Post Job Free

Resume

Sign in

Mechanical Engineer Piping

Location:
Coimbatore, Tamil Nadu, India
Salary:
45000
Posted:
January 23, 2021

Contact this candidate

Resume:

CVENKATRAMAN

B**,”A” Block, Rehabilitation center, 2nd Street, Block- 1, Neyveli-607 801. Tamilnadu, India

E-mai adjm9i@r.postjobfree.com Ph: +918*********

APPLICATION FOR THE POST OF SUPERVISION – PIPING

CAREER OBJECTIVE:

Professional Knowledge in Utilizing highly quality job method with modern technique so as to attain maximum productivity in the project with accuracy and minimum duration

CAREER SUMMARY:

21 years of experience in the field of Petroleum Refinery, Petrochemical, Power plant, Fertilizer and Oil & Gas projects with clients like, CTJV, RAS GAS - QATAR., Saudi kayan –KSA and Saipem – UAE.,KOC -KUWAIT

Expansion of Pilot CNG Refueling Station (ECRS) at Small & Medium Industries Zone

Position : Piping Supervisor January 2017 to May 2018

Project : Expan. of Pilot CNG Refueling Station (ECRS) Industries Zone

Client : Dopet, Qatar petroleum

1. Managing contractors in the delivery of their respective scopes of work to meet quality, schedule and cost

2. Reviewing, commenting and approving contractor's construction deliverables to ensure that such deliverables appropriately govern the execution of the work within the contract.

3. Monitoring contractor progress in the execution of their work to ensure the contract scope is being executed in a timely manner to achieve the contract milestones

4. Managing the contractors to minimize risk of Health, Safety & Environmental incident or issue with the goal being to manage with a "Zero Accidents" philosophy

5. Construction issue resolution

6. Interface coordination between different contractors on the project, including contractors appointed by 3 rd party.

7. Inspection of completed portions of the work to verify construction completion prior to transfer of responsibilities to the Handover & Inspection requirements

Key Responsibilities:Language Skills:English with clear demonstrable fluency in construction language and terminology

2. WARA Pressure Maintenance Project, EWDP-2, EWDP-1 project

Position : Piping Supervisor Commissioning from

December 2014 to December 2016

Project : WARA Pressure Maintenance Project, EWDP-2, EWDP-1

M/s GSE &C, Kuwait

Client : Kuwait Oil Company (K.O.C)

Preparation of Work Schedule & get implemented. Timely actions on critical activities.

Attend Co-ordination meeting with Contractor, for smooth & uninterrupted work progress

Commissioning of Final box-up, and start up & hydro test, cleaning, pigging, dewatering, swabbing.

Exercise control over manpower and material resources in order to execute the project within, schedule, and quality and HSE requirements.

Reporting progress on projects to the Company project engineer in a timely manner, highlighting issues which could impact on quality, cost, and schedule or HSE matters

Well head operation.

Under general supervision, promotes excellent customer relations at the worksite.

Plans and performs necessary calculations for pipeline, nitrogen, and/or chemical pumping services the worksite as needed.

Responsible for the management of the chemical and material inventory at the worksite.

3.Al.Hossan gas Abudhabi project

Position : Piping Supervisor from April 2012 to May 2014

Project : Shah Gas Development Sulphur Recovery Units – Package II & III

M/s DodsalEngg. & const.Pte Ltd, UAE

Client : Saipam SPA

Professional Experience:

Managing Construction activities including Fabrication, Erection, Testing and Commissioning meeting Quality and Safety requirement.

Motivating all the construction crew to adhere the Safety and meet the Quality requirement laid down by both Client and organization.

Coordinate with planning to meet the project delivery requirement. Initiating appropriate action plans to meet the shortfall in planning activities

Managing and monitoring the material to feed the construction crew constantly. Managing Multinational personnel’s involved in the construction.

Coordinating with Client’s Construction and Engineers crew in resolving Technical queries. Managing and monitoring completion activities and smooth System Handover.

Manage Construction with respect to infrastructure, process and system. Compliance to Project Quality requirements.

Successfully motivating subordinates in term of improvements and new ways of working. Developing leadership skills in others.

Well familiar with all types of piping system i.e. utility, process, Pressure /Power Piping and Pipes Lines, for Petroleum Refinery, Petrochemical, Fertilizers, Power LNG TRAIN And Oil & Gas Projects.

