Post Job Free

Resume

Sign in

Engineer Civil Engineering

Location:
Puducherry, India
Posted:
January 29, 2021

Contact this candidate

Resume:

CURRICULUM VITAE

Deputy team Leader/Infrastructure specialist/Contract Manager/Project Manager

Mobile No 733-***-****

Email Id adjscw@r.postjobfree.com

34+ Years

Name of Expert – SEGARAN SUBRAMANIAN

Date of Birth

Citizenship

19/06/1965

Indian

Education Qualification

Master of Technology in (Advanced Construction Technology), January 1998. (Ist Class/Distinction) Pondicherry Engineering College, Pondicherry University, India.

Bachelor of Civil Engineering, (AMIE, MIE.) December 1992, The Indian Institute of Engineer’s, Calcutta, India.

Diploma in Civil Engineering, April 1983 Motilal Nehru, Government

Employment Record

Period

Employing organization/ Title, Position/ Contact Information for reference

Country

Summary of activities relevant to assignment

September 2018 - Till date

Employer: Nippon Koei India Pvt. Ltd. PM Consultant.

Position: Infrastructure specialist cum Water supply, Sewerage and Drainage expert

India

Reconnaissance Survey for Water Supply & Sewerage Facilities

Conducting Pre-Feasibility & Feasibility Studies

Preparation of Regional Master Plans

Preparation of conceptual reports

Attending Meeting with respective State Government and Central Government offices

Preparation of Basic designs, Detailed designs

Preparation of Detailed Project Reports [DPRs] for water supply, Sewerage, Storm Water Drainage and SWM projects.

Preparation of Bill of Quantities, Specifications and Rate Analysis.

Planning of Utility management along with road infrastructure.

Review of urban infrastructure demand-supply gaps including roads and identifying appropriate solutions

Preparation of Detailed Cost Estimates

Cost-Benefit Analysis

Liaison with client and stakeholders

Co-coordinating with Topographical, Geo-technical and Hydro-geo surveys.

Project Planning & Scheduling and Management.

May 2015 to May 2018

Employer: ADNOC,.-Client side

Managing four PM Consultant.

Position: Senior Quantity Surveyor Engineer/ Contract Administration.(Equivalent to DTL)

Abu Dhabi /UAE

Generally managing both Pre and Post tender works of service station and Airport fueling system and industrial projects.

Review of Tender and Agreement B.O.Q for various service station and Industrial projects.

Review and finalizing the tender queries and contractual process to finalize and award of tender.

Review and approve the consultant and contractor Interim and final payments.

Review and finalize the consultant and contractor variation applications.

Claim review & recommendation and Contractual correspondence.

Preparation of estimates and cost for additional works.

Monitor project contractual status and cash flow

Cost Estimation and Unit rate fixing based on the current market rates. Project Management overall in all respects.

May 2003 – May 2015

Employer: De Leuw Cather International (Parsons) Ltd, PMC for major infrastructure projects.

Position: Project Senior Quantity /Quality control/ Contract management(Equivalent to DTL)

Abu Dhabi/UAE

Recapitulation of each B.O.Q Items for assessing the actual contract amount.

Claim review & recommendation and Contractual correspondence.

Preparation of estimates and cost for additional works.

Implementation and supervision of water supply, Sewerage, Storm Water Drainage and SWM projects.

Contract Management and quality control of the project works.

Preparation of detailed Estimate for the water supply, Storm Water Drainage and SWM projects.

Review of field measurement for payment.

Monitor project contractual status and cash flow

Valuation and Processing of Monthly Payment Certificates.

Cost Estimation and Unit rate fixing based on the current market rates.

Preparation of Variation Orders and Monthly progress report.

Computation & finalizing the final pay quantities and close-out of the project.

Nov 2001 to Feb 2003

Employer Bin Hafeeze EST.,-Contractor.

Position: Senior Quantity Surveyor cum site supervisor(Equivalent to DTL)

Abu Dhabi/UAE

Implementation and supervision of Water supply, Storm Water Drainage and sewerage projects.

Contract Management and quality control of the project works.

Preparation of detailed Estimate for Storm Water Drainage and sewerage projects.

Recapitulation of each B.O.Q Items for assessing the actual contract amount.

Claim review & recommendation and Contractual correspondence.

Preparation of estimates and cost for additional works.

Review of field measurement for payment.

Monitor project contractual status and cash flow

Valuation and Processing of Monthly Payment Certificates.

