CAREER SUMMARY

Experience of more than 20 years in “PIPING WORKS”, Field, Fabrication and Erection for various Construction Project, in Oil and Gas, Refinery, Power Plant and Chemical Plant. Experience in revising ISOMETRICS and P & ID. Familiar with codes and standard like ASME standards. Knowledge in HSE system and policies for piping. Structural and mechanical works and other related disciplines. Exellent interpersonal, communication and leadership skills, self smarter, team player, sence of responsibility and highly trainable goals oriented person.

EDUCATIONAL QUALIFICATION

*College level/ Mechanical Engineer under graduate. Personal Background:

*Date of Birth: September 8, 1968

*Nationality: Filipino

*Residential Address: Bonifacio Street, Hilltop, Sabang, Morong Bataan. EMPLOYMENT HISTORY

COMPANY: CEPC SHANGHAI

PROJECT: 630 Y 2 MW COAL FIRED POWER PLANT( MARIVELES BATAAN) PERIOD: AUGUST 12, 2018 UP TO PRESENT

POSITION: Piping Supervisor

*Maintaining the Standard of Safety and Quality as per Company Rules and Procedure.

*Check and monitoring the installed piping progress daily as per drawing.

*Ability to make As-Built drawing and maintain all the revision drawing, with proper coordination with QA/QC department for all concern inspection and documentation.

*Check the availability of all fittings, valves, and pipes priority in all areas.

*Responsible for conducting daily toolbox meeting and discuss the safety rules of all workers with the safety officers.

*Good supervision in fabrication shop for the Pre-fab on spooling and double checking of all foreman’s daily progress report.

*Expertise in site execution, close supervise for the safety and correct erection.

*Must attending daily progress meeting and discuss the status of project.

*Coordinates for the test package to complete the pipe line and supports prior for hydrotesting.

*Always check and look ahead every single drawing released to all foreman avoiding double fabrication.

*Always conduct housekeeping before and after activities. EMPLOYMENT HISTORY

Company: DONGHYUP (M) SDN. BHD

Project: LOTTE CHEMICAL TITAN MALAYSIA (Pasir, Gudang, Johor, Bahru Malaysia) Period: October 2016 TO April 2018

Position: Piping Foreman

Scoop of Work: Fabrication and Erection

*Able to make planning, revision of pipe lay-out drawing designed, making issued for construction.

*Coordinate to my supervisor of any priority schedule according to the project planning.

*Plan and do preparation of work activity and coordinate to my supervisor for permit to work Endorsement.

*Familiarized all documents and drawing, structural, isometric, supports, P & ID and general arrangements drawing and details.

*Distribution of Manpower according to their assignment base on planning schedule.

*Ensure that fabrication pipe spooling and pipe support is followed on approve construction drawing and project specification.

*Also involve in lifting installation.

*Daily routine supervision to check the daily progress and updated status in every areas designated.

* Daily monitoring safety talk/toolbox talk and supervision and subcontractor activities and progress. EMPLOYMENT HISTORY

Company: (CESCO) Dyna-Mac/CESCO International offshore/CAWAG SUBIC. Clients: Shell Philippines Exploration B.V

Project: MALAMPAYA Phase 3 FPSO

Period: May 10, 2013 – January 31, 2015.

Position: Piping Supervisor Mechanical Top Side FPSO Module Platform.

*Responsible to the project/construction manager for the full execution of the project in the time frame schedule, quality control and safety implementation.

*Preparation of project execution plan, method of statements/risk assessment and quality plan and parts of ITP’s for installation and other document of project.

*Monitor physical installation of ensure that is installed in accordance with and specification and applicable codes.

*Interpret piping drawing and structural specification in daily activities.

*Assist all my foreman’s and lead man to ensure the method of statement procedure are adhering and implements in accordance with project standards and specification.

*Verification/Inspection of arriving materials from manufactures/vendors of a good quality welding production, dimensional check and acceptable.

*Coordinates interface with other disciplines engineers of any situation for immediate solution of the problem occurred at site.

* Assist my foreman and lead man as technical support on query to fabrication and erection.

*Attendance of weekly construction meeting and conduct daily meeting with project manager/construction manager of their daily work schedule and activity.

*Daily monitoring of morning safety talk /toolbox talks and supervision within the areas of activities and Progress.

EMPLOYMENT HISTORY

Company: Sta. Clara International

Position: Piping Foreman

Period: July 10, 2012 – April 15, 2013

Project: Petron-RMP2 Project – Refinery Mastery Plan 2 Lamao, Limay, Bataan. Scoop of work: Utilities, Underground Piping and Civil Works.

