Career Objective:
Work to the best of my potential and seek a senior level consulting position in a reputed firm, with continuous development in personal as well as organizational goals.
Career Trajectory:
Organization
Duration
Designation
Nass Contracting company
Since July 2019 to Nov-2020
Senior Engineer
AlMoayyed AlMukhaimer Construction Co. W.L.L
Since 23-Sep 2018 to23 rd July2019
construction manager
Panorama contracting Engineering service.W.L.L
Since 22 July 2017 to 3th Sep 2018
construction manager
Bahrain Pipe Line Construction Company W.L.L., Kingdom of Bahrain
22th June2011 to 3th July2017
Construction Manager
Habib Ali Awachi & Sons Contracting Company Kingdom of Bahrain
3th Aug 2005 to May 2011
Senior engineer
Vignesh propertees
04 Feb-2001 to 9-th July2005
Senior project engineer
Projects Handled @ Nass Contracting Company
From July 2019 to still to date ; Nass Contracting Company
.
Designation ; Senior engineer ( underground service )
Project ; BAPCO Modernization program
Project description : We construct underground more than 3000 linear meter GRE gravity pipeline for OWS AND CSS,more than 2000m Cooling water pressure line { carbon steel pipe}, and fire water line more than 3000m, size vary from 28”, 54”, 42” and 76” . We also constructed man holes for OWS and CSS Pipeline more than 50 numbers
Roles & Responsibilities:
●Coordinated with various stake holders (such as Consultant, Client, Bapco & other ministry representatives) of the project in various aspects (such as working near Bapco lines, permission for road crossing, H.V. cable crossing etc.)
●Carrying out activities near the Bapco Oil & Gas pipelines complying to their rules & regulation.
●Framing of sequential execution of activities in coordination with the subcontractor.
●Monitoring the Planned vs Actual execution of activities.
●HSE monitoring, Control & strict compliance at site.
●Monitoring the HSE workshops periodically.
●Providing mitigation & catch up plans for the loss of productivity.
●Coordinating & Monitoring with the site engineers for the progress of work
From Sep 2018 To July 2019 ; AlMoayyed AlMukhaimer Construction Co.
Designation ; Construction Manager
Project ; Construction of Boat parking Bay at Alba
Calciner .
From 22 July 2017to 3 sep-2018 ; Panorama contracting and engineering service.
; P.O Box-26312, Manama, Kingdom of Bahrain
Designation ; construction manager
Project ; Construction of 800 X1200 MM Diameter Potable
Water Transmission Pipeline at Diyar Al Muharraq
Housing Development co.
; 341738-PSD-01
Project Description ; DN 800 & 600 Water Transmission
Pipeline for a stretch of 3.5 Kms. Consisting of
6 Nos. of Washout, Air valve, Isolation,
6 Nos Thrust Blocks.
Contract Sum ; BD 1.56 million
Client ; Diyar Al Muharraq Housing Development co
Consultant Mott McDonald LTD. Kingdom of Bahrain.
Roles & Responsibilities:
●Coordinated with various stake holders (such as Consultant, Client, Bapco & other ministry representatives) of the project in various aspects (such as working near Bapco lines, permission for road crossing, H.V. cable crossing etc.)
●Carrying out activities near the Bapco Oil & Gas pipelines complying to their rules & regulation.
●Framing of sequential execution of activities in coordination with the subcontractor.
●Monitoring the Planned vs Actual execution of activities.
●HSE monitoring, Control & strict compliance at site.
●Monitoring the HSE workshops periodically.
●Providing mitigation & catch up plans for the loss of productivity.
●Coordinating & Monitoring with the site engineers for the progress of work
●Periodic follow up of Free Issue material allocation & Procurement of tendered items.
●Monitoring the productivity of Manpower & Machinery.
●Maximum utilization of Lump sum contract through various site aspects and conditions.
●Preparation and submission of Interim Valuations
●Coordinating with various internal stake holders regarding various activities.
●Preparation of Reconciliation statement for the Free Issue Material.
●Monitoring & Controlling of Sub contractors activities.
Projects Handled @ Bahrain pipe line Construction Co. W.L.L.
