Post Job Free
Sign in

Piping Design Engineer

Location:
Philippines
Posted:
February 13, 2021

Contact this candidate

Resume:

CURRICULUM VITAE

Name : Edgard R. Abanto

Position : Mechanical-Piping Construction Supervisor/Design Engineer

/Workpack Checker/SP3D Piping Checker/Field Engineer

Nationality : Filipino

Date of Birth : May 31, 1966

Status : Married

Qualifications : Bachelor of Science in Mechanical Engineering

Languages : English - Tagalog – Bahasa Melayu

Home address : Unichem Road

Aplaya Bauan Batangas

Philippines 4201

Telephone : +673******* (Brunei)

: +63-43-727**** (Philippines)

Email Address : **********@*****.***

Passport No. : P6482846A

Date Expired : 29 March 2028

Training Attended:

Housekeeping and Safety Environment / Offshore Safety and Survival Course / Helicopter Underwater Escape Training / PDS Intergraph (Version 6.3) / Microstation –J / H2S Breathing Apparatus / AutoCAD 2000i / 2010 / MSWord/ Excel / Auto Iso / Wise Image 5.0 Life for AutoCAD 2000i / Autoplant P & ID / PDMS (Version 11.6) / Navis works / Emergency Breathing System (EBS) / Competent Frontline Work Site Supervisor (IMS-5) and Integrated Safe System of Work (ISSOW). Integraph Smart Plant Review (SPR), 3D Navigator and SPM. International Minimum Industry Safety Training (IMIST), Work Management Procedures (WMP), Senior First Aider, Supervising for Safety (SFS), Permit Vision (PV).

SUMMARY EXPERIENCE:

30+ years of continuous working experience in Oil and Gas profession. Experience involved in the construction and engineering design of Greenfield and numerous Brownfield upstream and downstream projects. Gained enough experience in various engineering functions from Front End Engineering & Design (FEED) with major emphasis in executing Engineering Detailed Design, Construction (Mechanical/Piping/Structural) and utilizing relevant piping software.

Produce the various discipline deliverables to the agreed schedule. Apply recognised onshore and offshore engineering practices applicable to piping design and topside/plant layout. Experience involved in Brunei Shell Petroleum (BSP), TOTAL E & P Borneo BV (TEPB) onshore / offshore projects and other several projects in Doha Qatar and Abu Dhabi UAE.

Experienced in PDS, PDMS (Equipment/Piping Modelling) AutoCAD or manual design drafting method, also basically responsible for the preparation of project drawings such as: Plot Plan, Equipment Location Plan, Vendor Drawing, Piping Arrangement Drawings, Pipe Support Drawings, Line List, Tie-in List, Isometric perspective and material take-off, and fabrication detailed drawings in every project and to ensure comply with the client approved design standards to provide quality design.

Check and back check a maximum weekly workpack deliverables for the Offshore/Onshore Reliability Maintenance and Constructions (ORMC/LRMC) project.

Taking all responsibility for the construction to execute all activities in a safe and efficient manner in compliance with applicable safety instructions and Company procedures taking responsibility for both own and colleagues' safety.

PROFESSIONAL EXPERIENCES:

February 25, 2020 to present (LRMC Project)

Sr. Piping Designer/Workpack Checker

Serikandi Oilfield Services Sdn Bhd

Block 4, 9-A, Industrial Complex, Kuala Belait

Brunei Darussalam, KA 1931

Duties and Responsibilities:

Create and respond to technical queries.

Carry out site surveys Land Reliability Maintenance and Construction (LRMC) where required gathering detailed survey information as per anomaly in Computerized Inspection Reporting Retrieval and Analysis System (CIRRAS) reports and generate reports as required.

Draught & check detailed design drawings of piping systems & supports in accordance with Brunei Shell Petroleum standards, codes and client specifications.

Prepare & check materials take-offs (MTO) for SAP input.

Provide technical input during detailed phase, with an emphasis on constructability of the design.

Provide support and input into the preparation of PEFS/UEFS technical files, construction workpacks and certification documentation.

Responsible for technical decision making associated with any given scope of work.

