PERSONAL DATA:
Place : Malitbog, Southern Leyte Philippines
Age : 46
Civil status : Married
Religion : Roman Catholic
E-mail address : adjozn@r.postjobfree.com
JOB EXPERIENCE:
HYUNDAI (HDEC)/WISON
Refineria Puerto La Cruz (RPLC)
Deep Conversion Project
Offsite Facilities: (VONE / VERE SITE) Refineria Puerto La Cruz
Anzoategui Venezuela South America
Contract: April 17, 2017 to April 17, 2018
POSITION: PIPING SUPERVISOR
SITE ASSIGNED:
Vacuum Distilled Unit (VDU)
JOB DESCRIPTION:
Direct supervision to pipe fitters and fabricator for daily piping
assembly and installation of piping to sleeper and pipe rack.
Associate and assist to construction engineering for all piping re-routing, modification and installation of special piping components.
Assist to sub-contractor for the daily piping erection and quality inspection in order to meet the standard procedure.
Supervision and participates for the installation, modification and repair of piping system.
Responsible for the reporting, monitoring plans and specification and input to centralized monitoring system for daily production.
SK ENGINEERING & CONSTRUCTION CO.LTD.
JGCS Consortium Ngi Son Refinery & Petrochemical Complex Project
Offsite Facilities: Ngi son economic zone,Tinh Gia Dist.Thanh hoa Prov.Vietnam
Contract:December 30,2015 to December 29,2016
POSITION: PIPING SUPERVISOR
SITE ASSIGNED:
JGCS Zone 2 Area A
JOB DESCRIPTION:
Reviews the documentation relevant to the system and to ensures the line and systems are constructed in accordance with the drawings and specifications.
Coordinate to IPMT clients and assist to sub-contractor for the test package preparation and for test package review.
Responsible for the pre-line checking of system to ensure completeness, punch list clearing and readiness for hydrostatic test activities.
Monitors the hydro testing (hydrostatic and pneumatic) and handle reports on the completion of test and supervise line cleaning after hydrostatic test.
Interfaces with the clients QA/QC representative for the test.
Supervision for the conduction of hydrostatic, pneumatic test on site.
SK ENGINEERING & CONSTRUCTION CO.LTD.
WASIT GAS PROGRAM (SAUDI ARAMCO)
NGL Fractionation Project (WFC)
Offsite Facilities: Khursaniyah Saudi Arabia (K.S.A)
Contract: December 07,2013 –August 07-2015
POSITION: PIPING SUPERVISOR
SITE ASSIGNED:
PKG. #4 HYDROTEST DIVISION
PKG. #1 INLET PIPING DIVISION
JOB DESCRIPTION:
Supervision of test package Preparation, test package review and monitoring as well.
Coordinates with sub-contractor to apply standard Hydrostatic work
Procedures.
Coordinate and interface effectively with other craft superintendents & subcontractors, as well as client, PMT,PID, staff personnel and leadership to ensure smooth work flow and schedule adherence.
Modify & revise Isometric drawings, P&IDs, weld mapping for piping isometrics utilizing AutoCAD
Liaison between field engineering and craft to ensure compliance of construction drawings and specifications.
Provide supervisory direction of craft workers via general foreman and foreman, managing the performance of productivity, safety, quality, and schedule adherence.
HYUNDAI ENGINEERING & CONSTRUCTION CO.LTD.
MA’ADEN ALUMINA REFINERY PROJECT
SAUDI ARABIAN MINING COMPANY
Offsite Facilities: Raz Al-Khair (K.S.A)
Contract: August 3, 2012 – August 13,2013
POSITION: PIPING SUPERVISOR
SITE ASSIGNED:
HYUNDAI MAIN PIPING FABRICATION SHOP
SITE PIPE RACK AND PIPE SLEPPER
JOB DESCRIPTION:
Involved in process development activities for functional groups or projects.
Supervision,controlling for specific tasks and day to day piping,welding activities,piping availability consumable materials, and manpower as well .
