Post Job Free

Resume

Sign in

Electrical Engineer Project

Location:
Qibla, Kuwait City, Kuwait
Salary:
850 KD
Posted:
February 12, 2021

Contact this candidate

Resume:

A seasoned Electrical over **+years of experiences in managing E&I work of Refinary, Power Plants, Sub-Stations, Sulphur conveyer & Shiploader. Having solid experience in Electrical, Insrumentation & Fire and gas device installation, cable activity, waikdown per-subsystems wise, ITR_A closing & punch closing assignments with an organization of repute in construction industry.

PROFESSIONAL SUMMARY:-

My experience is involved in, construction installation, testing, and related work on Electrical & Instruments in major construction projects. Conduct toolbox meeting as per IIF (Incident & Injury Free Safe work) for worker to aware of hazards and Safety. Initiate permit to work system for all activity. Execute Lockout/Tag out System as per Procedure. Working as an Isolating authority. Attend to all Technical coordination meeting for Plan review so as to verify and check the correctness of the plan to provide a logical and orderly approach in checking drawing and specification thereby locating and eliminating coordination problems among such disciplines as Architectural, Civil, Mechanical, and Fire Protection Installation of Instruments, fire & gas equipments, Trays & Supports, Conduits, EarthPits, Light poles and Lightning protection. Systematically planned and executed Industrial and Domestic Wiring, Lighting systems. Laying for Cables (MV/LV In trenches/trays) Glanding &Termination, Cable jointing, Grounding, Design and fabricate stanchion for instruments and varies type of supports for trays and conduits. Design & Marking for Earth Cable Routing and laying for all around Substation/Buildings.Installation of Transformers(MV/LV),SwitchGears,MCC,EMCC,Instrument Panel,Telecom Panel,UPS(AC/DC) &Batteries, VFD, Electrical Distribution Boards, FACP,SCADA Panels, AHU & conveyor motors, Junction boxes etc. for Electrical and Instrumentation.

Coordinate the mechanical completion (Punch list, Loop checking, Continuity checking, Megger test, Torqueing).Coordinate and Witness the pre-Commissioning tests of Transformer, Switch Gears, MCC, and IR test and Hi-Pot test for power cables and Bus bars, Functional test for AC/DC UPS etc. Competent at formulating operating budjets and managing overall operation for executing the designing projects within cost & time norms. .

AREAS OF EXPERTISE:-

Safety Meetings and Tool Box Talks,Prepare JSA,Ensure contractors carry out tool box talks on electrical safety and permit to work requirements and ensuring safe environment in working area.

Applies the necessary measures to ensure that projects, program, quality, specifications, HSE and integrity are all in place, monitored and controlled.

Reviews and plans future project activities considering tools, equipments, recourses, material and availability of drawings.

Develop, schedule the sequence of works to meet project budget and completion dates, Correct interpretation of the drawings, providing support in the solution of technical problems.

Schedules and supervises day to day project activities to ensure the proper utilization of manpower and materials.

Measure the progress of the works carried out and ensure the continuous assessment of the quantities installed.

Monitoring and supervising large work force in MV/LV Cable laying.(Underground and,Road crossing,Protection &Back filling,Cable drum storage & handling)

Co-ordinate works with the other supervisors, contractors and sub-contractors on a daily basis to minimize interference.

Prepare and submit daily report, highlighting any engineering problems encountered in the field, Monitoring the employed manpower, quantity of job completed and indicate the needs and surpluse.Monitoring and supervising large work force in a fast track project environment.

In-depth understanding of Electrical drawings.

Classifying hazardous areas.

Installation of Instruments and supports.

Identify the location of Instruments with P&ID.

Computer Proficiency in MS Word and internet application.

CLIENT AND CONSULTANT WORKED WITH

1 Sheraton Hotel Refurbishment, OMAN

2 Public Authority of Social Insurance (PASI), OMAN

3 Sohar Refinery Improvement Project (SRIP), OMAN

4 Warehouse Project(FDH) in KNPC,KUWAIT

5 Substation Project in KOC, KUWAIT

6 Crude Oil Control Centre (COCC) Project in KOC, KUWAIT.

7 DAELIM-PETROFAC SRIP PROJECT JOINT VENTURE.

8 WORLEY PARSON, KUWAIT.

9 Hyundai E&C / Eiffage / SK E&C Joint Venture, Mina Al-Zour, Kuwait

ORGANIZATIONAL EXPERIENCE:-

Hyundai E&C / Eiffage / SK E&C Joint Venture (HSS Jv) Mina Al-Zour, Kuwait

*Sulphur conveyer & Shiploader project Pkg. #5

Role:-E & I Supervisor ( 2019 to Till the date )

WorkOutline:- Supervise and control of Electrical,Instrumentation & Fire & Gas activities for Sulphur conveyer & Shiploader. Instalation of Electrical Instrumentation & Telecom panels Erection and Fabrication of all type Cable trays & Trunkings, Cable layings, Glanding & Termination of instrument cabinets, Sub-DB’S, sockets, Lighting DB’S & fixtures, Fire & Gas equipments, Instrument equipments, HV & LV Motors & all equipments control cables etc…..