Establish good working relationships and communication with discipline leads, department managers, clients and subcontractors at all levels, dealing with any dispute or conflict in a professional and personable manner.

November 14, 2018 to December 05, 2019

Construction Supervisor (Offshore Based)

Adinin Works & Engineering Sdn Bhd

Brunei Darussalam, KA3131

Duties and Responsibilities:

Oversee the daily construction activities at vessel workshop fabrication and work site, supervision and co-ordination of the assigned modifications (including but not limited to scope, manpower, planning, overall cost, communication, reporting, work preparation, execution, close-out, etc.) including scheduling of workers, delivery of equipment and materials, and progress of the project shutdown if any in part of the campaign.

Ensure that that construction contractors working within the discipline adhere strictly to the latest Approved for Construction (AFC) project drawings, Specifications, ITP’s, Procedures and Site Instructions.

Ensures excellent communication with the Construction Superintendent on site in order to consolidate work program, methods, planning, production & HSE supervision and production tasks like spading, preparation of activities for access to installation and safe guarding.

Maintain good quality of all mechanical/piping and structural work in accordance with the standard as in the design documents and to be flexible but also strict when required in order to achieve the objectives of the modifications of the scope of works (SOWs)

Manage to ensure start date for up front construction activity in advance with preparatory works without fail. Ie; Pressurized Habitats/Scaffoldings /Isolations Points, etc, are readily in place.

High focus on ensuring that all aspects of the pre-fabrications and installation and reinstatement activity is performed safely.

Implement instructions; defines responsibilities and boundaries to all entities performing works during the campaign period.

Participate in site day to day progress meeting report, safety audits regarding work execution, permits, work site standards and workforce knowledge of the work.

Strive for the safest and most effective solutions with the offshore Contractors and prevent arbitration.

Has the authority to reject or accept scope variations in consultation with Construction/Field Engineer in case of QHSE concerns.

January 15 2018 to November 10 2018

2D Piping Support Checker

Mitsubishi Technical Services Corporation - Philippines

Project Involved: Hitachinaka and OK1B Power Plant

Duties and Responsibilities:

Examined and validated piping drawings and layout plans for quality and compliance.

Liaised with designers and resolved various design errors, in an effective manner.

Used SPM and 3D Navigator software and completed all tasks, efficiently.

Interpreted and complied with piping design standards and specifications.

Built and maintained positive relationships with coworkers and engineering department personnel.

Ensured personal safety and complied with occupational health & safety practices.

Contribute to the development of engineering staff.

Attended and participated in meetings with teams as required.

August 2017 to December 2017

Field Piping Supervisor

Rey-Tech Construction & Development Corporation

Bauan Batangas, Philippines 4201

Duties and Responsibilities:

Maintained the company quality system that conforms to international standard code.

Provide expertise in the area of mechanical & piping activities during project execution covering design.

Coordination with the authorities/professionals involved in the project such as project engineer (PE), consultant and clients.

Provides assistance to the Safety Manager and safety coordinators to ensure a safe work site, and attends safety meetings with the contractors.

Determines manpower requirements and coordinates construction plans prepared for the area as per schedule.

Review of P&ID/PEFS prior for tie-in to existing process line.

Review of drawing & designs for piping and mechanical prior for fabrication and installations.

Perform piping Line Checking and prepare punch list.

Prepare progress report of punch cleared test packages for hydrotesting.

January 2016 to June 31, 2017

SP3D/Piping Checker

Mitsubishi Heavy Industries Engineering & Services, Private Ltd, Asia Pacific - Philippines

Project Involved: Tobago & Trinidad Methanol and Dimethyl Ether Plant

Duties and Responsibilities:

Built and maintained positive relationships with co-workers and engineering department personnel.

Monitored and maintained all aspects of piping system design, efficiently.

Examined and evaluated all drawing packages for quality compliance.

Interpreted and complied with piping design standards and specifications.

Used Smart Review (SPR) software for checking drawings, efficiently.

Reviewed and altered design documents to meet established piping standards.

Liaised with designers and resolved various design errors, in an effective manner.

Contribute to the development of engineering staff.

2013 November - November-2015

Worksite Supervisor/Workpack Checker

Petrokon Utama Sdn Bhd – Brunei Darussalam

Duties and Responsibilities:

Prepare and raise work permit in offshore east and west locations.