Cost Estimation and Unit rate fixing based on the current market rates.

Preparation of Variation Orders and Monthly progress report.

Computation & finalizing the final pay quantities and close-out of the project.

August 1986 to October 2001

Employer: Public Work Department, Pondicherry

Position: Junior Engineer

India

Involved in the preparation of Estimates, structural design and drawing for the construction of multistoried buildings and factory sheds of major projects each costing more than five Crores of Rupees using software like AUTO CAD and STAAD III. Design, Construction and Maintenance of water supply projects in Rural and Urban areas consisting of Water tanks of various capacities, Distribution lines,Bore wells and all related water supply work and storm water drainage for the final implementation of the scheme.

Also supervision and implementation of sewerage project for the newly developed areas in Puducherry.

April 1983 – August 1986

Employer: PWD Pondicherry

Position: Technical Assistant

India

Structural Design of Buildings up to 10 stories.

Preparation of Bills of quantities and Tender documents for different projects.

Site inspection and quality inspection of contractor’s works for various projects.

Check the bills submitted by the Contractor and forward it to the Client.

Check the structural drawings prepared form the Drafting department.

Execution of Residential and Commercial Multistoried structures, Roads & Irrigation Works.

Membership in Professional Associations and Publications: Member of AACE and obtained CCP(Certified Cost Professional) in 2010

Registered with RICS and Registered No 1287395

Planning and cost control certificate course in PRIMAVERA in 2009

Member of Institute of Engineer (India) and charted Engineer status

Member of Indian Institute of Quantity surveyor. Pass in the PRIMAVERA (P3) – in 2009No. 7395

Other Trainings:

WCERTIFICATION: Dr.Visvasaraiha Memorial Award for the thesis in M. Tech final project

Knowledge in Basic FIDIC Conditions of Contract (Obtained Certificate for attending 16 Hr course for FIDIC ’99 Conditions of Contract – Red Book by the Society of Engineers U.A.E)and CESMM3

COMPUTER SKILLS:

In the computer field, having Knowledge in software’s like AUTO CAD and STAAD Pro and I used for the preparation of multistoried structural designs, detailing and drawing and also having knowledge in Ms Office (Excel, Word etc.,)

Designed Major building structures using the STAAD Pro software and the Reinforcement details are prepared for the structural components using the AUTO CAD interface.

Having Knowledge in the planning and cost control Engineering and completed certificate course in the PRIMAVERA (P3)

the best project in Advanced Construction Technology (. strength and Durability Properties of concrete using Rock dust as fine aggregate in place of riv

Language Skills

Proficiency

Speaking

Reading

Writing

English

Excellent

Excellent

Excellent

Tamil

Excellent

Excellent

Excellent

Hindi

Excellent

Malayalam

Excellent

Adequacy for the assignment

Detailed tasks assigned on consultant’s team of experts:

Overall Project Management and Control

Management and Assigning Tasks to other Key Experts

Coordinating with other team members for necessary timely inputs

Analysis of potential urban development issues in ABD and Pan-city proposals.

Review of Urban development guidelines and policies

Engaging Sub-consultants and Survey agencies

Preparation of Situation Analysis Report Conceptual Design, Feasibility, Basic Design, Detailed Project Report, BoQs, Rate analysis, Cost estimates, Specifications and Tender Documents

Retrofitting and Re-Engineering for various utilities

Bid Process Assistance for selection of contractor for each module.

Coordination with client and other stakeholders.

Techno-Economic Evaluation of project components and Cost-benefit analysis

Construction Supervision and Quality Control

Project Planning, Scheduling and Monitoring progress of works.

Liaison with client and suggestions for timely implementation of works

Attending Meetings with Client and Stakeholders

Meetings with MoUD along with Client

Preparation of Monthly, Quarterly Progress Reports

Reference to prior work or assignments that best illustrates capability to handle the assigned tasks

Project 1

Project Management Consultant (PMC) for assisting Pondicherry Smart City Development Limited (PSCDL) to Design, Develop, Manage and Implement Smart City Projects under Smart City Mission (SCM).