Responsibilities:- Cordinate the inspection materials to assure the specification, standard and made. Cordinate with QA QC Engineers to raise RFI for the inspection of all the installation.Preparation of all ITR_A documents & submit PMC. Making MRS & Tracking. Schedule scope of works. Obtain work permits. Prepare daily time sheet and progress report.

Naser AL Baddah & Partner(NBTC),Kuwait.

*Crude Oil Control Centre (COCC) Project in KOC,Ahmadi.

*Substation Project. KOC,Ahmadi.

Role:-Work Site Supervisor (2017 to 2019)

WorkOutline:- Supervise and control of Electrical activities for Substation/Control stations. (Instalation of Electrical,Instrument & Telecom panels,Erection and Fabrication of all type Cable trays & Trunkings, Cable laying, Glanding & Termination of power, Lighting & control cables,Fabrication and erection of stanchion for panels enclosures and junction boxes, Installation of earth pits, busbars, Earth cable laying & termination, installation of lightning protection systems,Erection of light poles, Loop checking, Continuity checking,and Meggering etc.Prepare and clearance of punch list).

Responsibilities:- Preparation of daily report. Conduct tool box talk. Arange materials and equipment. Prepare daily time sheet and progress report. Schedule scope of work.Obtain work permits .Regularly attending meeting with contractors/clients to meet the goal of projects. Responsible for carry out RFI’S/ Handover walk down with contractors/clients.

Bhawan Engineering Company (BEC),OMAN

*Sohar Refinary Improvement Project (SRIP).Sohar.

*Public Authority of Social Insurance (PASI) Project, Muscat.

*Sheraton Hotel Refurblishment Project, Ruwi.

Role:-Electrical Supervisor (June2014 to Jan2017)

WorkOutline:- Supervise the sub-contractors for the installation of LV distribution systems(MCC,EMCC,UPS(AC/DC)panels & Batteries,MCB,SMDB,FAP,SCADA and all Electrical Distribution boards). Instalation of light fittings,Fire alarm systems, LV Cable layings. Erection of street light poles,installation of lights and termination of cables and testing of lights.

Responsibilities:- Cordinate the inspection materials to assure the specification, standard and made. Cordinate with QA QC Engineers of the client to raise RFI for the inspection of all the installation.Supervise the installation and commissioning activities. Material Tracking. Schedule scope of work. Obtain work permits. Prepare daily time sheet and progress report.

Shrikhande Consultants PVT LTD,Mumbai,INDIA.

Role:- Electrical Engineer (Mar2014 to June2014)

*Guest House Project, IIT Powai, Mumbai, INDIA.

Kelvolt India PVT LTD, Mumbai,INDIA.

*Siddi Vinayak cement factory project. Rajastan, INDIA.

Role:- Electrical Engineer (Feb2013 to Feb2014)

WorkOutline:- Supervise, Instalation “C”channel support & cable tray fabrication & installation. MV/LV cable laying, Glanding & Termination. LV panel installation. Meggering, Continuity checking etc…Tagging and all punch list clearance.

Pravin Electricals PVT LTD.mumbai,INDIA.

*India Bulls Commercial Project

*KDA Hospital (reliance) Project.

*ICIC Lombard Data Centre Project.

*Lodha Residentials Project.

*HN Hospital (reliance) Project.

Role:- Electrical Site Engineer.(Jan2010 to Feb2013)

WorkOutline:- Instalation of LV Panels, cable trays, low current(Data) trunking installation, power wiring, LV cable laying Glanding & Termination, Light fixtures installation,LV cable laying fire alarm devices installation, Battery Rack installation, Battery Termination etc…

Blue Star contractor PVT LTD, Delhi,INDIA.

Role:- Electrical Maintainance Supervisor (July2007 to Dec2009)

WorkOutline:- Maintaining control &checking of the Electrical Panels and AHU.(Maintainance of Electrical Brakers. cleaning & daily checking of Air Handling unit,FCU,lighting and Grounding systems.

Responsibilities:- Conduct toolbox talk, Arrange materials and equipment, Prepare daily time sheet and progress report, Attend weekly meeting with Superiors.

EDUCATIONAL QUALIFICATION:-

Diploma in Electrical & Electronics Engineering (EEE) 2004 to 2007.

Permanent Address:-

Karathamankal (H), Narakathani p.o, Vennikulam, Thiruvalla,

Pattanamtitta DIST, Kerala, India.689586.

Present Address:-

21/6, Building-335, Street-136, Block-1, Mahboula, Kuwait, 400051.

PERSONAL DETAILS:-

Date of Birth : 27th sep: 1984

Place of Birth : Kerala, India

Religion : Christian

Passport No : P 4439229

Place of issue : Thiruvananthapuram

Date of issue : 06/02/2017

Date of expiry : 05/02/2027

Languages : English,Hindi,Malayalam,Tamil

Driving License : Indian

DATE:02/02/2021 JOBIN.K.OOMMEN

Tel:-

JOBIN.K.OOMMEN

Tel: +965-********, 98966456

Email: adj423@r.postjobfree.com



Contact this candidate