Coordinates with sub-contractors to evaluate and apply standard work processes, procedure, and criteria in making minor adaptations and modification to techniques and procedure to be applied.
Excellent knowledge of maintenance systems and follow client specification.
Collect and input data to I.P.C.S(Integrated Piping System) a centralized system for monitoring in order to meet daily production report.
Excellent communication skills, both written and oral and computer as well.
HYUNDAI ENGINEERING & CONSTRUCTION CO.LTD
SAUDI ARABIAN OIL COMPANY (KONE Project SAIDI ARAMCO)
KARAN GAS FIELD DEVELOPMENT PROJECT
KARAN GAS FACILITIES (K.G.F.)
Offsite facilities: khursaniyah Saudi Arabia (K.S.A.)
CONTRACT: May 21, 2010 - May 21, 2012
POSITION: PIPING SUPERVISOR
SITE ASSIGNED:
KHURSANIYAH IN-PLANT (Existing and New Pipe Rack Karan)
KHURSANIYAH SAUDI ARAMCO IN-PLANT EXTENSION
INLET FACILITIES
JOB DESCRIPTION:
Responsible for the supervision of all tie-in & piping Installation for Interconnection during shutdown works and associated mechanical activities & assistance to Saudi Aramco Operations.
Coordination to Saudi Aramco operations for the arrangement of P.T.W.( Permit to work) for Piping works and other related In-plant and existing activities.
Involving use of special safety equipment such as (SABA) Supply Air Breathing apparatus during existing interconnection and critical hazardous tie-in ((H2S).
Supervision and conduction of special bolting, specially using bolt Tensioner, Hydraulic torque equipment for the Installation of heavy special piping components and valves.
Supervision for all critical Cold and Hot tapping
Manual Drafting of As-Built Drawing as per site actual revision
Initiate, conduct Hydrostatic and Pneumatic pressure Testing for plant equipment and pipelines
Conduct Line checking, punch clearing, modification & re-instatement.
HYUNDAI ENGINEERING & CONSTRUCTION CO.LTD
FOSTERWHEELER / HYUNDAI KHURAIS
PROCESSING FACILITIES GAS (SAUDI ARAMCO)
PROJECT: KHURAIS GAS CONTRACT (KGC)
CONTRACT: April 30, 2008 – April 30, 2010
POSITION: PIPING FOREMAN
SITE ASSIGNED:
AREA 4
CRUDE TANK AREA,OIL STORAGE
AREA 6
PROPANE AREA,STORAGE,TRANSFER SHPPING.
GAS TRAIN 1
GAS TREATMENT PLAN
FABRICATION
PIPING SHOP
JOB DESCRIPTION:
Preparation and monitoring for daily production report
Responsible for supervision of spool release, control and spool expedite
Initiate and conducting for bolt Tensioning and Bolt torqueing
Supervise and conduct Punch Clearing and Reinstatement
Supervise for Line checking and walk down preparation
Supervise for Hydrostatic and Pneumatic pressure Testing
DAEWOO E&C TECHNIMONT
QATAR CHEMICAL II EXPANSION
ETHYLENE DERIVATIVES
MESAIEED QUATAR
CONTRACT: September 23, 2007 – January 23, 2008
POSITION: Pipe fitter/Piping Lead man
SITE ASSIGNED:
Q-CHEM II PIPE RACK 142, 143, 301 to 305.
POLY ETHYLENE (P.E.) RACK AREA
JOB DESCRIPTION:
Supervision for modification,rectification for new revision drawing
Supervise for erection and fit-up of pipes to pipe racks
Supervision for Line checking, pre-walk down preparation
Supervision for pipe laying, spool erection and assemble on pipe racks & pipe sleeper
F.A.F.CO
FOUAD ABDULLA FOUAD CORPORATION LTD.