Since June 2011 to AUG 2017 ;Bahrain pipe line Construction Company Co. ; P.O Box-26312, Manama, Kingdom of Bahrain
Designation Construction Manager
Project Construction of 1400X1200 MM Diameter Potable
Water Transmission Pipeline from Al-Dur
Forwarding Station to West Riffa Distribution
Station (Package-1 & Package-2)
4607/4608/2010/3100
Pipelines West Installation Works (PIW)
Project Description DN 1400, 1200 & 800 Water Transmission
Pipeline for a stretch of 30.2 Kms. Consisting of
62 Nos. of Washout, Air valve, Isolation,
Combined & Off- Line Chambers, 42 Nos
Thrust Blocks, 13 Nos-
NDRC Crossing, 66 Nos. HV Cable Crossings &
13 Open Cuts @ VIP Roads.
Contract Sum BD 9.56 million
Client Ministry of Electricity and Water Authority.
Kingdom of Bahrain
Consultant Mott McDonald LTD. Kingdom of Bahrain.
Project Working as Project In charge for the Water
Transmission pipeline From Hamad Town DS to
Al-Areen DS (4602-800mm DIA).Bahrain
Project Description Hamed Town DS To Al-Areen DS Water
Transmission pipeline (4602-800mm DN Pipe)
Kingdom of Bahrain
Pipeline Length (DIA 800mm) -7KM.
15NOS Chambers, 5nos road crossings
(Washout and air valve chambers)
Contract Sum BD 1.06 million.
Consultant: Hyder Consulting Middle East Ltd.,
Kingdom of Bahrain
Roles & Responsibilities:
●Coordinated with various stake holders (such as Consultant, Client, Bapco & other ministry representatives) of the project in various aspects (such as working near Bapco lines, permission for road crossing, H.V. cable crossing etc.)
●Carrying out activities near the Bapco Oil & Gas pipelines complying to their rules & regulation.
●Framing of sequential execution of activities in coordination with the subcontractor.
●Monitoring the Planned vs Actual execution of activities.
●HSE monitoring, Control & strict compliance at site.
●Monitoring the HSE workshops periodically.
●Providing mitigation & catch up plans for the loss of productivity.
●Coordinating & Monitoring with the site engineers for the progress of work
●Periodic follow up of Free Issue material allocation & Procurement of tendered items.
●Monitoring the productivity of Manpower & Machinery.
●Maximum utilization of Lump sum contract through various site aspects and conditions.
●Preparation and submission of Interim Valuations
●Coordinating with various internal stake holders regarding various activities.
●Preparation of Reconciliation statement for the Free Issue Material.
●Monitoring & Controlling of Sub contractors activities.
Projects Handled @ Habib Ali Awachi & Sons Contracting Company W.L.L.
From AUG 2005 to May 2011 Habib Ali Awachi & Sons Contracting Company
P.O Box-2041, Manama, Kingdom of Bahrain
Designation Senior Engineer
Project HIDD Water Transmission pipeline
(Package-P1 & P3).Kingdom of Bahrain
Project Description Mina Salman to Salmabad Water Transmission
Pipeline (package-3), Kingdom of Bahrain
Pipeline Length (dia 1200mm) - 10KM.
22Nos Washout and air valve chambers, two
Branch chambers (1200 x 1000) & (1200 x 800),
2 Nos. Isolation valve chambers & 2 Nos NDRC
Contract Sum BD 4.5 million
Client Ministry of Electricity and Water.
Kingdom of Bahrain
Consultant Black & Veatch International Ltd.,
Kingdom of Bahrain
Roles & Responsibilities:
●Monitoring & Controlling the execution of the project
●Preparation of Bar bending Schedules, Quantity take off for various activities in order to follow up with the prepare procurement schedule & follow up suppliers.
●Preparation & Submission of Interim Valuation.
●Coordination with various internal stakeholders of the project for the sequential execution of activities.
●Coordinated with various stake holders (such as Consultant, Client, Bapco & other ministry representatives) of the project in various aspects (such as permission for road crossing, H.V. cable crossing etc.)
Projects Handled @ Vignesh propertees, Tamilnadu, India.
From FEB-2001 to July 2005 March -URC Pvt. Ltd.,
- Erode, Tamilnadu, India.
Designation Senior Project Engineer
Project Industrial Building (Spinning Mill) at
Rajapalayam, Tamilnadu, India.
Project Description Construction of Industrial Structure,
Fabrication & Erection of steel structures.
Client Jaya villas group of companies,
Madurai, Tamilnadu, India
Consultant Ideal Structures, Madurai, Tamilnadu, India
Roles & Responsibilities:
●Execution of Heavy machine foundation, fabrication & erection of Steel Structures.
●Preparing of Quantity Take off Sheets for various activities.
●Preparation of record sheets & supporting documents for the submission of Interim Valuations
●Preparation of Daily, Weekly & Monthly program and progress report
●Co-ordinate with different stake holders of the project such as Client and Consultant.
