Post Job Free

Resume

Sign in

Engineer Mechanical

Location:
Chennai, Tamil Nadu, India
Posted:
January 17, 2021

Contact this candidate

Resume:

Project Management & Execution

EPC/Construction Project Planning

Reporting & Documentation

Sub-Contractors/Vendor Mgmt.

Estimating & Budgeting

Project Risk Analysis & Mitigation

Client Relationship Management

Team Building & Leadership

A performance driven professional, targeting senior-level assignments in Project Management and Planning, with an organization of high repute, preferably in Oil

& Location Gas, Water Preference: and Steel South industry India Profile Summary

Resolute in Expert risks, Acquired EPC opportunities Project in and 4.defining 5 committed years Management and scope of constraints experience professional, and setting engaging as offering objectives, a Sr. all nearly Project stakeholders identifying 9 Engineer years and of experience evaluating / Project Engineer Skid, Gained maintenance Piping, 3 years in Columns, construction for of rotating experience Structures, of equipment) Storage as Civil a Mechanical Foundations Tank at waste (API 650)Engineer water at steel, Pressure treatment company, (installation Vessel, plant K.S.A Silo, and for domestic Monitored time overruns and & controlled industrial and quality water, projects compliance Jeddah, with K.respect S.& A ensured to cost, satisfactory resource execution deployment, of projects Multi-tasking w.r.t. statutory leader with requirements qualitative experience in formulating strategic plans Profound Experienced Architects, Proficient performance Knowledge and tools with knowledge in within Subcontractors key of in setting with various focus liaising key the project on in project latest organization & rotating profitability coordinating and KPIs, engineering accomplishments, External and priorities which static with Agencies & equipment can EPC and project highlights be Contractors, deadlines applied evaluation and to to Vendors, measure lowlights produce techniques Clients, project cost- effective Team-vision into based solutions reality Management for the organizations style with expertise in driving the company’s 2012: University, 2008: 2006: 35 Education Hrs 12th 10th PDU Mechanical from from Chennai – Project St. St. Antonys Antonys with Engineering Management 7.64 Higher Higher CGPA from Secondary Secondary Institute Sasurie School School College and and secured secured of Engineering, 76.77% 5% Anna Done Components Delivered Completed Station”, Academic a Tamil project a in-mini Private plant Nadu, Projects project on training Limited India “Automation on “Design and on “Boiler Trainings and of Rubber maintenance Fabrication Sheet of at Shear Cutting” Government Cutter” in Sundaram Thermal Power Auto Primavera ERP MS AutoCAD SolidWorks Technical Excel System (2D P6 (SAP) & Skills 3D) Soft Skills

ANTO SUTHARSON

Senior Project Engineer

adjhpa@r.postjobfree.com

+966*********

Collaborator

Communicator

Planner

Analytical

Leader

Thinker

Key Skills

Career Timeline

Work Experience

Since Feb’20 with Hidada Ltd., Rabigh, Saudi Arabia as Sr. Project Engineer Project Executed:

Petro EPC (Storage Rabigh Tanks, Piping, Fire Fighting, E&I, & Commissioning) Feb’20 – Till Date Key Result Areas:

Leading Interacting Generating Fetching Coordinating Controlling Monitoring Spearheading making Formulating Vessel, Organizing Spearheading Generating Formulating safety Supervising internal Preparing generated Designing the stages aspects Skid, sure and the the of during and technical project complete weekly daily project and Silo assigned the operating external that approval project Standard the the the implementing projects executing project with material the detailed technical EPC review and costs project specifications preparation project legal the from budgets project Operating monthly start-within by clients the deliveries engineering meetings / clarifications the approving commercial gets by up stringent projects cost management & client preparing reports; contracts to done managing and Procedures & interpret & for and time for implementation w.expenditures scope on of evaluating systems teams r.assisting delivering all and the time norms t. / the overall documents agreements, the process their projects negotiations and schedule, for and budgeted and in needs deliverables, new project construction within the & the quality from administering of reports and processes coordinating logistics and due project cost, progress with budget the drawings plans requirements; diligence, conceptual demand to vendors activities generating execution shipment the / / & manuals equipment contractor and de-management formulation forecasts bottlenecking for monitoring development plan delivering estimates execution to (contracts for ensure PEP) & & time and ensuring clients the report and of negotiations high overruns stage assigned pipeline, BOQ quality to the through management based environment, project storage in standards final coordination on tanks, requirements construction, and during health Pressure client with all & Previous Experience

Aug’16 – Jan’20 with Al Zamil, Jeddah as Project Engineer Projects Executed:

1. 2. 3. 4. 5. Farabi Construction Aramco Construction SEC Construction Petro Construction Yanbu Shutdown- Rabigh Petro Petrochemical Maintenance Feb’14 of of of of Chemical 22 fuel SS tanks storage no. – tanks Aug’16 (of 75 Project tanks M (tanks IFR) Dia)with (IFR, – - & 8 6 Dejla Silo No’s no’s Dome) Water Apr’19 May’18 Oct’17- Dec’16 Aug’16 (env.tech.– – – Apr’18 – Jan’20 Sep’17 Dec’16 Mar’19 com), Jeddah, K.S.A. as Mechanical Engineer Projects Executed:

National o o Domestic Industrial Water water water Company treatment treatment (NWC)plant plant, Jeddah capacity capacity 250***-***** cubic cubic meter/ meter/day day May’12 – Jan’14

Feb’14 – Aug’16

Aug’16 – Jan’20

Since Feb’20

Highlights:

Conducted mixer, submersible skilled maintenance pumps, reciprocating and installation and screw of equipment compressors, like belt centrifugal press, multi pumps stage (1KW air blowers, up to 950KW)screw conveyors,, aeration varies Facilitated for Executed improved Led activities Engaged order Ensured Successfully equipment Analysed national separating and to types identify & that monitored in and their the international the monitoring of maintained all reviewed Risk water alignment valve, reliability engineering and Based a and perform sand group sewerage the standards sludge) the of and filters, Maintenance rotating centrifugal related workshop corrective of availability Technician, storage work and equipment blower, submission maintenance safety (at tanks RBM) site Supervisor procedure & pump, and & performance gear delivered which Root boxes rotary and of including Cause firefighting blowers, technical General such Failure as process Workers, vibration compressors, solutions Analysis calculation engaged analysis, while (RCFA) drive and dismantling in lubrication belt, for technical maintenance decanter rotating and drawings system equipment (ALFA assembling & installation analysis based LAVAL and on in of – May’12 – Jan’14 with Ampo Valves India Private Limited, Tamil Nadu, India as Production Engineer Highlights:

Assigned Ensured Conducted pressure Engaged Prepared compliance in safety the the identifying the tasks reports valve troubleshooting and with and & the guided safety submitted daily root relief a causes dispatch group while valve to of of the assembling report leak technicians management in as valves established the on while valves a daily Hydrostatic by like basis scheduler gate vale, testing, to meet globe Pneumatic shipments valve, check testing on a valve, consistent and Shell butterfly testing basis valve, Date Languages Membership: Personal of Birth: Known: Details 11th English, Project May Management Tamil, 1991 Hindi,Institute Malayalam. ( PMI) -6050215 Permanent Address: 6/293, Kanyakumari, Tamil Nadu, India



Contact this candidate