Review/check documents and drawings produced by the group and ensure that single and inter-discipline checks are carried out in accordance with relevant Codes, Standards and Procedures.

Ensure all aspects of the Statement of Requirement (SOR) and Scope of Work (SOW) are addressed within the workpack as per received Work Order Number (WON).

Ensure all design drawings and documents are completed within the allocated hours and in accordance with the programmed.

Provide technical input during design phase, with an emphasis on constructability of the design.

Provide technical, ethical, professional leadership, support and mentoring within the discipline team.

Interfacing with Offshore Construction Team to ensure all items required for construction readiness are clearly identified within the workpack.

Apply experience and professional knowledge to provide solutions.

Carry out site surveys Offshore Reliability Maintenance and Construction (ORMC) where required gathering detailed survey information as per anomaly in Computerized Inspection Reporting Retrieval and Analysis System (CIRRAS) reports and generate reports as required.

2004 September - 2013 October

Sr. Piping Designer/Checker

Damit WorleyParsons Sdn Bhd – Brunei Darussalam

Duties and Responsibilities:

Gathers information from all sources required including other disciplines, vendors, engineers, reference drawings and catalogues to produce complete, functional and constructible design packages. Construct scenarios from various information sources to develop details and follow through with solid workable solutions for design problems and to ensure comply with the client approved design standards to provide quality design.

Responsible for the preparation of all piping general arrangement for shutdown and non-shutdown conceptual phase for the Inland Gas Tungku Gas Plant (IGTP) project.

Assigned checker in Champion Waterflood Project – Brownfield A2 Phase. Responsible for the checking of Advance Tie-Ins, Demolition, and Offshore Works packages based on the site survey report and as received 3D model from the client. Prepare and issue inter discipline squad check and bill of material (BOM) for SAP input. Carry out all offshore field survey for the verification of project scope of works.

Produce detailed design packages as per Engineering Technical Services Request (ETSR) that are required for the installation, hook-up and commissioning of PIMS West 2004 Pigging Facilities Modifications project. Coordinate or make jobsite visits, as required, to resolve problems and interpret drawings and documents from the existing facilities to new facilities piping routing study drawings and material quantity take-off and as-built drawings. Perform pre-job walks, field walk-downs, field routing of pipes for new Dual Strings Gas Lifted Well (RS-43) at Rasau Wellhead Facilities.

Produced detailed design packages in Brunei Liquefied Natural Gas Sdn Bhd (BLNG). Following projects were involved: Marine Flare Line and Vapour Return Line like for like replacement, Valves Replacement for Train-1 to Train-5, Instrument and Tool Air Line Replacement and 13 and 14 Cell Cooling Water Return Header Replacement.

Produced detailed design packages in TOTAL E & P Borneo BV (TEPB). Following projects were involved: MLJ107 Well Connection Project, MLJ2 Well Tie-In Project, OPP Flash Gas Recovery and As-Built.

Checking all piping general arrangement drawings and sections as per site information for Ampa-Fairley (FAGP-04) platform. Check, back check of AFC and post AFC submit packages of AMDP-25, AMWJ-26, GADP-01 and FACP-04.

Review and check calculations, design models, drawings and design documents prepared by assigned designers or drafters for quality, accuracy, neatness, functionality, and satisfactory completion for a reliable/safe plant operation and construction economy.

Carry out all offshore field survey in numerous platforms in west Ampa-Fairley facilities for the verification of piping general arrangement, Plot Plan and PEFS/UEFS project As-built and general As-built. Check all Review As-Built (RAB) and Issue As-Built deliverable package.

Prepare and issue inter discipline squad check of all key drawings i.e. Plot Plan, Piping General Arrangement, 2D Piping Isometrics and all removal drawings. Prepare bill of material (BOM) for SAP input.

Attend and participate in departmental and project meetings.

2004 May - 2004 August

Sr. Piping Designer

Worley Qatar WLL (Seconded to Worley Arabia Co. LTD – Abu Dhabi, UAE)

Duties and Responsibilities:

Involve in various detailed design and drafting of all piping in oil and gas project particularly in Zakum West Super complex.