Year

September 2018-Till date

Client

Pondicherry Smart City Development Limited(PSCDL)

Location

Pondicherry

Positions held

Water supply, Sewerage and drainage Expert/Deputy team leader

Main project features :

To support the Smart City in overall project management of Smart City Projects, including designing, developing, managing and implementing smart city projects identified by the city on the two outputs i.e., Area Based Development (ABD) and Pan City Solution

Activities performed:

Responsible for Overall Project Management and Control, Review of Inception Report, Situation Analysis, Design Basis Report, Preparation of Feasibility and Concept Report, Preparation of DPR's, Preparation of BOQ, Preparation of RFP’s, Tender Documents. Coordinating with the other internal departments in the project and Liasoning with Client and stake holders for getting necessary approvals from the client. Design, and preparation of DPR for water supply projects and storm water drainage network in Urban areas consisting of major primary and secondary drains and Water tanks of various capacities, Distribution lines,Bore wells and Revamping and augmenting the existing sewerage system and tertiary treatment plant at STP for recycle of water and the final implementation of the scheme in Puducherry pan city area

Project 2

Design and construction of various Fuel service station, Airport fuelling system and Industrial Projects related to oil and Gas in UAE

Year

May 2015 to May 2018

Client

ADNOC, Abudhabi

Location

Abu Dhabi

Positions held

Senior Quantity Surveyor Engineer/ Contract Administration

Main project features:

As a client contract and quantity surveying Engineer overall in charge for all contractual process in pre and post tender stage. Reviewing PMC performance for design and construction stage and finalizing the payment for contractor and consultant including all claims from PMC and contractor.

Activities performed

Generally managing both Pre and Post tender works of service station and Airport fueling system and industrial projects.

Review of Tender and Agreement B.O.Q for various service station and Industrial projects.

Review and finalizing the tender queries and contractual process to finalize and award of tender.

Review and approve the consultant and contractor Interim and final payments.

Review and finalize the consultant and contractor variation applications.

Claim review & recommendation and Contractual correspondence.

Preparation of estimates and cost for additional works.

Monitor project contractual status and cash flow

Cost Estimation and Unit rate fixing based on the current market rates

Project 3

New Corniche Road East – Road works, Tunnel, underpasses water Features and Landscaping works for Abu Dhabi Municipality.(Project amount AED.600.00 Million)

Year

2003 May – July 2008

Client

Abudhabi Municipality

Location

Abu Dhabi

Positions held

Project Senior Quantity Surveyor/ Contract Administrator

Main project features:

Municipality of Abu Dhabi has undertaken major road improvement schemes in the Cornices, Abudhabi. It consists of 12 under passes, two tunnels, and 144 small structures like water features, parking structures, 8-lane Road and nearly 3.25 Km promenade improvement by constructing sea wall and massive tiling works with tent structures and lot of recreational units. It also consists of major landscape work( Hard and soft ) nearly AED.150Million

Municipality of Abu Dhabi has undertaken major development schemes on the existing Salam Street in Abu Dhabi City in three sections and the most intricate section was awarded to the Joint-Venture, Samsung-Saif Bin Darwish in 2008 to be completed at the end of 2011. The open sections and access ramps at ends are of cast-in-place concrete box slab and wall. The volume of the concrete works approximately is 550,000 m3. It consists of relocation of the massive utility lines of water, sewers and storm drainage network, potable water lines, Electrical and Telephone lines and plants, fiber optic cables, gas pipe lines, etc. The utility lines found in clusters are to be relocated to the new service corridor without damage and disruption to services.

Activities performed

Recapitulation of each B.O.Q Items for assessing the actual contract amount.

Claim review & recommendation and Contractual correspondence.

Preparation of estimates and cost for additional works.

Review of field measurement for payment.

Monitor project contractual status and cash flow

Valuation and Processing of Monthly Payment Certificates.

Cost Estimation and Unit rate fixing based on the current market rates.

Preparation of Variation Orders and Monthly progress report.

Computation & finalizing the final pay quantities and close-out of the project.

Project 4

Bridge & Tunnels at IP-44 and the Sea Palace Intersection on Al Salam Street for Abu Dhabi Municipality.(Project amount AED.850.00 Million)

Year

Aug 2008 – April 2011

Client

Abudhabi Municipality

Location

Abu Dhabi

Positions held

Project Senior Quantity Surveyor/ Contract Administrator

Main project features:

Municipality of Abu Dhabi has undertaken major development schemes on the existing Salam Street in Abu Dhabi City in three sections and the most intricate section was awarded to the Joint-Venture, Samsung-Saif Bin Darwish in 2008 to be completed at the end of 2011. The open tunnel sections and access ramps at ends are of cast-in-place concrete box slab and wall. The volume of the concrete works approximately is 550,000 m3. It consists of laying of massive utility lines of sewers, storm drainage network, potable water lines, Electrical and Telephone lines and plants, fiber optic cables, gas pipe lines, etc. The utility lines found in clusters are to be relocated to the new service corridor without damage and disruption to services.

