PROFESSIONAL SUMMARY

Jose S. Andres III, RME

Piping Design

EDUCATION

Bachelor of Science in Mechanical Engineering, University of Santo Tomas – España, Manila

PROFESSIONAL LICENSES/CERTIFICATION

Registered Mechanical Engineer (RME), Professional Regulation Commission

SUMMARY OF EXPERIENCE

Having almost nineteen (19) years of professional experience in engineering, thirteen (13) years of which are in Piping Engineering and Design of oil & gas and petrochemical projects. My duties and responsibilities include but not limited to: Review project specifications, technical practices, design instructions, plot plan, and flow diagrams. Develop piping layout and detailed design using Plant Design System (PDS) and Smart Plant 3D (SP3D). Also skilled with the use of LFM and Smart Plant Review. Prepare isometric drawings, stress and material sketches. Perform squad checks with other disciplines, modeling of supplier/mechanical equipment drawings. Supervision of Areas comprising of Process and pressure vessels and Rotating equipment.

SPECIFIC EXPERIENCE

FLUOR DANIEL Inc. Phils.

PIPING DESIGN (SENIOR DESIGNER)

MULTI PROJECTS GROUP (MPG)

26 AUG 2019 to 11 JUN 2020

Responsible for the design and layout of both process and utility lines in various parts of the of the Plant. For this particular group (MPG), we do workshare with various Fluor offices around the globe. Home office sends 2D drawings and/or snapshots, that we, in the workshare office, translate into 3D models or if needed, piping isometrics. Close coordination is required between two offices to ensure the models and drawings released are accurate as per intended in the project.

PIPING DESIGN (SENIOR DESIGNER)

MARATHON STAR (S7AR)

05 AUG 2018 to 16 AUG 2019

Responsible for the design and layout of both process and utility lines in various parts of the RHU-ISBL area. Coordination and implementation on specific work packages are the main tasks in this area.

PIPING DESIGN (SENIOR DESIGNER)

JG SUMMIT (A7MI)

01 MAY 2017 to 27 JUL 2018

Responsible for the design and layout of lines in the Polymer rack. This new Polymer rack design is unprecedented, since it will be constructed around an existing piperack. Lines were laid-out

on either side and on top of the existing rack. Avoiding the existing lines as well as existing structures are the main challenges of this area.

SECTION LEAD (SENIOR DESIGNER)

The Lake Charles Chemicals Project Sasol Chemicals - Ziegler (LLC)

31 AUGUST 2015 to 28 APRIL 2017

Responsible for Leading Section 5500 (Alcohol Preparation Area and 5500 Diked Area).

The Area is composed of around 2200 isometrics and 100+ Equipment.

I handled around 14 Designers. I supervise layouts, participate in Model Reviews, raise DRI’s, check P&IDs, and do Squadchecks for Instruments, Equipment, Structures, and other documents.

I make the Design decisions for the whole of Section 5500.

PIPING DESIGNER (DESIGNER II)

Ethylene Cracker (LHC9)

AUGUST 2013 to 31 AUGUST 2015

Responsible for piping layout and detailing of several isometrics for rack Modules L2A05 to L2A14, and for stickbuilt L2A01 to L2A04.

Has worked and finished all 164 tie-in’s with Technip (Furnace side).

Has produced Piping Plans for the Furnace rack modules in the project.

PIPING DESIGNER (DESIGNER I)

SADARA Project (SGU)

JULY 2012 to AUGUST 2013

Responsible for piping layout and detailing of several isometrics for Unit 530 and all isometrics for Unit 730.

Has worked and finished several tie-in’s with ICF (Package A), Cerrey/Alstom (eqpt. vendor).

PIPING DESIGNER (DESIGNER I)

Super Absorber Polymer Project (SAPCo)

AUGUST 2011 to JULY 2012

Responsible for piping layout and detailing of isometrics for both process and utility lines in the Dry Area of the plant, which involves the following lines: chemical/additive, hot air, off-gas, cooling water, steam, and condensate lines amounting to around 250 isometrics.

