Post Job Free

Resume

Sign in

Engineer Mechanical

Location:
Aligarh, Uttar Pradesh, India
Salary:
50000.0 $ per annum
Posted:
January 21, 2021

Contact this candidate

Resume:

CONSTRUCTION MANAGEMENT & ENGINEERING P a g e * of 6

Classification: Internal Use

SHEHROZ AKHTAR

Tel – Mobile: +91-906*******

E-mail: adjlc5@r.postjobfree.com

Project Construction & Engineering Assignments

Over 20 years of cross-cultural experience in the areas of:

- Construction Management - Strategic Planning - Site Management

- Shutdown Work Management - Commissioning - Design Reviews

- Resource Management - Relationship Management - General Administration A Mechanical Construction Engineer; adept in handling multi-discipline contracts involving Mechanical, process Piping, structure, Electrical Substation and Instrument related Jobs. Design review of 90% DEP Package & Final IFC package along with Bill of Materials (BOM). Following all necessary SAFETY, HEALTH & ENVIRONMENT (SHEMS) Standards & OSHA Int. Std to ensuring application of the same in all aspects of the work being carried out. Scheduling and Monitoring of Construction activity, Progress Report, Preparation of Checklist, Client measurement, and Reconciliation Statement and Supervision of all industrial/plant construction activities. Construction management of critical Turnarounds and shutdown jobs with adequate resource planning of materials & manpower.

Site Procurement of mechanical & process piping materials and other construction consumables. Conversant with all P&ID drawings, Isometrics, Pipe Plan, GADs standard codes, symbols and specifications and international standards like ISA, ASME, and API etc. Conversant with MS Office,MS Word, MS Excel & Power Point Presentations Experience in preparation of Hook up Drawing, Preparation of plot plans, preparation of Installation sketches, red markup etc. required for site constructions) Monitoring the compliance of the project to ensure that industry codes and practices are adhered to, quality assurance policies are followed, and performance standards are met.. Inspection of all process piping, mechanical and structural materials and other witness of hydro test & pneumatic test and leak tests as per QA/QC plan. Punch list liquidation and pre-commissioning activities plane.

SCHOLASTICS

B.Tech In Mechanical Engineering in 2000.

Diploma In Mechanical Engineering in 1995.

Diploma In Computer Application in 1999

Project Management Education Training of 40 hrs.

CAREER CONTOUR

From July 2007 till September 2020 with Dar Al-Riyadh & SMASCO IN SABIC-E&PM Site Project Mechanical Construction Engineer

Accountabilities of Mechanical Construction Engineer Construction Management including scheduling the construction activities for mechanical & piping disciplines managing & monitoring of contractor jobs, ensuring the work completion as per the approved schedule, Quality standards and SHEM’s standards.

Reporting Progress reports (Actual Vs Plan) to the Management and scheduling the critical activities, managing recovery plans to avoid slippages or delays in schedules. Reviewing of ITPs, Method of Statement, Job procedures, Construction Check lists, Lifting Plans, Equipment Erection Schemes/Plans and preparation of Punch lists and carryout the safety and project completion walkthrough, ensure to completion of pre-commissioning. Assistance in commissioning and start-up of the projects to rectify any construction backlogs in priority wise.

Arrange the receiving and Inspection of materials, package items, and consumables and other construction tools and tackles.

Review and certifying of contractor progress versus billing submissions. Review the IFC (Issued for Construction) packages and to support engineering team to finalize the packages in execution based on actual site conditions.

Provided the field with engineering support.

CONSTRUCTION MANAGEMENT & ENGINEERING P a g e 2 of 6 Classification: Internal Use

SENIOR SUBSTATION ENGINEER

Decanter along with process piping and Over Head Crane (OHD) & monorails installation including modification in substation by installation of PLC cabinets and configuration. Installation of critical PLC cabinet and configuration with existing system in plants Manage large highly complex projects and perform engineering analyses, studies, and develop conceptual designs

Develop technical equipment and construction specifications and work scope. Work closely with Civil Engineering department to develop substation foundation and structure drawings Develop technical procedures and contributes to the development of standards, specifications, construction documents, and guidelines

Establish and maintain professional relationships with our external business partners Acts as a lead in root cause analysis and makes recommendations to address local and system-wide problems

Perform the functions of Associate, Journey and Senior level Engineer STRUCTURAL SUBSTATION ENGINEER.

