Post Job Free

Resume

Sign in

Engineer Engineering

Location:
Camberley, Surrey, United Kingdom
Posted:
February 01, 2021

Contact this candidate

Resume:

Deryck Ramkalawan

Surrey, United Kingdom

+447********* adjuxq@r.postjobfree.com www.linkedin.com/in/deryck-ramkalawan Senior Petroleum Engineer

Summary

Accomplished Engineer with career success leading petroleum engineering innovation for high-growth organisations. Proven ability in Well Interventions, Well Integrity, Artificial Lift Design, Production Operations, Digital Oilfield and engaging with multi-disciplinary subsurface teams. Knowledgeable, solutions focused, with a strong innovative and problem-solving approach, and an ability to comprehend and resolve complex well production and injection issues. Effectively communicate and collaborate effectively with all stakeholders, while providing technical support to both Drilling, Well Interventions and Field Operations activities. Key Areas of Expertise Include: Wellbore Performance Evaluation Production Optimisation Waterflood Optimisation Reservoir Management Facilities Management Workovers Well Planning Wellbore Abandonment Artificial Lift Design and Optimisation

(ESP, Gas lift, Jet Pump) Well Integrity Well Testing Production Logging Flow Assurance Stimulation Technologies Well and Reservoir Surveillance Slickline Coiled Tubing Hydraulic Fracturing Production Enhancement Integrated Asset Modelling Scale and Corrosion Control Chemical and Mechanical Conformance Decline Curve Analysis Nodal Analysis Risk Analysis Failure Analysis HAZOPS SIMOPS Contractor Management Contract Management Cost Control Continuous Improvement Teamwork and Capability Building Strategy and Implementation Coaching Mentoring and Staff Development Performance Improvement. Software Applications Skills

• Pipesim • Pipesim Net • Prosper • Mbal • GAP • IFM • IVM • OFM • Welflow • Frac-Pro • OSI – PI • OpenWells

• Spotfire • PEEP • WinGlue • Maximo • SAP • Well Tracer • Microsoft Office Career Experience

AppSmiths Technology, Kuala Belait, Brunei January 2021 to Present Senior Gas Lift Optimisation Engineer attached to Brunei Shell Petroleum (BSP) to identify and support well optimisation opportunities both onshore and offshore. Empowering advanced technology such as, Well Tracer, Advance Valve Tester and WinGlue to troubleshoot, identify and optimise wells while maximising the value of BSP assets.

Senior Gas Lift Optimisation Engineer

• Analyse well diagnostic data, Well Tracer, Echometer, Static and Flowing Surveys to optimise lift efficiency.

• Oversee well model update.

• Support BSP, Production Technologist, in well surveillance and identify well intervention candidates.

• Lead training on WinGlue and Gas lift Operations for both onshore and offshore personnel.

• Mentor Junior Engineers in Production Technology.

• Utilise Advance Valve Tester data and ensure gas lift system is preforming as designed. Occidental Oil and Gas Corporation, Muscat, Oman / Doha, Qatar September 2011 to May 2020 Engineering Advisor attached to the Asset Management Department. Directed Arab, Shuaiba, and Nahr Umr reservoir management strategy, establishing techniques to reduce stimulation and conformance issues in a highly complicated fractured waterflood reservoir. Led the injection and production optimisation in fields operated by Occidental Petroleum. Consulted with vendors to provide customised solutions for various well activities while generating project economics for well intervention and well integrity scopes. Production Operations Engineer Advisor

• Championed the WRFM team, reviews and studies, debottlenecking the water injection systems on 3 platforms increasing injection by 50000 BWPD, with a resulted forecasted oil rate gain of 1200 BOPD within 6 months.

• Designed choke models as part of the WRFM process to assist in identifying possible gas lift and power constraints for future wells. This led to a budget cost savings of USD7.5MM on adding an additional compressor, and ESP power distribution network optimisation.

• Headed the development of a theoretical Production Logging Tool, utilising petrophysical logs, FMI and Rel Perm data, successfully identifying, isolating and regaining 1200 BOPD from failed swell packer completions. Deryck Ramkalawan +447*********/adjuxq@r.postjobfree.com Page 2

• Spearheaded the engineering design, specifications and implementation of acid jetting for carbonate reservoirs, gaining 50-350 BOPD, as well as acid fracturing jobs through pinpoint stimulation technique with coil tubing in open-hole and cased-hole wells, increasing injectivity index by 300%.

• Designed and executed chemical and mechanical conformance jobs for openhole horizontal well, returning well to production with a water cut reduction of 30%.

• Reviewed underperforming wells and proposal for remedial treatment, data acquisition, lift optimisation, wellbore cleanouts, water shut-off and jet perforating, increasing wells production by 10-50%.

• Conducted in-house gas lift training, ESP design, modelling, optimisation, troubleshooting, gaslit snorkel and well straddle design, to achieve a potential gain 800 BOPD.

• Increased production from lift optimisation by 1700 BOPD and upgraded production system distribution model for improved surveillance and inferred production as part of the WRFM effort.

• Employed real time data acquisition and surveillance, well and pattern reviews, reservoir simulation, waterflood streamlines, production system performance to maintain base production and reduce field decline rate by 3%.

• Spearheaded the generation of production type curves for new and re-drilled wells using Decline Curve Analysis, rock type, geological location, historical mud losses and anisotropy data, to support drill well economics.