P.O. Box 895 Dammam 31421, Kingdom of Saudi Arabia (KSA)
CONTRACT: August 12, 2005 to August 12, 2007
POSITION: Pipe fitter/Steel fabricator /Piping Lead man
SITE ASSIGNED:
SHEDGUM PLANT SAUDI ARAMCO – SULFUR RECOVERY
JOB DESCRIPTION:
Supervision for fabricating structural and pipe supports
Supervision of Fit-up pipes and installation of all valves on plot piping
Supervision for pipe laying, spool erection and associated mechanical activities
Initiate cold and hot tapping activities
Supervision for Hydrostatic and Pneumatic pressure testing
SHAYBAH GAS COMPRESSION UPGRADE (GOSP-2) –SAUDI ARAMCO
HAWIYAH NGL GAS COMPRESSION FACILITIES – SAUDI ARAMCO
AL-KHAFJI JOINT OPERATIONS (KUWAIT GULF OIL COMPANY (ARAMCO GULF OPERATIONS – SOUTH JETTY EXPANSION)
JOB DESCRIPTION:
Supervision for the preparation of tie-in activity requirements
Initiate hydrostatic, pneumatic pressure testing and e-instatement
Supervision for fabrication, of piping components and structural supports
Supervision for structural and piping erection to pipe rack and sleeper
S.O.G MANUFACTURING CORPORATION
Don Juan Street, Villa Cecilla, Subd. Mambugan, Antipolo City
CONTRACT: October 7, 1995 – January 31, 2005
JOB DESCRIPTION:
FACTORY WORKER / WELDER / STEEL FABRICATOR
Fabricates of shoe metal molding and assemble injection machine
SUPERVISION FOR MACHINE OPERATION :
P.V.C – Rotary injection machine
E.V.A – Injection machine
P.E. – Pelletizer injection machine
H.D.P.E – Shoe blocks injection machine
A.N.J STEEL FABRICATOR
38 Road 8, GSIS Hills Subdivision, Talipapa Caloocan City
CONTRACT: February 1993 – March 1995
JOB DESCRIPTION:
Responsible for controlling day by day fabrication activities.
Supervision and control to all welders and fabricators activities.
Supervision for assembly of industrial structures and special steel works.
2018- TESDA SHORT COURSE TRAINING
NATIONAL CERIFICATE II in PIPE FITTING
Cert.No. 180***********
ULI: AJC-74-256-*****-***
Issued on: June 3,2018
Valid until: June 2,2023
2012- TRAINING COURSE
8 Steps of Effective Incident Investigation
Cert.No. 17329
Issued on: November 12, 2012
EDUCATIONAL ATTAINMENT:
1986– 1992 – HIGH SCHOOL
Santo Niño Academy
Malitbog, Southern Leyte, Philippines
1986 – 1980 – Elementary
Malitbog Elementary Central School
Malitbog, Southern Leyte, Philippines
CHARACTER REFERNCE:
Mr. Sebastian Hong
Construction Manager (Package #4)
SK Construction & Engineering
Wasit Project khursaniyah, Jubail K.S.A
Mr. B.I. Kim
Piping Manager ( SONE & KONE)
Hyundai Engineering & Construction Co.Ltd.
Kingdom of Saudi Arabia (K.S.A.)
Mr. J.H. Cho
Fabrication Manager (SONE) / Construction Manager (KONE)
Hyundai Engineering & Construction Co.Ltd.
Kingdom of Saudi Arabia (K.S.A.)
Mr. Angel Jaurique
Fabrication Manager / Company Owner
A.N.J. Steel Fabricator
38 Road 8, GSIS Hills Subdivision, Talipapa, Caloocan City, Philippines
Mr. Manuel Samson
Company Owner
S.O.G Manufacturing Corporation
Don Juan Street, Villa Cecilla Subd., Mambugan, Antipolo City, Philippines
JULIUS C. ACEBEDO
Oaks Residence # 8 Joyce Lane st. Blk.10,Lot 20, Sitio Munting Dilao, Brgy.San Isidro, Cainta,Rizal, Philippines
Mobile No. : 092********
Tel.no. : 8463-0339
Umid No. : 33-2184131-4
PhilHealth No. : 190*********
Passport No. : P0672431B