Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Neyveli, Tamil Nadu, India
Posted:
January 09, 2021

Contact this candidate

Resume:

CURRICULUM VITAE

THIYAGU ERULAN

E-mail: adjayr@r.postjobfree.com

Contact No. : +91-781*******, & +91-944*******

OBJECTIVE

To attain a position of excellence in engineering industry and wish to work in challenging and creative environment with strong zeal toward achievement of goals, Engineering, Management, field presents a wide array in this aspect

PROFILE

An astute professional with around 10 years of rich experience in Upstream, Downstream Oil & Gas and Power Plant Project. A good academic background with professional experience in countries such as India, Qatar & Kuwait has made me understand issues and generate reasonable solutions. Experience in managing and supervising at project level in all Engineering and Construction procedures, which are essential for the projects. EXPERIENCE

EMPLOYER : GS ENGINEERING & CONSTRUCTION (JGSK-JOINT VENTURE OF JGC, GSE&C & SKE&C) Position : Instrument Supervisor

Duration : March 2017 to August 2020

Site : Naphtha Hydro Treater Unit, Hydrogen Production Unit and Coke Handling Unit PROJECT : KNPC CLEAN FUEL PROJECT,KUWAIT

Nature of Job : Over all Instrumentation Construction & Commissioning Activities. EMPLOYER : CAIRN INDIA LTD THROUGH TECHNOSYS ENGINEERS AND CONSULTANTS Position : Instrument Engineer

Duration : March 2016 to Jan 2017 & June 2010 to Sept 2015 Site : Aishwarya, Mangala & Bhagyam Well pads & Power Plant Project. PROJECT : CENTRAL POLYMER FACILITY PROJECT (ENHANCED OIL RECOVERY),RAJASTHAN,INDIA. Nature of job : Duties involving in Stanchion, Instruments, Junction Box, Impulse, Air Tubing, Analyzer Tubing, fire and Gas instrument, Control Panel, Deluge Valve Tubing & MCT installation as per Approved drawing, Signal and Fiber Optic (FO) Cabling and Termination as per Cable Schedule and Wiring Diagram in field & Control room Side. Loop checking, Trouble shooting & Commissioning activities. EMPLOYER : JAPAN GAS CORPORATION

Position : Function Test Engineer

Duration : October 2015 to January-2016

Site : LNG Site Train 1&2

PROJECT : BARZAN ONSHORE PROJECT,QATAR

Nature of job : Pre-Commissioning and Commissioning of field instruments, Cause & Effect checks with Alarm & Set Points as per IO list for ESD and PCS logic checks as per PCN and receive the Function Test Folder from Chief Commissioning Engineer and performing function Test. WORK DESCRIPTION

Calibration,Installation,Commissioning and maintenance of various Pressure,Level,Flow Tempearture,Vibration,Speed instruments.

Hands on experience in Commissioning and Troubleshooting of Pneumatic, Electronic and SMART Transmitters of different makes (Rosemount, Fuji, MTL, Honeywell, Foxboro, Endess&Hauser, Baily Fisher, Yokogawa etc.) for the measurement of Pressure, Ultrasonic,Thermal,DP,Turbine Flow meters for measurement of Flow, RTD,Termocouples,Pyrometer for measuring Temperatures, DP,Ultrasonic,GWR for measuring Level,etc, Interface Level and Density.

Commissioning of CTM (Custody Transfer Metering Skid) ALDERLY, Dubai, consists DEMBLA control valves, DANIEL Ultrasonic Flow Meter,Prover skid with 4 way

(MOV)Motorised Valves(make: Rotork) and Sampling system.

Installation,Commissioning and Troubleshooting of Conveyor Package Instruments like Pull Cord,Belt Sway,Belt Alignment Switches,Load Cell for Belt Scale,Speed Sensor and Metal Detectors.

Hands on Experience in Power Plant Instrumentation Activities includes SG,TG & BOP.

Commissioning and Troubleshooting of Instrument installed in Equipments such as,Crusher,Mill Discharge Valves,Silo,Pre Heaters,Furnace,Chimneys,Hot & Cold Air Damper,ID,FD & PA Fan,Burner Tilt Control,Flame Scanner,Pyrometer,SADC,ASLD,Boiler Drum Level Control & Ignition Rod.

Performed Control Valves and ESD valves operation and stroke check

Functional test of Motors, Heaters, Recycle Gas Compressors, ESD Valves

Hands on Experience in Power Plant Instrumentation Activities includes SG,TG & BOP.

Commissioning and Troubleshooting of Instrument installed in Equipments such as Mill Discharge Valves,Rotory,Screw Feeders,Silo,Furnace,Chimneys,Hot & Cold Air Damper,ID,FD & PA Fan,Burner Tilt Control,Flame Scanner,Pyrometer,SADC,ASLD,Boiler Drum Level Control & Ignition Rod.

Having experience in PLC,SCADA,DCS & IPS Systems.

Knowledge of various Instrument Drawings such as Instrument Typical Drawing, Instrument & Junction Location layout, Main Cable Layout, Tray Trunking Layout, Equipment Layout, P&ID, General Arrangement Drawing, Cable Schedule, Instrument Wiring Diagram,Hook up, data sheets, I/O wiring diagrams, P&IDs, Cause & effect, Instrument Loop Diagram(ILD) specifications for effective application.

Field Fire & Gas instruments hot loop checking like(H2s,SD,FD,OPD,MCP,MPS & Innergen system)

Laying of internal earthing, power, signal and field cables as per schedule.

PAGA commissioning time coordinating with Telecom team.

Done documentation works such as ITR’s, Red line mark-ups in ILD’s.