4.DAELIM Saudi Arabia Co Ltd, Jubail, KSA

Position : Piping Supervisor from July 2009 to June 2010

Project : Saudi Kayan Petrochemical Complex Project

Client : Saudi kayan (an affiliate of SABIC)

EPC : DAELIM Saudi Arabia Co Ltd for Polycarbonate Project

Responsibilities as a Piping Supervisor

Responsible to plan and execute all the piping construction activity as per required norms and standards, ensuring all the quality procedures and safety procedures.

Worked with all types of piping including on plot & off plot (A/G) piping under ASME B31.3, ASME B31.4.

Experienced in working with all pipes like Carbon Steel, Stainless Steel, Alloy Steel, and Nickel Steel in process train.

Proficient in executing the piping activity under various WPS and method statements.

Supervised and worked with all types of pipe joints like welded joint, flange joint, threaded joint, Coordinating with the fabrication workshop and material store for pipe spool fabrication and material transfer. Preparation of total fabricated spool, available spool at site, missing spool list and outstanding material lists.

Coordinating with the sub-contractors for manpower and equipment resources.

Supervising and managing the sub-contractors piping erection activities as per approved drawings, quality procedures, safety requirements, planned schedule and resources.

Coordinating with the QC department for Radiography testing and other NDT requirements.

Coordinating and Supervising the Hydro testing of completed lines and spools as per hydro testing procedures approved by the client.

Responsible to prepare punch list, test pack clearing and other required formats in the construction of the project.

Responsible to prepare the completion report and as built markup drawings.

5.August 2007 to February 2009

Organization : - Rasgas on Shore Expansion Project, CTJV

M/s DodsalEngg. & const.Pte Ltd, Doha

Plant :- RGX-II Train 6&7 and AKG-2

Position : -working as a Piping Foreman

High lights of Performance : -Pipe racks, Equipment’s and Piping

Erection and Fabrication of piping 3/4th inch to 72 inches All Varity of piping like CS, LTCS,SS304L,SS316, and Inconel. Control and monitoring of man power, regulation of safety Maintain of equipment history liaising with plant Management to discuss weekly production plan-Interacting and liaising between clients to achieve full Client’s satisfaction-ensuring a strong and regular Communication is established between the plants Employees-organization monthly team meeting with Colleagues to discuss concerns and difficulties in Production activities ours required Skills: the successful Candidate will be committed to and promote company Standards and policies. Your ability to work in a fast Paced environment and to multi-task will ensure your Success in this team based environment. The ideal Candidate will possess supervisory

6.July2004 to July2007

Organization :- STCMS,CMS INDIA PVT LTD and MANTAKRAF INDIA PVT LTD

Plant :- 1x250MW Firefighting piping and

Mining equipment’s, Spreader 11,000 TPH, 20,000TPH&MTC

Position : - piping supervision.,Erection of machinery.,and Quantity surveyor

High lights of performance : -Boiler, & bunker, Equipment’s and piping erection&

Fabrication of piping like CS, LTCS, Control and monitoring of man Power, Regulation of safety Maintain of equipment history liaising with plant Management to discuss weekly production plan Procurement of all tools &tackles

7.December1999 to May 2004

Organization :- Tata projects (p) ltd.,

Plant :- 2X210 MW Thermal Power station

Position :-Quantity surveyor

High lights of performance : -Boiler, and bunker, Equipment’s and piping

Erection& Fabrication coordinating with the client for certification of Our Invoice. Clearance for monthly running Bill Control and monitoring of man power, Regulation of safety Preparing protocol for all areas and Submitting to the client Preparation of As-Built drawing

For all areas and submitting to the Clint

8.December1995 toNovember1999

Organization :- Kurup Engineering Company (p)

Plant : -2X210MW Thermal station-II, Neyveli & Karur

Position :-Supervisor structural

9.October 1991 to December 1994

Organization : - TMS EngineeringCorporation

Plant 12x60 MW Thermal power station-I, Neyveli

Position : - Supervisor Maintenance

10.August 1990 toSeptember1991

Organization :-Babu engineering corporation.,

Plant :-12X60 MW Thermal power station-I,Neyveli

Position :-Supervisor Maintenance

Academic Achievements

Academic :-Higher secondary

Technical :-Diploma Mechanical Engineer II nd class

Languages Known :-Tamil, English and Hindi

Computer Knowledge :- M.S OFFICE (Excel, Word &Autocad2000)

Date of birth :-27-09-1969

Details of Pass port Number :- L 4982653 at Abudubai

Issue &Expiry :-01-12-2013 to 30-11- 2023

I hereby declare that the above particulars given by me are to the best of my

Knowledge and belief.

Place: SIGNATURE

Date: C.Venkatraman



Contact this candidate