Post Job Free

Resume

Sign in

Engineer Piping

Location:
Batam, Kepulauan Riau, Indonesia
Posted:
January 29, 2021

Contact this candidate

Resume:

Curriculum Vitae Bambang Sukamto

Mobile Phone: +628**-****-****

Email : adjsgo@r.postjobfree.com

Page 1

Name : BAMBANG SUKAMTO

Religion : Islam

Sex : Male

Marital Status : Married

Nationality : Indonesia

Place / Date of Birth : P.SERANG / Februari 25, 1992 Address : Jalan Arif Rahman Hakim Gg Gatra No.12 Seijang Tanjungpinang – INDONESIA

adjsgo@r.postjobfree.com

+628**-****-****

VOCATIONAL HIGH SCHOOL AUTOMOTIVE

1. PIPING ENGINEER Conducted By: OFFSHORE TECHNOLOGY INSTITUTE. Certificate No.OTI.PE-VIII.10.13.117.

2. OFFSHORE PIPELINE CONSTRUCTION Conducted By: OFFSHORE TECHNOLOGY INSTITUTE. Certificate No.OTI/OP/X.14/005.

3. OPERATOR K3 CHERRY PICKER Conducted By: PT.MULTI PRIMA DAYA PERKASA Certificate No. 19512 – OPK3 – PAA/IV/2013.

4. HILTI DX-460F8 (Irod Fastening) Conducted By: PT.HILTI NUSANTARA Certificate No. 130*******.

5. HILTI X – MGR (Grating Fastener System) Conducted By: PT.HILTI NUSANTARA Certificate No. 130*******.

6. SAFETY LEADERSHIP WORKSHOP.

7. SAFETY LEADERSHIP SUMMIT.

PERSONAL DATA

EDUCATION

QUALIFICATION

Curriculum Vitae Bambang Sukamto

Mobile Phone: +628**-****-****

Email : adjsgo@r.postjobfree.com

Page 2

1. September 2017 to February 2019

PT.SINDOMAS PRECAST – Housing & Development Board

Client; ECCON Corporation – Singapore

Position as : Quantity Surveyor

Main responsibilities :

a. Study the bidding / contract documents, especially those relating to the calculation of work volume, work unit prices and payment procedures

b. Analyze the smoothness of bill of Quantities with work drawings, technical data and technical specifications.

c. Conduct research and evaluation of the availability of material resources, tools, personnel and funds for the implementation of each type of work.

d. Study work methods and project implementation schedules and equipment for building materials and labor used.

e. Make unit price analysis of work implementation based on BOQ analysis results, last field survey, work drawings, technical specifications, work methods and technical data.

f. Calculating the volume of materials, power and equipment needed based on drawings, technical specifications and other documents. g. Calculate the volume and make a work plan Budget plan - Evaluate the volume and cost of carrying out the work.

h. Checking the calculation of the volume of work submitted by the project - which is based on the results of measurements in the field including work carried out by sub-contracts.

i. Calculate unit volume and price for job changes. j. Prepare data to support the creation of Certificate of Payment based on the work results.

k. Giving consideration in resolving problems or contract administration disputes.

2. November 2014 to September 2016

PT. DWI CAHAYA SEJATI - Bechtel Corporation

Client; Wheatstone LNG Project-LNG Module – Chevron Australia Pty Ltd. Position as : Quantity Surveyor

Main responsibilities :

a. Verify all material that received based on material specification in ISO drawing

b. Verify Dimension for cutting length and prepare the report. c. Inspection for spools after fit-up (joint preparation, dimension, rotation, schedule and material) before production and QC inspection.

d. Follow up drawing revision and outstanding material. - Follow safety procedures.

WORK EXPERIENCE

Curriculum Vitae Bambang Sukamto

Mobile Phone: +628**-****-****

Email : adjsgo@r.postjobfree.com

Page 3

e. Provided 3D model location using Smart Plan Reviewer (SPR). f. Prepare completed spools report and delivery materials for data entry.

g. Material traceability and documentation.

h. Various reports asked for on a daily basis by the Area Manger and often are required to support daily decisions.

i. Provided on using BPS, the standard software to support the Area Manager and his request to track Equipment, Material and various tractable items such as weld point control, flange condition and status just to mention a few points.

j. Adjust traceability progress with a predetermined schedule. 3. Februari 2013 to September 2014

PT. DWI CAHAYA SEJATI - Bechtel Corporation

Client; Australia Pacific LNG Project-LNG Module – ConocoPhillips Australia Pty Ltd. Position : Asst.Piping Field Engineer

Main responsibilities :

a. Carries out WBS (Work Breakdown Structure) and the established work requirements to support the schedule.

b. Identifying all required technical and quality documentation that will be included in the piping work packages.

c. Prepared and issued all required piping work packages. d. Updated existing work packages to reflect changes in the scope of work or documentation.

e. Conducted monthly People Based Quality (PBQ), training material provided as per trend quality issue.

f. Review Safety Task Analysis and Risk Reduction Talk/Job Hazard Analysis (STARRT/JHA) card.

g. Provided technical support to craft supervision and craft personnel in understanding work package scope and requirements. h. Verify daily quantity report.

i. Responsible for piping completion of two Propane Modules (101JA

,202JA).

j. Raise PTR (NCR or FCD) related support engineering, construction and material issue,

k. Conducted flange management inspection, flange cleanliness, flange Alignment and flange final bolt-up, inspection flange final bolt up value for Hand torque, Hydraulic torque and Hydraulic Tensioning method.

l. Arrange schedule and liaise with client for pre-test walk down and final walk down.

m. Verify work completion, acceptance and closure of the piping work package, completion all documentation of work package prior submits to turnover team.

Curriculum Vitae Bambang Sukamto

Mobile Phone: +628**-****-****

Email : adjsgo@r.postjobfree.com

Page 4

4. May 2012 to September 2012

PT. TRIPATRA Engineers - Construction Corporation–South Sumatera NGL Client; PERTA SAMTAN GAS Pty Ltd.

Position : Pipe Fitter

Main responsibilities :

a. Pipe Fitter safety procedures carried out in accordance with applicable regulations.

b. Personal Protective Equipment / PPE Pipe Fitter used in accordance with the conditions of employment.

c. Know and understand the work equipment or piping and / Type Material and Steel.

d. Applying mathematical techniques in engineering calculations on pipe work (piping).

e. Applying the basics of plumbing and or / adjustment fitting with a pipe.

f. Literacy and numeracy measures in the pipe spool isometric drawings

g. Metal cutting, steel, pipes using flame cutting torch and or / cutting torch

h. Assemble / fabrication: Riser, lateral 45, Pipe Miter, Concentric Reducer, Pipe template, Lay Out, Cut ODD, Angle Elbow 90



Contact this candidate