Commissioning of Instrument Air Compressor (make: Atlas Copco) system such as signals from DCS to compressor via PLC through Modbus communication and performing the compressor in auto mode from DCS.

Engaged in Project / Construction and Commissioning Management as per design strategy.

Refer and Understanding Contractual scope of work, Project Execution plan & Quality Management System (QMS).

Refer and Understand Design Engineering Practice (DEP), Project Specification & Project Variations (PV).

Coordination with other Department, Contractors (OC) and Sub-Contractors to smoothly finish the construction activities with quality.

Inspecting / defining related materials per Scope of Work and drawings; solving engineering related problems and securing the approval/concurrence from concerned engineer before execution.

Responsible to control and complete the construction & Quality activities related to Instrumentation in schedule time.

Supporting to site engineering manager to ensure effective project closeout, including documentation & Engineering Issues.

Attending meeting with the team member for generating completions status reports and managing system walk downs and punch list recording.

Follow up with Procurement department for engineering materials

Support for inspection such Site acceptance test (SAT) by compiling all Company standards.

Coordinate with QA/QC to make sure that Notification for Inspection (NFI) are being cleared day to day basis.

Direct and monitor Material Take off (MTO) activities, identify irregularities and shortfalls, take corrective action as required.

Planning and scheduling of activities in collaboration with construction contractor designated personnel, estimation of manpower, equipment’s and materials necessary for each activity.

Routine Planning for daily activities like mobilization of manpower & material requirement at site & providing the same for Execution.

Ensuring compliance norms and standard procedure during Engineering & Erection of all type of Instrument and strictly follow work permit system for jobs.

Define and prepare the segregation of systems for early production with related procedure for system isolation and involved in System Completion.

Prepare Inspection and Test Reports (ITR) for pre-commissioning activities and forwarding to Comm. Manager and QA&QC Manager for review, comments, approval and integration in QA&QC plan for pre-commissioning and commissioning.

Punch list coordinating and closing CAT-A, B, C.

Preparation and update of commissioning progress reports, minutes of meetings.

Performing loop check and fault finding as per Loop wiring & Schematic Logic Diagram Logic check, cause & effect check and control narrative checks.

Supervise Function test field technicians and coordinate with function test superintendent.

To implement and test of wide range of I/O in HART and Foundation Field bus communication by Modbus, Profibus, etc. control function interlock sequence, operator interface and other control components on DCS, PLC,ESD.

Conducting inspection, pre-commissioning and functional testing to ensure the performance capacity of various machines & equipment.

Preparation of DPR & WPR & submitting the same to Planning.

Checking and releasing of Sub Contractor Invoice / Measurement & reconciliation of material.

Conduct periodic audits to identify gaps and ensure instrumentation system operation and maintenance adherence to Group Standards and Best Maintenance Practices.

Manpower & Equipment Planning Mobilization & Demobilization.

Project Scheduling and Variance Analysis.

WORKED WITH STANDARD CALIBRATION TEST/MASTER EQUIPMENTS

Pneumatic Calibrator (Druck DPI-610 IS)

Electronic Calibrator (CA, 100 by Yokogawa) Multifunction Calibrator (Fluke 725, Druck DPI- 620 IS),Loop Calibrator(Druck UPS III IS)

Hand Held Communicators such as Smart (Honeywell, Emerson, Yamatake) & Hart ABB, Rosemount 275,375,475 Yokogawa BT 100, BT200.

High Pressure Calibrator (Dead Weight Tester, Comparator).

Process Calibrator, Stimulate/Meas,SourcemA,mV,RTD,TC,HZ,(AltekTechcheck/TM-820 Druck,Fluck,etc).

Dead Weight Tester – M2000-3, M2800/2, Ruska Instrument Corporate PROFESSIONAL TRAININGS & CERTIFICATES

Awarded for Best Near Miss Findings and Safety of the Month For the month of July 2017 and August 2017 at KNPC CFP Project MAA Refinery Kuwait.

Awarded for Best Job Safety Observer for the month of June 2017 and July 2017 at KNPC CFP Project MAA Refinery Kuwait.

Awarded for Best STARRT Coach for the month of July 2017 at KNPC CFP Project MAA Refinery Kuwait.

QUALIFICATION

DEGREE/TECHNICAL

COURSES

YEAR OF

PASSING

NAME OF INSTITUTE UNIVERSITY/ BOARD %

B.E (ELECTRONICS &

INSTRUMENTATION

ENGINEERING )

2010 KONGU ENGG COLLEGE,

TAMILNADU

ANNA UNIVERSITY 73

12TH 2006 JAWAHAR MATRI HR SEC

SCHOOL

STATE BOARD 75

10TH 2004 JAWAHAR MATRI HR SEC

SCHOOL

STATE BOARD 74

STRENGTHS

Good communication and inter personalskills.

Capability of executing challenging assignments with right blend of intelligence, diligence and patience.

Computer Proficiency

Well versed with MS- Office, Microsoft Outlook & Internet access PERSONAL VITAE:

Name : Thiyagu

Father’s Name : Mr. Erulan

Date of Birth : 10-Nov-1988

Marital Status : Single

Passport No. : P5848306

Date of issue : 15-12-2016

Date of expiry : 14-12-2026

Language knows : English, Hindi, Tamil

Permanent Address:A3, Rose Garden, Srinivasa Avenue II, Gandhi Nagar Post, Neyveli- 607308, Tamilnadu, India

Phone No : +91-781*******, +91-944*******

DECLARATION:

I hereby declare that the above-mentioned information is correct up to my knowledge and I bear responsibility for the correctness of the above-mentioned particulars.

PLACE: NEYVELI SIGNATURE

DATE: THIYAGU ERULAN



Contact this candidate