Post Job Free
Sign in

Engineer Power Plant

Location:
Iraq
Posted:
February 11, 2021

Contact this candidate

Resume:

From To

**** ****

**** ****

From

****

****

Full Name Mohammed Abdul Ameer Hussein

Proficiency

Being a highly motivated, adaptable, innovative and a civil engineer with Leadership skills, I seek to utilize my skills by working for a leading organization where I can gain more practical and professional experience.

Passport No. & Exp. Date

Surveying

Team working skills

Good knowledge of building methods and regulations AutoCAD (2015), with sound knowledge of 2D.

Married

Iraq – Erbil – New Eskan apartments

adj3wa@r.postjobfree.com, adj3wa@r.postjobfree.com

Iraq : +964********** ( Viber & WhatsApp ),

Iraq - Erbil

Address location

E-mail

Mobile phone

Current Location

Internet ability

Communication via internet skills and outlook, other e- mailing services MS-Office & MS Project, Windows All,

General personal skills

Problem solving skills

Good work under pressure and unusual climates

Decision-making ability

Commercial awareness

Ability to motivate others

Degree

Objectives

Key Competencies and skills

language skills

University of Baghdad College of Engineering, Civil Department. BSc. in Civil Engineering Membership

Organization No. of Registration I.D Degree

School or University

Baghdad College secondary school. Baccalaureate Examination for the Preparatory school / scientific section. Consultancy

Arabic

English

Native (written, reading and spoken)

fluent (written, reading and spoken)

Education

Quantity surveying Feasibility studies

Site supervision

Language

Project Management

A12483720 - 09/09/2025

AutoCAD 2D

Quality control Site Managements

Inspections Interior finishing

Time Schedules

Positive attitude towards work and great ability towards result oriented output. Good communication skills

58883 Consultant engineer

10361 Consultant engineer

Marital status

Nationality Iraqi - Sudanese

Date of Birth May 25th 1968

Member of Iraqi Engineers Union

Member of Kurdistan Engineers Union

Military service 1990- 1992 ( served )

Personal & Contact Details

Technical Skills

From To Location

Jul-18 Sep-20

Basra/

Shaat Al

Basra

Feb-15 Jul-17

Northern

state of

the

Republic

of Sudan

Jun-14 Feb-15

Iraq -

Erbil -

Shaklawa

road

Feb-14 Jun-14 Iraq -Erbil

Jul-13 Feb-14 Iraq -

Erbil

Duties

Site Manager.

Manage & supervising

Subcontractors.

QA/ QC the civil work.

Making time schedule.

Follow up activities.

Risk managements.

Site reports.

Shatt Al Basra combined power plant

650MW

All civil & construction work ( 6200

drilled piles, earth work,dewatering

systems, Excavations supporting,

concrete work, surveying, anchor bolts

& all embedded parts, industrial & non-

industrial buildings ).

Amtaar Investment

LLC is an Abu

Dhabi financed

Joint Venture

This is the main project consisting of about 6

000 ha under irrigation. The main crops

cultivated are Rhodes grass, Sudan grass,

Alfalfa and corn. Water is subtracted from

the Nubian aquafer, the largest underground

water resource in the world. Seventy

boreholes that are drilled at least 300m deep

into the desert land supplying 300 cubic

meters of water per hour. The irrigation

system utilizes state of the art technology

with specific advantages in desert

circumstances unmatched by any other

system in the world. Apart from the pumps

the system has no mechanical parts can is

fully automated. This makes it simple to

operate and easy to maintain. Through its

unique manner of distribution and depositing

water practical experience has shown that

the system is 17% more water efficient than

any conventional system.

Construction manager

Direct ( no sub contractors )

implementing for all civil works

Earth works ( cut&fill, levelling

, compacting ) for roads more

that 250Km

Earth works ( cut&fill, levelling

) for main farms blocks .

Installing wooden poles, stay

wires and supports structure.

installing irrigation system (

HDPE pipes, valves, fittings,

floppies)

drilling water wells .

installing residential camp with

all infra-structure works.

constructing lab and other

buildings.

quantity surveys

http://www.razcompany.co/projects/45 shatt al basra 650mw combined cycle power plant project

( Owner KEPPT

, EPC contractor

CMEC )

Experiences

Company Name General description

http://www.amtaar.com/index.php/about us/project/

Trojan General

Contracting LLC

Urbela has an unrivalled location in

Erbil

Constructing of 200 VIP villas ( phase-1

) with all civil, MEP and infrastructure

works .

Site Manager

Infrastructure works

Interior architectural finishing

Earthwork

Concrete work

KAYAR Group HiRISE concrete buildings consisting from 3- main towers with 25 floors each .

Each floor with 4 VIP apartment with area

218 m2.

Civil consultant engineer and QC

Drilled pile works

Earth work

Concrete works

UNAMI ( the

beneficiary)

Dubai Contracting Co. (

Main contractor

Pre-fabricated school 12 classrooms inside

Darashagran Syrian refugee camp outside

Erbil

Surveying

Earth work

Pre-fabricated classrooms

Concrete work

Electrical work

Plumbing & sewage works

From To Company Name Location General description Duties May-13 Jul-13

Iraq -

Salah al

Din - Tuz

Khurmatu

Jan-12 May-13 Iraq -

Baghdad

Jun-11 Jan-12 Iraq

Sep-09 Jan-11 Iraq

Jan-09 Sep-09

Iraq -

Abu

Graib

Nov-06 Jan-09 Jordan -

Amman

Aug-00 Nov-06 Iraq

Jul-92 Aug-00 Iraq

Balad Al- Nahrain

general

constructing Co.

constructing, consultancy m supervising

different kind of residintial buildings,

commercial buildings and VIP villas

Executive Construction manages

site operations ensuring timely

project deliveries, consistently

within budget

quantity surveys

A. Khudairi

Trading &

Contracting

Company

(AKTCC)

pre-cast concrete structure schools in

two governorates (about 167 schools) for

different types ( 6,8,12 and18

classrooms ) in Baghdad Rusafa, Karkh

and Anbar .

Senior Executive engineer

follow-up with ministry of

education.

Site surveying and adaptation.

Supervising sub-contractors

Free Lance Free Lance civil engineer in Iraq –

Baghdad

Al Shurouq

Engineering Bureau

Qurthage

Construction Co.

All Civil works for (more than 20 VIP

villas) in Baghdad -Iraq

Site manager

QC engineer

civil work supervisor

interior and exterior finishing

installation

VIP villas

quantity surveys

The Contemporary

Building

Constructing Abu Graib secondary

school

The main contractor US ACE,

consisting from 18 classrooms, 4-

modern labs, 3- separated buildings .

Senior civil supervisor

Coordinating the work with US

ACE engineers

follow-up time schedules

QC for all civil site works

quantity surveys

Al- Mustansria for

Housing Co.

Commercial buildings, Residential

housing, Villas

Construction Manager

Senior QC engineer

Interior architectural finishing

Earthwork

Concrete work

quantity surveys

Al- Tuz Sewer System Project

Surveying work

Excavations & earth works

Laying pipes

Installing pre-cast concrete manholes

Site manager deputy

Managing Sub- contractors

All site civil work inspections

Time schedule and time control

All site reports

Problem solving

ARWQAT

BAGHDAD Co.

For

ENGINEERING

Design, supply, supervising,

maintenances for several building and

different projects . Chemicals, repair,

and concrete additives technologies.

Senior executive maintenance

engineer

Evaluating different structures

Specifying the required

procedures and material .

Supervising the chemicals

procedures installations.



Contact this candidate