The project involves four sections running from Al Salam Street to Al Mina Street and consists of five tunnels, a bridge, underpasses, surface and service roads.

The Sheikh Zayed Street Improvement Project consists of four construction contracts for grade-separated interchanges, tunnels, road widening and other improvements.

The AED 820m ($223m) worth contract two which involved two underpasses and a bridge connecting to Reem Island. Contract three runs from intersection of Al Saada Street intersection to Hazza Bin Zayed Road intersection and includes an 850m long tunnel and a bridge to Al Reem Island

Activities performed

Recapitulation of each B.O.Q Items for assessing the actual contract amount.

Claim review & recommendation and Contractual correspondence.

Preparation of estimates and cost for additional works.

Review of field measurement for payment.

Monitor project contractual status and cash flow

Valuation and Processing of Monthly Payment Certificates.

Cost Estimation and Unit rate fixing based on the current market rates.

Preparation of Variation Orders and Monthly progress report.

Computation & finalizing the final pay quantities and close-out of the project.

Project 5

Development of South Shamkha infrastructure.(Project amount around AED.7.0 Billion)

Year

June 2011 – April 2015

Client

Musanada,Abudhabi,UAE

Location

South Shamkha Near Mafreque, Abu Dhabi

Positions held

Senior Quantity Surveyor

Main project features

Complete design development including environmental studies and geotechnical engineering, tender documents and evaluation, work supervision of South Shamkha infrastructures and utilities.

It consists of laying of massive utility lines of sewers, storm drainage network, potable water lines, Electrical and Telephone lines and plants, fiber optic cables, gas pipe lines, etc.

Implementation and supervision of Water supply, Storm Water Drainage and sewerage projects and construction supervision of STP.

Contract Management and quality control of the project works.

Preparation of detailed Estimate for Water supply and Storm Water Drainage and sewerage projects.

South Shamkha Development project area is approximately 40 sqkm.

South Shamkha is a mixed use development for up to 165,000 residents and an estimated 130,000 non-residents working in offices, retail, and commercial activities along with public and social facilities.

Activities performed

Recapitulation of each B.O.Q Items for assessing the actual contract amount.

Claim review & recommendation and Contractual correspondence.

Preparation of estimates and cost for additional works.

Implementation and supervision of Water supply, Storm Water Drainage and sewerage projects.

Contract Management and quality control of the project works.

Review of field measurement for payment.

Monitor project contractual status and cash flow

Valuation and Processing of Monthly Payment Certificates.

Cost Estimation and Unit rate fixing based on the current market rates.

Preparation of Variation Orders and Monthly progress report.

Computation & finalizing the final pay quantities and close-out of the project.

Project 6

Project for discharge of storm water and Sewerage outlets, at Mafreque, Abudhabi, UAE.(AED 60 Million)

Year

November 2001 to February 2003

Client

Abudhabi Municipality

Location

Mafreque, Abu Dhabi

Positions held

Senior Quantity Surveyor

Main project features

Construction and implementation of storm water and sewerage system at Mafreque Abudhabi as per the ADM, Abudhabi design and development requirements.

Activities performed

Recapitulation of each B.O.Q Items for assessing the actual contract amount.

Claim review & recommendation and Contractual correspondence.

Preparation of estimates and cost for additional works.

Implementation and supervision of Storm Water Drainage and sewerage projects.

Contract Management and quality control of the project works.

Review of field measurement for payment.

Monitor project contractual status and cash flow

Valuation and Processing of Monthly Payment Certificates.

Cost Estimation and Unit rate fixing based on the current market rates.

Preparation of Variation Orders and Monthly progress report.

Computation & finalizing the final pay quantities and close-out of the project.

Project 7

Veterinary college costing more than Rs. 20 Million

Year

August 1986 to October 2001

Client

Government of Pondicherry

Location

Pondicherry

Positions held

Junior Engineer

Main project features

Preparation of Detailed Design and Estimation with BOQ for the pretender stage and detailed structural details and drawings with guidance as per Indian standard for the post tender stage for the execution of the project.

