Post Job Free
Sign in

Senior/land surveyor

Location:
Dubai, United Arab Emirates
Posted:
February 16, 2021

Contact this candidate

Resume:

HENRY GARCIA BALDONADO

Satwa dubai

Mobile: 056-***-****

Email Add: adj7za@r.postjobfree.com

Applying for: Senior land surveyor / Land Surveyor Career Objectives: To secure a position in a well-respected organization, that will provide long-term employment and professional growth in the global field of Engineering & Construction.

JOB ATTITUDE

Performs assigned task without much supervision.

Accept criticism and advices from authorities and also open to suggestions from Colleagues and co-employees.

See to it that the duties and functions are being performed with dedication, honesty And diligence.

Look for the time for every work and responsibility by means of time management. Ability to Manage a team and be responsible for their performance. Work Experience

Nass Contracting LLC

P.O. box 38003 Adnic bldg. Abu Dhabi

Position: SR Land Surveyor March 20, 2017 – August 11,2020 Duties & Responsibilities:

Topographic survey

Setting out for foundation, pedestal, anchor bolts and embedded plates.

Site preparation works including excavation for foundation.

Establish Horizontal and Vertical traverse.

Preparation of correspondence, work Inspection requested and other technical data required during the course of the construction.

Checking and reviewing of plans and shop drawings for design coordinates, elevation, etc.

Maintaining the tolerance of bolts and plates asper client during installation and concreting period. Precise surveying.

Perform the duties of a survey manager and chief surveyor.

Joint survey with consultant, and 3rd party surveyor for inspection before and after concrete.

Survey works, structural foundation, installing bolts and embedded plates, hand over structural foundation to mechanical team after all inspected concrete done and approved by consultant.

Structural areas i manage to handle Pile cap, Foundations, Pedestal with anchor bolts and base plate, Sub-station, UPVC pipes for cable pulling, GRE pipes, HDPE pipes, Oily manhole, Pull pit manhole.

PROJECTS HANDLED:

A: ( ABU DHABI, UAE )

1. EGA- Emirates Global Aluminum (ATA POWER AND STEAM INTEGRATION PROJECT) 2. Steam power plant

B: ( JEBEL ALI, UAE )

3. 600MW Jabel Ali Power Station K Phase - III for DEWA 4. Power Plant ( CIVIL WORKS )

Habtoor Leighton Group

P.O. box 10869, Umm Ramool, Airport road, Dubai, U.A.E. Position: Land Surveyor December 10 2015 – February 15, 2017 Duties & Responsibilities:

Topographic survey

Setting out for Road Diversion and tunnel points to start excavation.

Site preparation works including excavation for utilities.

Joint survey with the consultant in any changes or proposed revision in contract drawings.

Establish Horizontal and Vertical controls.

Maintaining weekly report & Daily report and submitted to Chief Surveyor and Construction Manager.

Preparation of correspondence, work Inspection requested and other technical data required during the course of the construction.

Checking and reviewing of plans and shop drawings for design coordinates, elevation, etc.

Create, manage and maintain project layout and construction data

Establish and maintain standardized machine control / survey models and construction survey data for project level operations

Perform calculations such as alignments, drainage, structures and roadway modeling PROJECTS HANDLED:

5. Road and Transportation Authority - Upgrade Junction at Airport Road ( Tunnel / Roads and Bridges Project )

Wade Adams Contracting LLC

14th – 15th flr Vision Tower Business Bay P.O. Box 4337 Dubai, UAE Position: Land Surveyor / Civil Supervisor June 12 2012 – Nov 20 2015 Duties & Responsibilities:

Supervise Construction Activities

Civil Supervisors familiarize themselves with all aspects of the project, from structural drawings to budgets to deadlines. They make sure all parties are doing what they are supposed to do, and they carry out visual inspections of work completed. If construction affects the activity of the general public, Civil Supervisors figure out adjustments, such as rerouting traffic. Solve Problems

From contract disputes to materials not arriving on time, Civil Supervisors handle situations as they arise to limit tensions and disruptions.

Maintain Safety and Legality

From start to finish, Civil Supervisors make sure the work being performed is structurally sound. They follow governmental regulations, address environmental issues and comply with local codes. When state and federal inspectors visit the site, Civil Supervisors may lead them around and answer questions.

Communicate

Civil Supervisors act as a liaison between groups, such as carpenters and pipefitters. They also may need to provide reports to project engineers and others who monitor progress or make changes to plans.

PROJECTS HANDLED:

1. Road And Transportation Authority - Jafza Flyover Sheikh Zayed Road DMCI PHILS.

Pasong tamo chino roces ave. Makati city phils.

