NITIN TRIPATHI
Email:adjpkz@r.postjobfree.com
Mob.:+919*********
CAREER OBJECTIVE:
Contribute to an organization in need of a mature professional and seeking a position with leadership responsibilities including problem solving, planning, organizing and managing with enthusiasm and energy needed to achieve superior results.
PROFESSIONAL SUMMARY
Over 12 years of experience in Telecommunication industry in the areas of business development, management, Installation, and Integration, commissioning. Testing, Operations & Maintenance of Siemens’, Motorola,Nokia BTS,Microwave equipment NEC, Ceragoan,Nokia,Siemens, Flexi Hybrid, Tejas, FHY, SDH Nortel (TN1C,TN1X), ECI mux and Utility DG, Battery Bank, power plant, Piu.
EMPLOYMENT HISTORY
Job Track Record
Working in Evolve Technologies & services Pvt. Ltd. Jabalpur since July- 2018 to sep-2020
Work Profile:
New SRAN,TDD,FDD,eNB Integration, system module installation and commissioning swapping, SW upgrades, RF modules swaps, RF sharing implementation and troubleshooting support for all new sites.
SCF ceation /.XML plan execution for Nokia planned sites and network modernization.
Troubleshooting and FE support for Integration and post activity issue raised by RF and customer.
CA, MIMO, RET, MHA & Adjacency creation.
Experience in NetAct tools such as NW Editor, CM Editor, CM Operations and NW License manager
Strong knowledge and experience in working and troubleshooting in the OMS tools such as Application Launcher and MML tool.
RET and other parameter’s script loading and Troubleshooting as per customer request.
Implement the new SW updates and implementation of new feature additions in new SW release as per the Customer requirement.
Job Track Record
Working in Nokia (Nokia Siemens Networks) as BSS ENGINEER for operation and maintenance at Aurangabad March 2009 to March 2014 and Nagpur from April 2014 to Sep-2016 .
Work Profile:
Operations & Maintenance of live Airtel Network.
Responsibility of handling 14 BSCs and more than 1014 sites of 2G and 72 sites of 4G (LTE) at Nagpur Cluster with support of a team of 11 Field Engineers & 2 technicians
Coordination and support to Project Team for LTE sites integration
Coordination and support to Project Team for 3G sites integration
SDH Traffic Shifting for 3G/LTE and 3G/LTE sites Equipment installation Quality
All Live Airtel 4G sites smoothly operation and maintenance.
Support to Project and Planning team for New sites Buildup .
Responsibility of handling 14 BSCs and more than 980 sites at Aurangabad Cluster with support of a team of 12 Field Engineers & 5 technicians
Coordination with Legal Team for legal issue (corporation,owner ect.)
Earthing test via Earth tester .
Coordinating with Field Engineers and providing technical supports for all types of problem and resolving them smoothly to reduce site outages and improve network availability.
Get rectified all BTS, BSC and Transmission alarms in the network.
Helping Project team to achieve all the rollout sites in time.
Supporting RF team to improve the RF KPIs by analyzing RF reports and by rectifying issues in the cells having high TCH drop, low HOSR, low TCH ASR, high SD blocking etc.
Coordinating with the customer for resolving various issues of the sites and escalating issues where necessary customer support is required.
Analyzing reports like Transmission alarm report, Rx level report, Alarm dashboard, NMS dashboard, NBH, BBH report and do the necessary rectification in the site.
Working with transmission team to rectify transmission alarms and realign the links with low Rx level.
Conducting preventive maintenance of all the BSC’s and BTS sites on regular basis.
Coordinating with other vendors like Indus, GTL, ESSAR for power and infra related issues.
Preparing different types of reports like, Spare Management, Preventive maintenance, NMS Visibility, Cluster Performance, Major Outages report, Lease line Data report and microwave data, monthly performance report for each engineer.
Attend Cluster Level Meeting’s, video calling, concall with costumer on weekly basis.
Completing TRX Grow & Degrow plans, reducing quality alarms, PM, Segmentation, Rehoming, Traffic shifting, Reshuffling, Cell Optimization and planning.
Implementing new features across the circle e.g. Antenna Hopping, DTX Downlink, LVLD,TRX Shut Down timer.
Spare manage at cluster level and sending faulty material to Ware House with proper follow up with R&R to receive it back.
Good Efficiency in the management of DDF for integration of ATER interface and A Interface.
Coordinating with other operators BSNL/TATA/IDEA/VODAFONE for interconnectivity of Various Networks.
Conducting Acceptance Tests for new sites in the network.
Maintenance & Up gradation of Site Database including PCM plans of the Network on a regular basis.
Quality Checking of Sites including RF parameter planned for the sites.
Having good communication with BSNL/MTNL & conducting BSNL/MTNL sites AT’s.
TNMS visibility of PDH & SDH of all installed Equipment in network smoothly
Handling Showcase & Non Showcase sites of live network efficiently.
Good coordination & communication with Transmission, RF, OMCR & NOC Team.
Good at BSS level BSC command line interface.
Handling BTS operations at remote locations smoothly & effectively.
Handling BSC operation & replace BSC card’s & update new sw .
Attending Costumer Complaint.
Daily/ weekly/ monthly targets and conversion cost of diesel per site.
Attained breakdown reduction up to 99.99% & maximum uptime availability of site.
Battery bank installation of various make HBL,Exide, Amar Raja & energy leader.
Battery drain test to check battery performance.
Specialization in Earthing.
Infra Alarms termination at multiplexer & confirming them from Operators.
EB lessoning
Liesoning with various vendors like- DG, AC, PIU, Power Plant, IPMDU.
