, Wooden Poles & Cross arm. Store Management, Maintenance electrical overhead lines and civil works.
9.20
Project Completed under Bidding Section since 2006 and won the project mentioned in sl # 1, 2, 3, 10, 14, 15, 16 and 17
1.Shaybah Expansion – Transmission Line and Substation
2.East West Pump Station Control System Upgrade
3.HV work at Khurais Water Treatment Facilities and Utilities
4.Electromechanical Work at Khurais (KUC) Project.
5.Upgrading ECC Dhahran Expec.Centre.
6.Shaybah overhead Transmission Line and Substation
7.Replacement of Electrical Equipment at Yanbu Refinery
8.Replacement of Obsolete Equipments at Tanajib
9.Replace obsolete Electrical equipments at Abqaiq Plants.
10. EPC of Mutrafiah 115 KV Substation
11.Engineering, Procurement and Construction of Khobar West 115/13.8 KV S/S
12. Gulf Link project – 400 KV Substation at Silla, Abu Dhabi
13. Gulf Link Project -400 KV S/S at Salwa, Qurayyah and Fadhili in KSA.
14. Reinforcement of Al Shate substation
15. Reinforcement of Muraikabat S/S
16. Replacement of BOCBs at Berry P/P
17. Power supply to ESPs and WIPs in Abqaiq area.
10.Social Activities: Ex-Chairman of School Governing Body of Bangladesh International School, Dammam, Saudi Arabia.
11.
Salary & Reference details
11.1
Current CTC
:
Gross: SAR. 30,000.00 / USD$ 8,000.00 per month
11.2
Expected CTC
:
Negotiable
Other benefit similar to current position or according to the company standard.
11.3
Joining Notice period
:
2 Months
11.4
Current Organization
:
Energy & Power Cont. Co. ltd. Saudi Arabia
11.5
Current Location
:
Saudi Arabia
11.6
Passport Details
:
BK0995833, Valid Up to May, 2021.
11.7
Reason for change
:
Better work environment, better salary, bright future.
11.8
Professional references
:
1. Monir Hossain Zamadder. IT Manager – Al Rouqee Group, Saudi Arabia.
Mobile:+966-**-***-****,
Email – adjwgx@r.postjobfree.com
2. Name: Mr. Fadel H. Al Saidi, Substation Division Manager, Saudi Electricity (National Grid) Co.
Cell- +966*********
Email: adjwgx@r.postjobfree.com
11.
Personal Information
11.1
Nationality
:
Bangladeshi
11.2
Date of Birth
:
16th July 1964
11.3
Religion
:
Islam
11.4
Marital Status
:
Married
11.5
Mailing Address
:
11.6
:
adjwgx@r.postjobfree.com
11.7
Telephone
:
Mobile : +966-**-***-****
11.8
Permanent Address
:
Street : GoldarPara Road
Location : Chotta BOYRA
District : Khulna
Country : Bangladesh