SANKAR BISWAS

Ayodhyanagar, Berhampore, Murshidabad, 742101, West Bengal.

E-mail: adj56y@r.postjobfree.com

Mob. No. 073******** & 821*******

Objective:

Seeking Senior Mid-Level Assignments in Project Management with a reputed organization. Hands - on expertise in heading overall project activities right from the Conceptualization stage to the execution and close-out on time within Budget.

Professional Outlook:

i) 10 years of experience in full life circle of EPC project. Especially in the power project of Government Utility Sector.

ii) Experienced in Project Estimation, Cost Monitoring within Project schedule, delay analysis and PV calculation.

iii) Proven ability to complete projects according to outlined scope, budget, and timeline. iv) Manages all project(s) for annual gross revenue financial results, client satisfaction, safety and quality.

v) Proven leadership role in stakeholder management, Risk analysis, staff management, workload distribution and identifying resource and training requirements. Qualification:

i) B.TECH in ELECTRICAL Engineering from CIEM (WBUT), 2010. ii) Diploma in Electrical Engineering from WBSCTE, 2007. Core Competencies:

Project Management, Project Planning & Coordination, Expert in Project Monitoring. Business Handled:

i) 33/11 KV Electrical Substation with Associated Civil Control room Building, Switchyard Construction.

ii) High Way project, Rural Electrification, R-APDRP, BRGF, DDUGJY, IPDS & High rise building project.

iii) HT/LT Distribution Line.

iv) UG cable & ABC cable Laying project.

v) Industrial indoor Sub-Station & appliance erection. vi) Generator installation 1.5 MVA.

vii) UPS & Firefighting equipment installation.

viii) Different type of earthing system erection.

ix) Material final reconciliation, final billing and project closing. Current Company:

Energo Engineering Projects Ltd. In Liquidation. (Aurangabad, Bihar), Duration – Mar’2020 to till date. Designation: Deputy Project Manager. (Planning and Coordination), Project - Reporting Directly to CFO.

Projects:

Rural Electrification project (BRGF) in Aurangabad and Gaya District. of SBPDCL, Bihar. Responsibilities and duties includes:

i) Determine and define project scope and objectives. ii) Predict resources needed to reach objectives and manage resources in efficient manner. iii) Track project costs in order to meet budget.

iv) Develop and manage a detailed project schedule and work plan. v) Direct contractors, sub-contractors and vendors to follow WBS Plan. vi) Monitor progress and make adjustments as needed. vii) Measure project performance to identify areas for improvement. viii) Overall control on Project Insurance, Safety and Quality Control and client and customer satisfaction.

Company:

J K Engineering Pvt. Ltd, Duration – March 2019 to March 2020.Designation: Assistant Manager

(Electrical). (Planning and Coordination), Reporting Directly to MD. Projects:

High Way Construction Project in Kolkata and Hooghly district of WBHDCL, PWD and WBSEDCL in West Bengal.

Job Profile –

i) Follow up survey, Estimate, Drawing, Erection work execution. ii) Co-ordinate with client and HO and sub- contractor as an electrical project head. iii) Billing, Material reconciliation and project closing. Responsibilities:-

i) 33 kv & 11 kv OH & UG line & LT OH line.

ii) DTR installation 63kva to 800Kva.

iii) Measurement, Final drawing, Approval & Billing. Achievement:

Project closing and taking closing certificate from WBSEDCL. Company:

Tata Project Limited, Duration – November 2017 to March 2019.Designation - Senior Engineer Electrical (Erection work execution and follow up with PMA, Client), reporting: Deputy Project Manager.

Projects:

IPDS Project in Aurangabad and Gaya District. of SBPDCL, Bihar. Job Profile:

Look after Survey, Hand sketch drawing, Material Estimate, Erection Work execution, Measurement, JMC with PMA & Client, HO & TO, Material reconciliation with contractor & billing. Responsibilities:

i) 33 kv & 11 kv OH & UG line, LT OH line by Conductor & AB Cable. ii) 33 kv line railway line crossing.

iii) 33/11 kv sub-station switchyard and Control room erection work. iv) DTR installation 63 kva to 200 kva.

v) Solar unit installation.

Company:

Sree Gopikrishna Infrastructure Pvt.Ltd. Duration– April 2016 to November 2017, Designation – Asst. Engineer Electrical (Erection work execution and follow up with PMA, Client). Reporting: Senior Engineer.

Projects:

DDUGJY Project in Ranchi District of JBVNL in Jharkhand. Job Profile:

Manually Survey, Hand sketch drawing, Material Estimate, Erection Work execution, Measurement, JMC with PMA & Client, HO & TO, Material reconciliation with contractor. Responsibilities:

i) Survey HT & LT line & preparation hand sketch drawing with material estimate and given to senior engineer for AutoCAD drawing and then visit client office for approval. ii) HT & LT OH line with BPL meter connection.

iii) Measurement & JMC with client and HO-TO.

iv) DTR installation 63 KVA.

Company:

EMC Ltd. Duration – September 2012 to March 2016, Designation – Assistant Engineer Electrical

(Planning and Coordination), Reporting: Manager Electrical (HO). Projects:

R-A PDRP Project in North & South Dinajpur District of WBSEDCL in West Bengal. Job Profile:

Survey, Hand sketch drawing, Material Estimation, BOQ & Drawing Approval, Co-ordinate with HO, Client & Contractor, Follow up erection work, Supply & Erection billing, and Project completion. Responsibilities:

i) HT UG & OH line and LT OH line by Conductor & AB Cable, Domestic meter fixing. ii) 33/11 kv sub-station augmentation and extension. iii) DTR installation 25 kva to 100 kva.

Achievement:

Project closing, material reconciliation, final billing and project closing. Company:

Hi-Tech Engineers and Consultant, Duration – August 2010 to September 2012, Designation – Site Engineer Electrical (Erection work execution), Reporting: Site Senior Engineer. Projects:

High Rise Building Project in Gurgaon of DLF in Delhi NCR. Job Profile-

Installation work execution, Measurement and reporting to Senior. Responsibilities:

i) HT UG Cable line.

ii) Indoor captive power plant.

iii) Indoor Dry type 1.5 MVA PTR erection.

iv) Motor installation 100 HP.

v) Electrical work in Pump house, Firefighting, Fan room, Machine room. vi) Wiring (Resident Room, Lobby, Satire case, Lift, Entrance Hall, Street Light, High mast tower, Park, Club).

vii) Different type of earthing.

Professional Tanning Attended:

i) Training at Thermal Power Plant: - Damodar ValleyCorporation. ii) Training at Non-Conventional Power Source (Solar & Wind). Personal Details:

i) Male, Married, Age: 41 years+, Date of Birth-11th. July,1978. ii) Live in Berhampore with Wife (House Wife) & Son ( 2.5 Year old) iii) Interested in games and music.

IV) Passport No. S8893015

Declaration

I hereby declare that the above written particulars are true to the best of my knowledge & brief. Date:-

Place: - (SANKAR BISWAS)



Contact this candidate