You will work on challenging assignments that include investigating, trouble-shooting, and solving a wide variety of structural engineering issues

Perform independent reviews of work performed by others including calculations and drawing preparation Prepare engineering studies

Develop integrated structural designs and perform supporting calculations for the planned work Prepare technical specifications for structural materials Using our state-of-the-art computer tools, you will perform structural analysis and design of steel frames, connections, concrete members, equipment and piping supports, and foundations Under the direction of the Structural Project Lead, you will be responsible for guiding junior-level engineers and designers in structural engineering design efforts, including providing guidance with the coordination of detailed design phases for all aspects of structural engineering work HVAC ENGINEER

Installation and maintained the plans for the HVAC equipment’s and ensured that they were installed properly.

Developed plans and upgraded the HVAC equipment’s and increased their efficiency. Managed the multiple HVAC project, prepared their schedule and estimated the cost of the required equipments.

Ensured that all HVAC equipments in the plant were in accordance to the engineering standards and codes. Performed troubleshoot on the HVAC equipment and installed the equipment according to the requirement. Designed the flow drawings and prepared the layouts. Coordinated with contractors of HVAC equipments

Issued work plans, managed subcontractors, analyzed operations and budget. Updated construction schedule, created productivity reports. Purchased, tracked and inspected material deliveries. Created RFI's and estimated man-hours for field change orders. Provide support for piping design, installation and testing of pressure piping systems. Created comprehensive construction specs; prepared project plans; and estimated schedules, and reports. Delivered resourceful technical support and ensured construction work complied with all engineering standards, codes, specs, and design instruction while continually communicating with clientele. Cultivated a progressive work environment by actively participating in project meetings within the field, as well as participating in constructability project reviews on an ongoing basis during the design process. Assist the QA / QC team in the verification of effective implementation of Contractor's ITP with relation to Welding & NDT.

Contribute to and facilitate best practice QA/QC procedures and develops monitoring programs for inspection, testing, sampling and training

Mechanical/plumbing/fire Protection Engineer

Direct the development of design concepts, layouts and other engineering documentation for various system elements working with Project Managers, Structural Engineers, Process Engineers, other Designers and Manufacturing staff to assure designs meet customer expectations, performance criteria and cost targets.

Effectively manage design hours, budgets and other engineering activities to assure assigned engineering work is completed on time and within established budgets. Provide design leadership on projects, which are medium to large in size and complexity. Work closely with the Project Managers to provide direct engineering support to our Customers, including design development, field measurements and engineering liaison. Utilize existing designs, design standards, drafting standards and CAD practices so project costs are reduced, lead times are shortened and construction issues are minimized. CONSTRUCTION MANAGEMENT & ENGINEERING P a g e 3 of 6 Classification: Internal Use

Assist in the development of universally acceptable design and drafting standards, which are accurate and easily implemented by both internal and external customers. KEY PROJECTS HANDLED and experience

Decanter along with process piping and Over Head Crane (OHD) & monorails installation including modification in substation by installation of PLC cabinets and configuration. Major Project “Turbine Modification for Sea & Cooling Water” in Yanpet T/A (2018) worked as lead Construction Engineer.

Ethylene Glycol DBN Mega Project IN YANSAB (CONSTRUCTION ENGINEER – 2017) Project Execution & controlling the Construction activities along with monitoring & supervision in to ensure the quality at step-by-step according to SABIC QA/QC plane. Project scope associated with installation of 06 distillation columns and nozzle and plates modification of 05 fractionating columns, construction of pipe rack and deferent pipe support foundations, arrange and attend the shutdown for Tie-in in live line and Fabrication of pipe rack, plat forms, and erection of all structure’s as per IFC, Erection and replacement of 25 pumps and alignment, cable laying, termination and installation of control and operating panels associated with existing control system and DCS and red mark-up verification. Prepare the pre- commissioning plane and coordinated with client and vender for final commissioning. IBN RUSHD-II DBN Mega Project in YANBU (CONSTRUCTION & Pre-Com. ENGINEER - 2013). NITROGEN COMPRESSOR Installation & Commissioning, Project at NIGC Yanbu (As a CONSTRCTION ENGINEER LEADER-2012)

