Post Job Free

Resume

Sign in

Manager Engineer

Location:
Vasant Nagar, Karnataka, India
Salary:
9.0 LPA
Posted:
February 17, 2021

Contact this candidate

Resume:

Harish Mohan (Age ** Yrs.) Current Location – Kerala

Preferred Location – Kerala, Coimbatore, Hosur and Salem;

Mobile – 094********/ 094********

Email – adj9j2@r.postjobfree.com / adj9j2@r.postjobfree.com

Truly I would like to share with you that I have a career gap due to my personal issues

Specialization –

DME (’93), BE Mech (‘13) with 23 yrs. exp in Procurement /Supply Chain Management /Logistics/ Sourcing / Vendor Development / with special focus on Purchase / Warehouse / Inventory management.

Kanban, Kaizen, FIFO, 5S, Lean Production System, JIT, VSM, VAVE, Production Planning, Unique Part development, Cost Reduction etc.

20+ years experience in Purchase, Procurement / Supply Chain of (BOM, Non BOM, Consumables, Capex, Raw Material, Consumer Goods, Spares, Semi-finished goods/ Unique parts) / (Negotiating with suppliers regarding rates, Product coordination, ensuring the quality standards.

Carried out Cost Reduction activity and achieved nearly a target of 10 % of total value, Inward Logistics,

Objectives –

Use my experience for bringing significant change to the organization I work for.

Be a team player & help create an atmosphere for entire team to enjoy their work & deliver their best and to accomplish the departmental goals.

Career Profile –

SFO Technologies

(Jul 2016-May2019) Dy. Manager ( Procurement & SCM )

Protech Appliances

(Sep 2012-Jun 2016) Dy. Manager ( Procurement & SCM )

FCI OEN Connectors

(Apr 2002 – Aug 2012) Sr. Engineer Procurement & WH

OEN India

(Jun 1995 – Mar 2002) Sr. Supervisor -Materials

1.Responsible for the Planning & sourcing of Electrical, Electronic, Mechanical, ESW Pipes, Sheet metal parts, Flat rolled metal strips, Machined Parts and Forged parts on the basis of monthly Sales Plan.

2.Unique Parts Development / Vendor development.

3.Responsible for running the Production line without any shortage of Parts and Consumables. (PPC)

4.Developed new supplier for packing material / Components / Raw Material & Consumables, which reduced COST & STORAGE SPACE.

5.Restructured and arranged all the Purchase activities to have JIT practice to reduce excess Inventory Carrying Cost.

6.Validation of BOM with actual requirements.

7.Develop strong Vendor / Supplier base.

8.Negotiation of Capex Purchase / Services.

9.Responsible for MIS / Cycle counts /Physical counts

10.Inventory within budget.

11.Supplier capacity planning.

12.Monitor inventory level and supplies.

13.Ensure stock for urgent demand from customers.

14.Ensure scrap disposal.

15.Saved INR 18L by taking one-time deviation for using items classified as non-moving stock.

16.Worked with cross functional team to convert items on Air shipment to Sea shipment reducing the overall logistics cost.

17.Storage space for pkg materials reduced from 12k sq ft to 8k sq ft by identifying, standardizing & removing non-moving materials.

18.Implemented color coding to follow FIFO system for all shelf life items.

19.Association work with CHA for clearing the import of goods.

20.Member in CFT.

21.OTD performance.

22.Vendor evaluation and agreement for supply of goods.

23.Freight Finalization.

24.Manage non-conformities

1.Developed new

Supplier for recently launched mixer grinder which provided much required overall stability of Cost, Quality, and Delivery & Service.

2.Built the entire supply chain of suppliers, tool & mold makers, stamping subcontractors & job work suppliers for major products.

3.Finalized the process for long pending

recon of job

work materials.

4.Set up a replenishment model to cut down excess production & FG Inventory.

5.Reduced overall team of 26 people to 12 people with improved performance.

6.Restructured and arranged all the Purchase activities to have JIT practice to reduce excess Inventory Carrying Cost.

7.MRP Calculation and arranging the parts on time.

8.BOM generation to MRP calculation Process

9.MIS / Cycle counts /Physical counts

1.Rearranged a store of 20k sq ft area to align with LPS/5S & Kaizen standards to address the non-moving stocks / old stocks / FIFO.

2.Introduced the concepts of flow racks for better implementation of FIFO.

3.Developed a supplier for packing material to pack the connectors in the form of reels

4.Identified a supplier to resizing the non-standard sized materials.

5.Introduced kitting method to

issue parts to avoid inventory pileup at production & subcontract sites.

6.Sourcing and arranging the Consumables using in Production including chemicals for plating shop.

25.Vendor evaluation and agreement for supply of goods.

1.Developed a vendor to re-cycle the used IPA which reduced the overall cost of IPA brought.

2.Developed alternative packaging for relays which helped to reduce the in-transit damages.

3.Implemented color coding to follow FIFO.

Known: English, Hindi, Malayalam, Tamil, Kannada, Konkani (Speak only)

Languages Notice Period: 15 Days Max

Expected Salary: As budgeted for this opening.

Thanks and regards,

Harish M Mohan -

949**-*****



Contact this candidate