Activities performed

This is a four storied RC framed structure, estimated, designed and prepared structural drawings. The structure was designed for all the load combination including wind and earthquake. This building consists of lot of special item of work like complete improvement and development of the college campus

Project 8

Women’s polytechnic costing around Rs. 15 Million

Year

August 1986 to October 2001

Client

Government of Pondicherry

Location

Pondicherry

Positions held

Junior Engineer

Main project features

Preparation of Detailed Design and Estimation with BOQ for the pretender stage and detailed structural details and drawings with guidance as per Indian standard for the post tender stage for the execution of the project.

Activities performed

This is a three storied RC framed structure, estimated, designed and prepared structural drawings The structure was designed for all the load combination including wind and earthquake.

Project 9

Dental College costing around Rs. 23 Million

Year

August 1986 to October 2001

Client

Government of Pondicherry

Location

Pondicherry

Positions held

Junior Engineer

Main project features

Preparation of Detailed Design and Estimation with BOQ for the pretender stage and detailed structural details and drawings with guidance as per Indian standard for the post tender stage for the execution of the project.

Activities performed

This is a four storied RC framed structure, estimated, designed and prepared structural drawings. The structure was designed for all the load combination including wind and earthquake .This building consists of lot of special item of work like complete improvement and development of the college campus

Project 10

Office Building, School and Hospital Buildings costing around Rs. 25 Million

Year

August 1986 to October 2001

Client

Government of Pondicherry

Location

Pondicherry

Positions held

Junior Engineer

Main project features

Preparation of Detailed Design and Estimation with BOQ for the pretender stage and detailed structural details and drawings with guidance as per Indian standard for the post tender stage for the execution of the project.

Activities performed

This is a five storied RC framed structure, estimated, designed and prepared structural drawings. The structure was designed for all the load combination including wind and earthquake load .This building consists of lot of special item of work as per the School and Hospital requirements.

Project 11

Small Bridges and Road Culverts

Year

August 1986 to October 2001

Client

Government of Pondicherry

Location

Pondicherry

Positions held

Junior Engineer

Main project features

Prepared manual designs for the small bridges and Road culverts as per the Indian Road Congress requirements.

Activities performed

Worked in the computer design center involved in the preparation of Estimates, structural design and drawing for the construction of multistoried buildings and factory sheds using software like AUTO CAD and STAAD III.

Project 12

Construction of Roads and water supply and Sewerage,Storm drainage Projects and Maintenance of urban water supply system

Year

August 1986 to October 2001

Client

Government of Pondicherry

Location

Pondicherry

Positions held

Junior Engineer

Main project features

Design, Construction and maintenance of Rural water supply, storm drainage, Sector Roads, NH45A, Housing and all related utilities.

Activities performed

Design, Construction and Maintenance of water supply projects in Rural and Urban areas consisting of Water tanks of various capacities, Distribution lines,Bore wells and all related water supply work and storm water drainage for the final implementation of the scheme.

Also supervision and implementation of sewerage network project for the newly developed areas in Puducherry. Also supervision and implementation of sewerage project for the newly developed areas in Puducherry.

Project 13

Various projects related to Irrigation, water supply and sector Roads

Year

April 1983 – August 1986

Client

Government of Pondicherry

Location

Pondicherry

Positions held

Technical Assistant

Main project features

Assisting the Junior and Assistant Engineer for the preparation of cost estimates and preliminary design details for various projects like Irrigation water supply, Sewerage and storm drainage projects and sector Roads and site supervision of the same projects.

Activities performed

Structural Design of Buildings up to 10 stories.

Preparation of Bills of quantities and Tender documents for different projects.

Site inspection and quality inspection of contractor’s works for various projects.

Check the bills submitted by the Contractor and forward it to the Client.

Check the structural drawings prepared form the Drafting department.

Execution of Residential and Commercial Multistoried structures, Roads & Irrigation Works.

PERSONAL DETAILS:

Nationality Indian

Passport Number N0715586 valid up to 20/3/2026 issued at Abudhabi, UAE

Marital status Married

Permanent Address No-256-3ed Main Road,

Mahaveer Nager, Lawspet, Pondicherry.

India – Pin – 605 008.

Phone (Landline) +91 413 – 2255474

Mobile No +91-733*******/979*******

Languages Known English, Hindi, Tamil, Malayalam

Certification:

I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience. I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.

[Signature of expert]

S.SEGARAN



Contact this candidate