Managed first engine change program for Ecuador's
first ATR at the age of 25.
Took over the project director’s position on the first EASA Part 145 MRO staff (Joint venture) Skyways
Technics and Ukrainian International Airlines at the end stage of the project.
Pioneered Part 145 remote line planning services for Skyways Technics (Denmark).
Built Line Mx & Consultants digital tools from back to front end (Programming).
Customer and results oriented aircraft engineer with strong analytical skills. Technical Aviation and Aircraft Maintenance Engineering polyglot. Focused and proactive approach to any engineering projects I am a part or in charge of. Extremely fast learner.
S UMMARY
E D U C A T I O N
EMAIL: ***********.******@*****.***
PHONE +38-068-***-**-**
LINE MAINTENANCE PLANNING ENGINEER, PART M AND
PART 145
SKYWAYS TECHNICS A.S,DENMARK JAN 2017 - APR
2020
ATR Line Maintenance Planner Engineer.
ATR (all) series, B737 & CRJ 200 Aircraft Storage
Control Planner Engineer.
Project Manager for ATR 72 cargo conversions (BLL) MRO 2018.
ATR72 Heavy maintenance technical services
project manager (SGD) MRO 2018.
B737NG Heavy maintenance planner (KBP) 2017.
CRJ 200 Aircraft delivery from N (FAA) to OY (EASA – DK CAA) reg – USA Montana (GTF) 2017.
TECHNICAL SCHOOL BOLIVAR DE AMBATO
AMBATO, ECUADOR JUN 1999 - 2007
BS Math & Physics
E X P E R I E N C E & MAJOR A C C OMPLISHMENTS
E X P E R T I S E
Daniel Granja
AIRCRAFT MAINTENANCE ENGINEERING CONSULTANT
INDAER A.S., COLOMBIA MAY 2016 - DEC 2016
Aircraft Reception ATR72-500 Azul to NAC, Belo
Horizonte, Brazil.
CAMO EASA Part 145 Fleet Control consultant for
Skyways Technics AMP customization, LDND control, AD SB implementation on ATR fleet under storage, Denmark SGD.
Engineering Support remote assistance, Colombia MED. EASA CAMO (Part M)
EASA Part 145
Aircraft Maintenance FAA & EASA
regulations
Maintenance Planning
AMP customization
AD/SB Analysis & Compliance
Aircraft Structures & Systems
ATR72 Cargo conversion
Aircraft delivery/redelivery (Airbus,
ATR, CRJ).
PAX to Freighter conversion
Technical Records
Project Management
NATIONAL AVIATION UNIVERSITY OF
UKRAINE
KYIV, 2007 - 2012
BSc. Aircraft Maintenance
Engineering BSc.
Major: Theory of mechanisms, aircraft
design, aircraft maintenance.
Minor: Aerodynamics, metal processing,
reliability.
CLIFTON AVE GRADE SCHOOL
LAKEWOOD, NEW JERSEY, USA 1993-1997
C O N T A C T
1 YE contract for CAMO engineering with Derichebourg (France) for Airbus 320 family, A330 & A340.
A320 mid-lease inspection on behalf of CDB aviation. A330 LDND vs. MPD& AMP for Airbus aircraft leasing management.
A340 LDND vs. MPD& AMP for Airbus aircraft leasing management.
FREELANCE CONSULTANT 2019 - PRESENT
Reliability control program and
Maintenance Costs Seminar (Airbusiness
Academy) Nov/2014, at Miami springs
Airbus Training Center USA.
A330 SRM certificate course given by
Airbus official trainer (TAME 2015).
AMASIS production module course given
by IFR official trainer (TAME 2014).
Human factors (HF) EASA Part 145 A30. (e)
course Certificate.
Fuel Tank Safety (FTS) phases 1&2
requirements of EASA ED 2009/007/R
course Certificate.
Electrical Wiring Interconnection System
(EWIS) TG 1&2 requirements of Annex III to
ED Decision 2008/007/R of 29/08/2008
AMC20-22 (Aeroplane Electrical Wiring
Interconnection System Training
Programme) with respect to target groups
1&2 course Certificate.
P R O F E S S I O N A L C O U R S E S
SPANISH & ENGLISH – bilingual
RUSSIAN & UKRAINIAN - proficient
French, Turkish, Portugese - basic
L A N G U A G E S
MS OFFICE:
WORD & EXCEL (PROFESSIONAL),
POWERPOINT;
OUTLOOK,
G-SUITE,
CANVA,
WORDPRESS.
ADOBE ILLUSTRATOR
ADOBE PRO
O T H E R S K I L L S
AMOS,
AUTOCAD 2012 (2D DESIGN),
MATHCAD,
AMASIS.
AIRBUSWORLD,
ATRDOC,
PENTAGON AIRCRAFT MAINTENANCE
CONTROL SOFTWARE,
P R O F E S S I O N A L S O F TWARE AIRCRAFT MAINTENANCE ENGINEER TAME AIRLINES, ECUADOR FEB 2013 - MAY 2016
ATR42-500, Embraer-190, Airbus 319-320, Airbus 330 Maintenance programs (3 years 3 months).
ATR42-500 Fleet Engineer (2 and a half years):
PW127M Power plant Engineer (2 and a half years).
Technical representative and head of the following technical projects:
- AD, SB control, elaboration of Engineering Work Orders.
- Engineering support with manuals and interpretations.
- Major events coordination.
- AD, SB control, elaboration of Engineering Work Orders.
- Engineering support with manuals and interpretations.
- Major events coordination.
- Oil consumption control.
- AIRBUS 320/330 Structures Engineer (1 year 3 months):
- AD, SB control, elaboration of Engineering Work Orders.
- Engineering support with manuals and interpretations.
- Major events coordination.
- First TAME 2 ATR42-500 C1 + 2 YE Checks - Projects applied to heavy maintenance ATR aircraft model
(Medellin - Colombia) 2 months.
- A320 C8 + 12YE Check technical representation and project management. Heavy maintenance and structural maintenance applied to the model A320 aircraft
(Alabama - USA) 4 months.
PRODUCTION ENGINEER
DIAF MRO (B737CL), ECUADOR NOV 2012 - JAN 2013
Hangar bay production engineer.
Unskilled Mechanic