Perform squad checks of equipments, and equipment modeling updates based on latest general arrangement drawings from vendor and mechanical team.

PIPING DESIGNER (DESIGNER I)

Long Harbour Nickel Processing Plant Project

MARCH 2011 to AUGUST 2011

Responsible for piping layout and detailing of isometrics for both process and utility lines in various areas of the plant.

HYUNDAI HEAVY INDUSTRIES, Co., Ltd.

(MAR 09, 2010 TO MAR 09, 2011)

Piping Engineer

Shell Qatar Pearl Gas to Liquid Project Ras Laffan Industrial City, Qatar

C4 - Feed Gas Preparation

Chiyoda-HHI Consortium

March 09, 2010 TO March 09, 2011

In-charge of the piping reinstatement team.

Line checking of piping prior to hydrotesting and after reinstatement versus the isometric drawing before handing over to the QA/QC. Monitoring and scheduling of piping for Hydrotest, Flushing, and Reinstatement.

JFE ENGINEERING Corp.

(MAY 14, 2009 TO FEB 21, 2010)

Mechanical-Piping Engineer

QUEZON AVENUE

SEWAGE TREATMENT PLANT PROJECT

May 14, 2009 TO Feb 21, 2010

Leading the mechanical team of the project which includes but not limited to, supervising the mechanical installations, pipe fabrication and installation. Also in-charge of preparing the basic design, bill of quantity, cost estimate, and implementation of modified/additional piping as required for the project.

FLUOR DANIEL Inc., Phils.

(NOV 2007 TO MAR 2009)

PIPING DESIGNER (DRAFTER III)

LDK Polysilicon Project

January 2008 to December 2008

Responsibilities include: Transposition, Lay-out and Modeling of Equipment and Process & Utility Piping in various areas of the plant namely, Piperack area, HCl, Off-gas recovery, and Reactor area.. Creating/updating equipment location plan drawings, equipment 3D modeling through PDS. Perform squad checks on equipments and structural steel with other disciplines. Provide sketches of special supports for the stress team and structural group. Microstation and Smart Plant Review

TRAININGS

Fluor Daniel Inc., Phils.

Writing Project Scopes of Work (PE159):

(JUN 29, 2017 – JUN 30, 2017)

Assessing and Managing Risk (PE155):

(NOV 10, 2016 – NOV 10, 2016)

Lead Engineer Training (ENG200):

(AUG 19, 2016 – AUG 19, 2016)

-Contractual Performance

-Phases of Engineering

-Quality

-Project Initiation

-Controlling Your Project

-Client Relations

Piping Supervisor’s Training:

(JUL 11, 2015 – AUG 08, 2015)

Smart Plant 3D:

(JUN 04, 2012 – JUN 18, 2012)

Smart Plant P&ID:

(JAN 27, 2009 – FEB 03, 2009)

Advance Stress Engineering / AutoPIPE:

(OCT 29, 2008 - DEC 10, 2008)

PDS Equipment Modeling /

PDS Piping Designer

(JAN 07, 2008 – JAN 31, 2008)

Phase l and Phase ll Designer Enhancement Training:

(NOV 27,2007 – JAN 02, 2008)

Basic Piping

Microstation Course

Smart Plant Review (SPR)

Microcadd Technologies

AutoCAD 2007

(MAR 04, 2007 – APRIL 29, 2007)

Microsoft OFFICE

SEMINARS ATTENDED

Technical Experts on Environmental Management, Inc.

Waste Water Treatment Plant Operation

(MAR 16, 2005)

Beauchem Thermtech Group, Inc.

Boiler Operation and Maintenance

(FEB 09, 2005)

ME Congress @ PRC Week 2000:

(JUNE 20-21, 2000)

Elevator Safety & Operation

A/C Operation, Maintenance & Safety

Boiler Operation, Maintenance & Safety

Parliamentary Procedures

Asia-Pacific Economic Cooperation

PROFESSIONAL ASSOCIATIONS

Philippine Society of Mechanical Engineers (PSME)

EMAIL/PERSONAL NUMBER

adjrm9@r.postjobfree.com

090*-*******



Contact this candidate