Project coordination with affiliate and area owner, controlling construction activities with front line Engineers and Supervisors including to arrange progress meeting with Clint& preparing minutes. Supervised the field activities including to ensure the quality at step-by-step according to SABIC QA/QC plane during installation of, Multistage Nitrogen compressor, lube oil skid erection and related pipe line fabrication. Check and verified the field changes & erection including red mark-up verification. Alignment along with control valve installation, cable laying, cable termination, control and operating panel installation as per IFC. Prepare the plane for pre commissioning and supervised. Develop the close coordination with commissioning Engineers and area owner during the final commissioning and trial run of N2 compressor. OLEFINS RECOVERY PROJECT at YANPET POLYMER-I&II (As a CONSTRUCTION ENGINEER LEADER 2011)

Project coordination & controlling Construction activities monitoring & supervision in to ensure the quality at step-by-step according to SABIC QA/QC plane during installation of compressor and membrane foundations, construction of pipe rack and deferent pipe support foundations, arrange and attend the shutdown for Tie-in in live line and Fabrication of pipe rack, plat forms, and erection of all structure’s as per IFC, Erection of compressor, membrane skid, alignment, cable laying, termination and installation of control and operating panels associated with existing control system and DCS and red mark-up verification. Prepare the pre- commissioning plane and coordinated with client and vender for final commissioning. Replacement of Acetic Acid Columns Project at Ibn Rushd T/A - 2013 Project coordination & controlling Construction supervision and arrange the meeting with client. Supervised the field activities including to ensure the quality at step-by-step according to SABIC QA/QC plan during construction foundation and erection & installation of columns with related piping modification, instruments and supports.

Upgrade the PTA piping with Titanium Grade12-Sch-40, SS-904 & SS-317 Process Piping at Ibn Rushd T/A – 2014

Make a close coordination with T/A team round the clock and update to management. Arrange workshop to discuss and finalize the T/A work schedule up to micro level for each activities on hourly basis. Controlling Construction supervision with front line supervisors and Engineers including to arrange meeting with client. Monitor the field activities including to ensure the quality at step-by-step according to SABIC QA/QC

UPGRADE THE PACKEGING UNIT PROJECT at Polymer Dry End Packaging unit in Yanpet, SABIC

(2007)

Project coordination & controlling Construction supervision with front line supervisors and Engineers, and arrange the meeting with client of Installation and commissioning of Six Beumer Bagging Machine

(2400 Bag/Hours) with Erection of Packaging Conveyor System and Alignment. Installation of six long

,Conveyors,Palletizing Units, Stretching Hood Units and related with all control and operating panels along with all kinds of Platform Erections. Commissioning Assistance for the project and supervision of Pre- commissioning Activities like hydro and leak tests of pipe and instrument utility lines. Cabling & Terminations of Bagging Machine Interfacing to existing DCS Control Systems and function Test. CONSTRUCTION MANAGEMENT & ENGINEERING P a g e 4 of 6 Classification: Internal Use

ETHYLENE & PROPYLENE METER SKID in Yanpet for Yansab Plant (As a CONSTRUCTION ENGINEER LEADER)

Project coordination & controlling Construction supervision and arrange the meeting with area owners. Supervised the field activities including to ensure the quality at step-by-step according to SABIC QA/QC plane during construction foundation and erection and installation of related piping, instruments and Flow meters.

ETHYLENE METER SKID with FLOW COMPUTER in Yanpet for Natpet Plant (As a CONSTRUCTION ENGINEER LEADER)

Project coordination & controlling Construction supervision and arrange the meeting with client. Supervised the field activities including to ensure the quality at step-by-step according to SABIC QA/QC plane during construction foundation and erection and installation of related piping, instruments and Flow meters. Commissioning Assistance for the project and supervision of Pre-commissioning like Hydro test, line flushing, service test and function test.

Styrene-ll Project in SADAF Jubail (As a CONSTRUCTION ENGINEER) Erection of structural pipe rack, construction of tank ring wall, sump pit, pipe rack foundations, pipe sleepers etc.