Follow-ups with various DG vendors (Mahindra, Kirlosker, Cummins, BirlaPower, Eicher) for smooth operation of networks and reducing hired DG sets.
Follow-ups with various AC vendors (Amtrex, Blue Star, Voltas, Emerson).
Follow-ups with various PIU vendors (Pace, Acme, Powertek, Selvon,Gkar,AEG)
Follow-ups with various Battery vendors (Amara Raja, Mikrotek, HBL, Exide).
Licensing with Electrical Safety Dept. for new Transformer.
ARCOMMUNICATION
Project TEAM LEADER (Jan-09 –mar09)
Work profile :
Co-ordinate with team Engg. &provide technical support to them
Co-ordinate with TATA Engg about rollout of the month
Conducting Acceptance Tests for new sites in the network.
Coordination with Electrical and Telecom Vendors for Smooth Expansion of the project in the Cluster.
Quality Checking of Sites including RF parameter planned for the sites.
Handling system management, movement of workers, official documents, official Meetings etc
GTL LTD (MUMBAI)
O & M Engineer (Chindwara, MP) Bharti Airtel Limited(Aug 2007-Dec2008)
Work Profile:
Operations & Maintenance of live Airtel network.
E1 Management ( PCM Maintenance )
Active alarm & BTS Related alarms clearance individually
Good Efficiency to work on Base Station Controller BSC3i and its nodes in the network
Good Efficiency in the management of DDF for integration of ATER interface and A Interface.
Attending to Site Alarms and Proper Supervision at all sites to prevent unplanned outages.
Coordinating with other operators for interconnectivity of Various Networks.
Conducting Acceptance Tests for new sites in the network.
Arrange for Shortcomings arising at various sites to make sure the network functions smoothly.
Maintenance & Up gradation of Site Database including PCM plans of the Network on a regular basis.
Coordination with Electrical and Telecom Vendors for Smooth Expansion of the project in the Cluster.
Quality Checking of Sites including RF parameter planned for the sites.
Having good communication skills with BSNL/MTNL & handling BSNL/MTNL AT’s.
Working SDH equipment (TEJAS, NEC, and CERAGOAN).
REECOMPS
Project Engg (MP) for NSN (July2006--Aug 2007)
Work Profile:
BTS installation and commissioning of NOKIA (AIRTEL) site, RTL (RELIANCE) site, TATA site.
Power calibration of MOTOROLA h2 BTS
NOKIA ULTRA INDOOR, ULTRA OUTDOOR, METRO BTS Commissioning.
NOKIA FLEXI HOPPER Commissioning.
NOKIA BTS HARDWARE Configuration of 2-way, 4-way, 6-way configuration.
NOKIA ULTRA HUB Commissioning.
ALARM HANDLING.
BTS Integration as per company parameter.
Microwave Antenna High and low band family commissioning and alignment.
E1 Management (PCM Maintenance)
TRX ADDITION.
BTS cabinet expansion and enhancement.
POWER PLANT,BATTERY BANK INSTALLATION.
CABLE ROUTING.
Handling system management, movement of workers, official documents, official Meetings etc.
VSWR AND POWER MEASUREMENT
Special Trainings Attended:
Ceragoan
Tejas
Microwave (NEC).
Microwave (Nokia Flexi Hybrid)
Cosmos cop Feeder
Next Generation Network (3G)
PT4 Tool
Push Pool Tool
Site Plus Tool
GB over IP
LTE
IPv6
PTID
FARM TOCALI
FIRST AID
EQUIPEMENTS HANDLED
BTS: Nokia /Motorola /Siemens
Repeater: IDR/ODR.
Tejas SDH Equipment
FIU 19E
Microwave: NEC/ Nokia/ Ceragoan/Siemens.
Site Master/Power Meter/E1 Tester.
Flexi Hybrid
Ceragoan IP-10
Ceragoan IP-20
Redwin
LTE BTS (system Module, Rf module, Transport Module)
Transmission Equipment(RRI,E1T1,FIPA,FIFA,FIQA,FIQB)
BSC 3i (Low Cab, High Cab)
Flexi BSC 3i series
ACHIVMENTS:
SPOT AWARD AT YEAR 2012 FOR MW RING IMPLEMENTATION AND SUPPORT FOR PROJECT NEW ROLL OUT SITES.
SAFTY AND FIRST AID TRANING EXAMINATION PASS
NCC C GRAD CERTIFICATE PASS AT YEAR 2005
JUDO STATE LEVEL GOLD MADDEL
KABBADI STATE LEVEL GOLD CUP WINN
EDUCATIONAL QUALIFICATION:
QUALIFICATION
YEAR
BOARD/UNIVERSITY
PERSENTAGE/GRAD
H.S.C
1999
M.P.BOARD
79.60%
H.S.S.C
2001
M.P.BOARD
64.40%
DIPLOMA IN ELECTRICAL ENGG
2005
RGPV
67.03%
B.TECH
2015
K.S.O.U
70%
COMPUTER PROFICIENCY:
MS-DOS, Win98, 2000, xp, xp professional,windows 7,windows10
PERSONAL PROFILE:
Date of Birth : 16th August 1983
Fathers name : Mr. C.S.Tripathi
Nationality : Indian
Languages Known : Hindi, English, and Marathi
Sex : Male
Marital status : Married
Hobbies : Swimming and listening to music.
Address : 334/2, State Bank Colony, Single Story
Ukhri Road, Baldev Bag, Jabalpur (M.P.) 482002.
Ph No. : 076*-*******
Passport No. : J9358695
PLACE: Jabalpur
DATE: 16/01/2021 (NITIN TRIPATHI)