Assisted design Engineer to gather necessary information from existing drawing needed in the project.

Conducts offshore field verification and site surveys of the project sites prior to commencing design work. Liaisons with offshore operation and maintenance staff to gather information and data relevant to the project.

Design piping and new equipment installations to fit for quick turnaround installations in existing facilities.

Prepare isometric drawings for piping including material take-off.

Responsible for locating support points on piping arrangement drawings and prepare support style to be used according to standard.

Duties also included checking and back checking of drawings.

2003 January - 2004 April

Sr. Piping Designer

Worley Qatar WLL

Duties and Responsibilities:

Performs manual / computer layouts using specifications, standard drawings, instructions plot plans, line list and supplier information.

Develops detailed design project piping models. Prepare piping drawings, isometrics, stress and material sketches. Check, back check, general arrangement drawings and isometric.

Design piping and new equipment installations to fit for quick turnaround installations in existing facilities.

Prepare isometric drawings for piping including material take-off.

Communicates and interfaces with other project design and engineering disciplines.

2001 December - 2002 December

Sr. Piping Designer

Worley Qatar WLL (Seconded to Maersk Oil Qatar As)

Duties and Responsibilities:

Responsible for the preparation of Piping Drawings: Plot Plan, Equipment Location Plan, Piping Arrangement Drawings, Pipe Support Drawings, and utilizing manual or AUTOCADD drafting methods.

Perform site visit to determine interference of new pipe routing with other trades.

Conduct field measurement of existing equipment and piping assemblies for the project scope modification.

Prepare isometric drawings for piping including material take-off.

Communicates and interfaces with other project design and engineering disciplines.

2001 April - 2001 October

Sr. Piping Designer

Fluor Daniel Inc. Philippines

Duties and Responsibilities:

Perform manual / computer layouts using specifications standard drawings, design instruction, plot plans, flow diagrams, and line list and supplier information.

Develop detail design project piping models.

Prepare piping drawings, isometrics, and material take-off.

Performs checking of piping isometrics using Smart Plant Review (SPR),review the completeness of the Piping being checked as per as per client Piping material specifications, standard drawings, design instructions, plot plans, flow diagrams, line list and supplier information.

Check, back check and correct assigned piping models, drawings, and isometrics.

Communicates and interfaces with other project design and engineering disciplines.

Update master flow diagrams provides corresponding isometrics breaks as checking progress using Yellow-off & Pink off activity.

July 24, 2000 - January 31, 2001

Piping Engineer

Sime Sembcorp Engineering Sdn Bhd - Malaysia

Duties and Responsibilities:

Responsible in the preparation of comprehensive piping overall MTO for costing purposes.

Prepare piping isometric sketches & layout to capture material requirements as per schematic drawings.

Analysed contract documents technicalities to determine client / contractor scope of work.

Study technical clarification from client for any material impact.

Prepare & transmittal letter of communications to Proposal Manager.

Job Undertaken: Bidding exercised for various projects:

Helang Central Platform and topsides resak compression module.

E11-RC Riser Platform

BR-A CPP for Lundin Malaysia Ltd.

MPF for Chevron Offshore (Thailand)

1999 October - 1999 November

Sr. Piping Designer

Kvaerner R.J Brown Pte Ltd - Singapore

Duties and Responsibilities:

Assisted and coordinated with the supervisor and design engineer with the ongoing RHOUNE POULANC PHARMACEUTICAL PROJECT.

Conduct field surveys for the preparation of working drawings.

Prepare piping isometric drawings for as-built works, revisions and tie-in installations.

February 8, 1999 - August 8, 1999

Sr. Piping Designer

Fluor Daniel Inc. Philippines

Duties and Responsibilities:

Perform manual / computer layouts using specifications standard drawings, design instruction, plot plans, flow diagrams, and line list and supplier information.

Develop detail design project piping models.

Prepare piping drawings, isometrics, and material take-off.

Performs checking of piping isometrics using Smart Plant Review (SPR),review the completeness of the Piping being checked as per as per client Piping material specifications, standard drawings, design instructions, plot plans, flow diagrams, line list and supplier information.