Position: SURVEYOR April 1. 2007 – January 17, 2012 Duties & Responsibilities:

Traverse horizontal and vertical control points.

Setting out of bored pile location and asbuilt after drilling.

Setting out of pile cap and column.

Joint survey with the consultant in any changes or proposed revision in contract drawings.

Assigned in monitoring of girder fabrication to ensure as per plan design.

Joint survey with consultant for inspection of structures such as pile cap, column, and installation of girder.

Asbuilt elevation of girder after installation.

Maintaining weekly report & Daily report and submitted to Chief Surveyor and Construction Manager.

In-charge with the Implementation of Design Coordinate given by the Construction team.

Preparation of correspondence, work Inspection requested and other technical data required during the course of the construction.

Checking and reviewing of plans and shop drawings for design coordinates, elevation, etc. PROJECTS HANDLED:

2. SKYWAY STAGE 3 PROJECT (24 KM skyway- buendia ave to balintawak ave)( Tunnel and BRIDGE PROJECT )

To give the commuters easy access to connect from north expressway to south expressway. DMCI PHILS.

Pasong tamo chino roces ave. Makati city phils.

PROJECT HANDLED: Smelting & steel fabrication (batangas city) Position: SURVEYOR Nov 7 2009 – April 19 2012

Duties & Responsibilities:

Responsible for marking points, layouts of pile for pile cap foundation.

Asbuilt survey with sub- contructor after the structure done such as pile cap, columns, etc..

Assigned in checking of grid lines, control points and elevation to maintain zero tolerance for structures.

Joint survey with the consultant in any changes or proposed revision in contract drawing. DMCI PHILS.

PROJECT HANDLED: Solaire resort and hotel (macapagal ave near moa) Position: SURVEYOR April 13 2006 – june 17 2006

Duties & Responsibilities:

Establish grid line for structure reference.

Establish elevation.

In-charge with the implementation of design coordinates given by the construction team during the course of the construction.

Checking and reviewing of plans and shop drawings for design, coordinates, elevation, etc.

Maintaining weekly report & Daily report and submitted to Chief Surveyor and Construction Manager.

DMCI PHILS.

Pasong tamo chino roces ave. Makati city phils.

PROJECT HANDLED: Mrt line 3 ( Metro rail transit line 3) Position: SURVEYOR April 13 2006 – June 17 2006

Duties & Responsibilities:

Traverse horizontal and vertical control points.

Setting out of bored pile location and asbuilt after drilling.

Setting out of pile cap and column.

Joint survey with the consultant in any changes or proposed revision in contract drawings.

Assigned in monitoring of girder fabrication to ensure as per plan design.

Joint survey with consultant for inspection of structures such as pile cap, column, and installation of girder.

Asbuilt elevation of girder after installation.

Maintaining weekly report & Daily report and submitted to Chief Surveyor and Construction Manager.

In-charge with the Implementation of Design Coordinate given by the Construction team.

Preparation of correspondence, work Inspection requested and other technical data required during the course of the construction.

Checking and reviewing of plans and shop drawings for design coordinates, elevation, etc. DMCI PHILS.

Pasong tamo chino roces ave. Makati city phils.

Position: INSTRUMENT MAN Jan 10 2006 – April 2 2006 Duties & Responsibilities:

Topographic survey for contract bidding.

Establish control points.

Traverse control points and traverse elevation.

Submit accomplishment report for topographic to survey manager. TRANSOCEAN CONTAINER SERVICES INC.

1409 Federal tower dasmarinas st. binondo manila phils. Position: Document controller July 12 2003 – March 8 2005 Duties & Responsibilities:

Document controller/ Brokerage

Education

Bachelor of Science in Civil Engineering

2000 – 2003 ST JOHN TECHNOLOGICAL COLLEGE OF THE PHILS.

(UNDER GRADUATE)

Automotive Technology

1998 -2000 ST JOHN TECHNOLOGGICAL COLLEGE OF THE PHILS.

(GRADUATE)

Technical Skills

Familiarities of Instruments

Leica 1201/501 Builder (Total station – 1 second)

Leica Digital and Automatic level

Topcon 7002 and 7502 (Total station)

Topcon Digital and Automatic level

Leica TS15A1

Computer Literate

Microsoft office

Auto Cadd

Personal Information

Birth Date: March 08, 1981

Civil Status: Married

Citizenship: Filipino

Religion: Christian

Sex: Male

Attributes: Highly motivated to work on large scale project and able to work independently as well as in a team.

Passport No.: EC4570114

References:

EDILBERTO CINCO Survey Manager

Mobile No.: +971 056-***-****/ +971 052-***-****



Contact this candidate