●Monitoring & Controlling of manpower, cement plant & machinery productivity.
●Monitoring & Controlling HSE obligations.
Projects Handled @ Kings Way Consultant Chennai, Tamilnadu, India
From 2001 to 2006 March Kings Way Consultant
Chennai, Tamilnadu, India
Designation Senior Engineer for the Project of Vellore Institute of Technology Men’s Hostel & Ladies Hostel
Project Description Construction of VIT Men’s Hostel (Ground + 8 floors)
Plinth area - 4lacks Sqft,
Estimated cost - Rupees 23 corers
Completed period - 12 Months
Construction of VIT women’s Hostel (Ground + 8 floors)
Plinth area - 2 Lacks sqft,
Estimated cost - Rupees 10 Corers
Completed period - 06 Months
Constructed on international standard swimming pool size 50m x 25m
Client Vellore Institute of Technology
Contractor L&T Ltd., Chennai.
Roles & Responsibilities:
●Quantification & preparation of bar bending schedule & RCC for heavy foundations.
●Evaluating, organizing, prioritizing & sequential execution of activities between contractors.
●Identifying, Interpreting & addressing client’s requirements and ensuring all technical justifications for contractual variations.
●Vendor Management and Sequential execution of activities.
●Coordinating with all the stake holder of the project.
Projects Handled @ The Building Center, State Board of Tamilnadu, Vellore, Tamilnadu
From 1998 to 2001 The Building Center
State Board of Tamilnadu
Vellore, Tamilnadu
Designation Assistant Project Engineer
Project Description Construction of Samthuvapuram
(a) Twin houses 50 No’s – 300( sq.ft each)
Plinth area - 150000 Sqft,
Estimated cost - Rupees 25 Lacks
(b) Community Hall
Plinth area - 2000 Sq.ft,
Estimated cost - Rupees 10 Lacks
(c) Construction of water tank & pump room
Capacity - 20000 Liters,
Estimated cost - Rupees 10 Lacks
(d) Internal roads, drainage and culverts
Length of Roads - 5 Km
Estimated cost - Rupees 20 Lacks
Total completion period - 12 Months
Construction of Veterinary Hospitals (10 No’s)
Plinth area - 2 Lacks sqft,
Estimated cost - 10 lacks
Completed period - 06 Months
Co-operative milk society (7 Nos)
Plinth area - 2000 sqft,
Estimated cost - 25 lacks
Completed period - 12 Months
Co-operative milk society (7 Nos)
Plinth area - 2 Lacks sqft,
Estimated cost - 10 Cores
Completed period - 06 Months
Client: State Board of Tamilnadu, India.
Contractor: Local PWD Contractors. Vellore
Roles & responsibilities:
●Monitoring & approving Quantification of various items & preparation of procurement schedule and periodic follow up of the material suppliers.
●Monitoring & controlling of the project as per quality standards.
●Monitoring Planned vs Actual schedule.
●Preparing monthly program and progress report to the senior management.
●Interacting with various stake holders of the project
Projects Handled @ Mano Builders Vellore, Tamilnadu
From 1993 to 1998 Mano Builders
Vellore, Tamilnadu
Designation Site Engineer
Project Description Construction of Residential Buildings and Commercial Buildings,
Roles & Responsibilities:
●Execution & monitoring of activities at site
●Quantification of various items for the site activities.
●Preparation of measurement sheet for Interim Valuations
●Preparation of Daily, Weekly & Monthly progress reports
●Monitoring of productivity at site.
●Shifting of Manpower & machinery as per productivity requirements at site.
Academic Qualification:
●B.E. Civil Engineering @ Thanthai Periyar Government Institute of Technology Madras University Year-1993
Skill Set:
●MS Office ( Word, Excel, Power point & Out Look)
●Auto CAD Version 2014
Personal Detail:
Local Address
23/48 7 East main road,Gandhi nagar
Vellore. Tamil nadu,India.
Status
Married
Nationality
Indian
Languages Known
English, Tamil and Hindi
Extracurricular activities
Cricket & Foot ball
Hobbies
Cooking and Reading Books
Declaration:
I hereby furnish that the above mentioned particulars are true to the best of my knowledge.
Place:
Date:
(M.D.SIVA KUMAR)
M.D. SIVA KUMAR
CRPEP License No: EPP/C2389/CE/03-B
BAPCO Permit Card Holder No.: M01164
Contact No.: +91-948*******.
Email: adjn6u@r.postjobfree.com.
Passport No: N5191782 (Valid Up to 08-05-2026)
Valid Driving Licence .