GAN GOX CROSS COUNTRY PIPE LINE at NIGC Yanbu (As a CONSTRUCTION ENGINEER) Fabrication and erection of 21 km pipe line from GAS/Yanbu to Cristal Yanbu, and construction of related pipe supports.

Plant Shut down & T/A Projects at various affiliates of SABIC IN YANBU

(2007,2008,2009,2010,2011&2013)

Make a close coordination with T/A team round the clock and update to management. Arrange workshop to finalize the T/A work schedule up to micro level for each activities on hourly basis. Controlling Construction supervision and arrange the meeting with client. Monitor the field activities including to ensure the quality at step-by-step according to SABIC QA/QC plane during construction foundation and erection and installation of related piping, instruments and Flow meters. Commissioning Assistance for the project and supervision of Pre-commissioning like Hydro test, line flushing, service test and function test. Supervision of Heat Exchanger Bundle Tube replacement & hydro test of newly installed tubes. Major Projects Handled:

Nitrogen Compressor Installation, Associated Piping & Instrumentation in GAS. Olefins Recovery Project at Yanpet Polymer-I&II

Ethylene & Propylene Meter skid project for Yansab. Ethylene Meter Skid associated with Flow Computer project for NETPET. Ethane Meter Skid project for Aramco.

API/CPI Odor Control System Project.

PCVs and PSVs for YANPET-I

PDS valves & related piping at Polymer Unit.

See Water modification system at Offsite.

Upgrading Sump Pumps

Quench Oil Pump Upgrading

K - Tron Control System Upgrade project for polymer units New CCR building in Sab tank.

New maintenance building in Yanpet.

Turbine Modification for Sea & Cooling Water” in Yanpet T/A (2018) IBN RUSHD-II DBN Mega Project

PREVIOUS ASSIGNMENTS

Since May’2001 till Jun‘2007: National Environmental Preservation Company – BeeA’h Jubail Saudi Arabia

Seven Years Worked as Operation Engineer of “Incinerating the Hazardous Waste” at HWIF- Operation

Accountabilities:

CONSTRUCTION MANAGEMENT & ENGINEERING P a g e 5 of 6 Classification: Internal Use

Configured and control the process and operating systems for incinerating the Hazardous Waste feed through all feed tanks and solid package with tracking and scanning.

Maintained daily operation logs compiling the production and error correction in orders where needed.

Set-up, distributed, and provided technical assistance on incinerator units.

Orchestrated and performed multiple audits increasing company production efficiency.

Trained and mentored new employees decreasing company turnover rate.

Planning, Scheduling for operation with respect to manpower, Equipment and Material.

Plan and Managing site operational activities as operation supervisor.

Implementation of Improved Production Strategies with respect to the available resources through output cost analysis.

Preparation of erection scheme for Equipment along with site maintenance team.

Preparation of Hydro-testing Scheme, Flushing procedure, Tie-in procedure. Liaison with client & Inspection agency, Sub-contractor.

As Built documentation, Reconciliation of materials.

Strong knowledge to fabricate the steel, to read and modify the mechanical process drawing, selection of materials, preventive maintenance and corrective action of mechanical equipment’s, daily maintenance.

Strong knowledge to operate the PLC control system, high capacity motors, circulation pump, and high capacity draft induced fan, air compressor and blowers and also troubleshooting for hydraulic equipment’s.

Having ability to prioritize tasks, issue the work orders, waste manifest and work under pressure & good communication skills.

Coordinate with schedule daily work assignments for shift personnel’s well as for plant support personnel and also for schedule daily waste feed plan.

Prepared and review the safe operating procedures for different chemical feeds plan.

To attend weekly fire and safety meeting to keep maintained the all safety standards.

Trained employees on safety policies and procedures by conducting weekly safety meetings which resulted in minimal warehouse incidents.

Shipping and Receiving of Hazardous Chemical Waste:

Performed inventory and stocking of waste materials and supplies.

Monitored surface pickup, delivery, and distribution of waste products

Prepared correspondence and reports of daily warehouse operations

Trained new employees and supervised waste stocking.