Check, back check and correct assigned piping models, drawings, and isometrics.

Communicates and interfaces with other project design and engineering disciplines.

Update master flow diagrams provides corresponding isometrics breaks as checking progress using Yellow-off & Pink off activity.

November 20, 1996 - November 20, 1998

Designer Mechanical/Piping

Technip Engineering Brunei – Brunei Darussalam

Duties and Responsibilities:

Involve in various detailed design, site survey (onshore / offshore) and drafting of all mechanical / piping in oil and gas project, particularly in Champion-7 and Seria Crude Oil Terminal (SCOT).

Prepare isometric drawings for piping including material take-off for as-built works, revisions and well tie-in installations.

Duties also included checking and back checking of drawings.

Assisted design engineer to gather necessary information and existing drawings needed in the project.

Following projects were involved:

Champion-7 Diesel fuel supply system upgrade

Champion-7 Fuel gas supply system upgrade

Champion-7 G-110 pipework refurbishment

Champion-7 Das replacement project

Champion-7 PEFS update, audit action item

Simplification of engineering flow schemes

PGWJ-1, Gas well tie-in (Peragam 3)

Condensate stabilization plant as-built / data verification

Seria crude oil terminal tie-ins

Rasau production station / NGCP (as built)

January 11, 1996 - August 9, 1996

Piping Designer

Oil Line Engineering & Associates Sdn Bhd – Malaysia

Duties and Responsibilities:

Coordinates with the Piping section head regarding the piping specification, piping standard and other data references needed in the project.

Coordinate with the Structural design engineer regarding the project scope of existing and new structure for the routing of all new piping system.

Responsible for the preparation of plan details, elevations, sections and isometric drawings for the draftsman / cad operator.

January 9, 1995 - January 5, 1996

Piping Designer / Draftsman

Sanko Engineering Corporation - Philippines

Duties and Responsibilities:

Coordinate with the supervisor and senior piping engineer regarding the project specifications, piping standard drawing and other data preferences for the completion of all engineering working drawing.

Prepare engineering working drawings such as piping arrangement drawings, isometric drawing including material take-off, sections and details for more detail presentation layout.

Secondary design work.

Prepared the necessary shop drawings and details for proper fabrication process and formulates / issue guidelines and fabrication procedures requiring revision and or as-built drawing.

Responsible for locating support points on piping arrangement drawings and prepare a support style to be used according to standard.

February 25, 1994 - December 17, 1994

Line Checker Supervisor

P.T. Nippon Steel Construction Indonesia (P.T. Nisconi) - Indonesia

Duties and Responsibilities:

Prepare the test block wise monthly schedule to fulfil the detailed schedule.

Conduct line check.

Confirm the completion of the remaining works and inform status to the test prepare group.

Perform all other required on field assignment.

June 15, 1993 - February 24, 1994

Mechanical / Piping Draftsman

Sanko Engineering Corporation - Philippines

Duties and Responsibilities:

Coordinate with the Supervisor and Senior Piping Engineer / Designer regarding the piping specification.

Secondary design work.

Gathered project data references needed for the completion of all engineering drawings.

Check isometric drawings regarding the indication of joints (welded and screwed) dia-inch computation and exact location of pipe supports as per layout drawings.

September 1, 1990 - July 30, 1993

Piping Draftsman

Babcock Hitachi Philippines - Philippines

Duties and Responsibilities:

Coordinate with the Senior Engineer for the preparation of all engineering working drawings needed for the construction.

Gathered project data references needed for the completion of all engineering drawings.

Secondary design work. Prepare isometric drawings, as built drawings and revising including material take-off.

Handle all drafting works from preliminary to shop fabrication drawings.

Provide assistance to fabrication foreman in cutting layout and fit-ups.

May 16, 1987 - August 30, 1990

Piping Draftsman

Petrochemical Consultant Inc. - Philippines

Duties and Responsibilities:

Coordinate with the costumer engineers and gathered project data references for the completion of engineering working drawings to conform to the customer requirements and international approved and standards.

Prepare engineering working drawings such as isometric drawing and as-built drawings including material take-off.

Conduct field survey for checking and discrepancy of the isometric drawing to actual fabrication.



Contact this candidate