• Led both the Production and Reservoir Engineering inputs to Final Well Planning for 15 new wells, 3 re-drills and 5 workovers, wells performed 15% better than type-curve prediction.

• Optimised and managed waterflood patterns, generated OFM workflows, studied conformance issues and communicated with Field Operations to meet the VRR or IWR target for the field of 1.2

• Mitigated against well anti-collision issues, losses while drilling and well trajectory optimisation cutting drill cost by USD600K and drilling time by 1.25 days

• Technical authority for Well Integrity within Occidental Petroleum.

• Managed the Well Integrity multi-disciplinary team, developed and implemented WIMS, approved team objectives, prepared budgets, intervention programs, supervised planned scope and generated KPIs’.

• Resolved Well Integrity issues, generating processes, implementing best practices, formulating policies, guidelines and procedures for risk assessment, risk classification and risk mitigation of wells with sustained annulus pressure.

• Headed the development of a Well Integrity database to record and track problem wells on a monthly basis and allocated rig or non-rig resources for trouble shooting and resolving issues.

• Established casing pressure management program and field standing instruction for ESP wells, to prevent casing collapsed during early stage of production.

• Led the Well Integrity diagnostic, investigation and remediation programs to return wells in a safe condition and in compliance with international ISO 16530-1 and 16530-2 standards, within the specified timeline and saving approximately USD 10MM in rig costs.

• Oversaw cost effective repair solutions for well conductors whose structural integrity was borderline, extending conductors’ life from 4 years to 25 years.

• Spearheaded the generation of progress reports, HSE risk assessments and budget variances for intervention work resulting in both cost and time savings of USD 1MM and 12 non-rig days.

• Managed the Well Interventions barge for stimulations, Well Integrity, Production Enhancement, Slickline and Coiled Tubing jobs.

• Generated Well Intervention programs, organised offshore logistics, managed contractors, sourced downhole equipment, designed and executed stimulation treatments and saved USD 3MM in campaign costs.

• Implemented well abandonment programs for dual completion gas wells utilising both rig and coiled tubing saving USD 4MM in rig costs.

Maersk Oil, Esbjerg, Denmark November 2005 to September 2011 Managed the optimisation and production from existing assets in the Danish North Sea, reviewing artificial lift methods and production technology workflows to identify underperforming wells, as well as recommending and executing corrective actions to improve well performance. Executed data acquisition, well testing and monitoring, well forecasting and reporting of daily activities. Liaised with the reservoir engineering team to communicate status of optimisation and controls in-place to focus and follow up on sustaining gas lift injection in problem wells. Well Optimisation Specialist

• Optimised the gas lift network increasing production of 5000 BOPD as part of the WRFM strategy. Deryck Ramkalawan +447*********/adjuxq@r.postjobfree.com Page 3

• Spearheaded the WRFM reviews, identified un-conforming waterflood patterns, selected candidate wells for conformance treatment and increased pattern recovery by 15% with an overall production increase of 2000 BOPD over a period of 18 months.

• Stabilised fluid production from slugging wells and achieved a potential gain of 200 BOPD using velocity strings.

• Saved approximately USD500K per well through scale control and intervention, gaining a total of 1600 BOPD and reducing treatment costs to half.

• Re-achieved gas wells production of 45 MMSCFD, performing gas well de-liquefaction.

• Increased platform production by 1100 BOPD through delivering pipeline stability and flow assurance.

• Implemented and optimised chemical injection in gas lift gas for scale, corrosion, paraffin and emulsion control improving well uptime to 85% and pipeline stability.

• Led the design of gas lift completions, straddles, tubing selection, well and reservoir pattern optimisation.

• Member of the Well Integrity team co-wrote policies and guidelines and procedures for both production and well services teams based on NORSOK D-010. Established field standing instructions for wells with sustained annulus pressure.

• Guided well integrity software vendor with customisation of the well integrity database, casing pressure monitoring and tracking system and Well Integrity KPI reporting. Additional Relevant Experience

Schlumberger, Mexico / Malaysia June 2001 to November 2005 Senior Petroleum Engineer

BP, Trinidad and Tobago November 1997 to June 2001 Senior Production Operations Engineer

Mora Oil Ventures, Trinidad and Tobago January 1997 to November 1997 Petroleum Engineer

Tarmac, Trinidad and Tobago June 1994 to January 1997 QA/QC Inspector

Education & Credentials

Master’s in Petroleum Engineering (PGDip)

Bachelor of Science (BSc) Sciences

University of the West Indies

Professional Development

• Sand Control – Oil and Gas Consultants International Inc.

• Gas Production Engineering – Oil and Gas Consultants International Inc.

• Petroleum Risk Decision Analysis– Oil and Gas Consultants International Inc.

• Horizontal and Multilateral Analysis and Design – Oil and Gas Consultants International Inc.

• Horizontal and Multilateral Drilling and Completions – Oil and Gas Consultants International Inc.

• Production Optimisation using Nodal Analysis – Oil and Gas Consultants International Inc. Awards

• Production Optimisation ISND and ISSD Fields- Occidental Petroleum of Qatar Ltd.

• Surgi-Frac Stimulation ISND Field – Occidental Petroleum of Qatar Ltd.

• Contribution to health and safety, near miss reporting – Occidental Petroleum of Qatar Ltd.

• Bronze Medal for Production Optimisation Erb-West Field – Schlumberger Ltd.

• Interim Gas Supply Project for Initiative and Creativity – AMOCO.



Contact this candidate