Managed shipping and receiving schedule

Worked with Operations Manager to ensure deadlines were met

Organized and set up of different warehouses to utilize space

Organized routes for drivers to complete deliveries on time

Organized and managed general work area to ensure proper safety rules and regulations are abided

Performed quality control inspections of incoming and outgoing products to ensure goods are complete

Supervised three personnel in department to maintain a steady, safe, and constant work flow.

Forecasted stocking requirements to meet desired quantities.

Resolved inventory related issues to ensure accuracy. Directly Report to “Manager Waste Division and Operations”.

Participated in continuous improvement activities as part of the site management team and ensured company policies are followed.

Calculated and communicated staffing requirements across multiple shifts on a daily basis.

Conducted daily food safety audits on outbound customer shipments to ensure quality and accuracy.

Managed and monitored various KPI's to ensure the facility was meeting its goals.

Trained, coached and disciplined my team to ensure their compliance with all company policies.

Drove a team to achieve company initiatives and achieve a high level of productivity.

Proficient in the use of Outlook, Word, Excel, Power point and Access data bases.

Operated various powered equipment’s and machines.

Delivered associate orientation, training, performance reviews, and/or development as appropriate.

Ensured the associates have proper access to the necessary tools to perform their assigned duties and that tools are routinely inspected and maintained.

Executed daily customer/vendor contract requirements; identified accessorial activity and ensured necessary documentation.

Maintained excellent relationship with field maintenance and support teams.

Created a new process to house revisions with the use of a database which eliminated multiple emails and provided a centralized storage location.

Managed workload to have design documents issued early which generates revenue sooner.

Kept overtime expenses significantly under budget while maintaining objectives.

Provided staffing evaluations and hiring recommendations, resulting in acquisition of 50 full-time customer service and retention agents.

CONSTRUCTION MANAGEMENT & ENGINEERING P a g e 6 of 6 Classification: Internal Use

Created staffing forecasts for site supervisors within Account Retention division.

Managed proactive and reactive customer retention teams by developing

Coached and mentored site supervisors, team leaders, and retention agents to Professional Trainings:

One week training for “Customer Relation Management Course” by Focus Learning Consulting Malaysia in Saudi Arabia.

One week training for “Professional Business Communication” by Sabic KMC. One day training for “Fire and Gas Detection System” conducted by General Monitors. One day Training for Ethylene Metering Skid by Elster Insromet Company-Malaysia. Certificate of two days Training for “Overcoming the Risks of Project Execution” by KMC. Two weeks training for “Project Management Education” conducted by ANEXAS. Member of “SAUDI COUNSIL OF ENGINEERS” and certified. Skills and Capabilities:

Excellent communication and interpersonal skills.

Fair and considerate professional with cheerful personality. Excellent team leadership and management skills.

Quality conscious and excellent record of service and references. Ability to work effectively on multiple simultaneous tasks with in fast paced, Customer oriented environment.

Able to learn quickly and posses’ good analytical skills. Problems solving activities.

Dependable self-motivated.

Work well in team environment.

Achievements:

• Certificate of Appreciation by E&PM MEGA for EG DBN-2018 YANSAB Project in YANBU for Construction Engineer.

• Certificate of Appreciation by Sabic Gas President - year 2012 for successful completion and commissioning of N2 Gas compressor

• Certificate of Appreciation by Yanpet President - year 2008.

• Certificate of Recognition by FLUOR DANIEL ARABIA – year 2009

• Certificate of Appreciation by SS E&PM YANBU GM for support and contribution of successful completion of IBN RUSHD T/A in year-2010 Feb.

• Certificate of Appreciation by SS E&PM YANBU GM for support and contribution of successful completion of YANPET T/A in year-2010 April-May.

• Certificate of Appreciation by NATPET (National Petrochemical Company-Yanbu) – year 2011.

• Certificate of Training by General Monitor for Fire and Gas System.

• Certificate of Appreciation by SS E&PM GM for Safety Man of the Month for YANPET year-2011’ July.

• Certificate of Appreciation by E&PM MEGA for IR-II DBN-2013 Project in YANBU for Pre-Commissioning Engineer.

• Certificate of Attendance - ASME Code B 31.3 Process Piping by KMC. PERSONAL PROFILE

Address : Aligarh

Nationality : Indian

Marital Status : Married

Passport Number : S-9749036



Contact this candidate