* Responsible to the project/construction manager for the full execution of the project in the time frame schedule, quality control and safety implementation.

* Assist my lead man as technical support on query to fabrication and erection.

*Conduct every morning briefing to ensure method of statement/JHA, and PTW procedures are adhering and implements in accordance with project standards and specification.

*Verification/Inspection of arriving spool material from shop fabrication.

*Request surveyor to get mark coordinates and excavate in correct invert elevation for underground piping.

*Assist and Supervision to do gravity test, install cathdres protection, holiday testing, sand bedding and backfilling.

*Also involve in lifting installation.

*Daily routine supervision to check the daily progress and updated status in every areas designated.

* Daily monitoring safety talk/toolbox talk and supervision and subcontractor activities and progress. EMPLOYMENT HISTORY

Company: Keangnam Inter Prices LTD /Toamsina, Madagascar Africa. Period: March 11, 2008 to March 26, 2011

Position: Piping Foreman

Project: Ambatovy Project/Coal Fired Thermal Power Plant. Scoop of Work: Fabrication/Erection Fit-up of Boiler Piping.

*Able to make planning, revision of pipe lay-out drawing designed, making issued for construction.

*Coordinate to my supervisor of any priority schedule according to the project planning.

*Plan and do preparation of work activity and coordinate to my supervisor for permit to work Endorsement.

*Familiarized all documents and drawing, structural, isometric, supports, P & ID and general arrangements drawing and details.

*Distribution of Manpower according to their assignment base on planning schedule.

*Ensure that fabrication pipe spooling and pipe support is followed on approve construction drawing and project specification.

*Supervising on field erection of Boiler Piping, Steam Drum, Boiler Platform elevation, plumpness, squares, do line check of pipe line and punch list clearing prior for hydro testing.

*Report to my direct supervisor of daily progress activity and completed works.

*Coordinate and Monitor safety precaution required in the work site to ensure safe working condition. EMPLOYMENT HISTORY

Company: SHILOH INTERNATIONAL

Period: 2007 to 2008

Position: Lead man Piping

Project: Petron FFC Revamping Project

Brgy. Lamao Limay Bataan.

Scoop of Work: Fabrication and Erection

* Interpret isometric and general arrangement drawing and do materials take off.

*Prepare materials and tools for fit-up and erection.

*Ensure that fit-up is correct orientation, dimension and materials in used according the isometric drawing specification.

*Assist line check, punch clearing and re-instatement prior to hydro test.

*In charge of preparing the tools, equipment, materials requisition to be use in piping erection.

*Directly report an activities related to proper and efficient coordination with my supervisor. EMPLOYMENT HISTORY

Company: EEI Corporation

Period: 2005 to 2006

Position: Pipe Fitter A

Project: Pilipinas Kao Chemical Plant Cagayan De Oro Philippines Scoop of Work: Fabrication and Erection

*Interpret piping plans and isometric drawing.

*Fabricate jigs and fixtures, clamps for fabrication & installation.

*Prepare weld joints as per isometric drawing and specs.

*Fabrication and Erection of pipe using general arrangement plan drawing, isometric drawing as reference.

*Ensure that fit-up Spools, Valves, Flanges, Weldolet, Socolet, Threadolet and Gaskets.

*Layout marking and fabricate of equal tees, lateral, temporary gasket, temporary flanges, stub-in stub- out connection.

*Perform punch listing jobs.

*Perform rigging and lifting operation.

*To ensure by the end of the day housekeeping and tool keeping properly be done. EMPLOYMENT HISTORY

Company: Reliant Engineering / AMBIT Trading and Technical Services Inc. Period: October 4, 2004 to April 21, 2005

Position: Piping Leadman

Project: Diesel Power Plant 108 Megawatts ILOILO City Philippines Scoop of Works: Fabrication / Installation

*Fit-up Fabrication of 10”24” Pipe Carbon Steel / including pipe erection.

*Perform lifting and rigging operations.

*Preparing of fit-up, manpower progress report and submits to my superior in daily basis.

*Prepare and arranges of fittings prior for fabrication fit-up as per drawing required.

*Ensure that fabrication fit-up spooling and pipe supports are followed on approved construction drawing and project specification.

*Assist in Pre-Co work.

*Enforce safety measures and ensures that all works adhere strictly to all requirements and specification of the contract documents.

EMPLOYMENT HISTORY

Company: AMBIT Trading and Technical Services Inc. Period: October 2003 to April 2004

Position: Leadman Piping

Project: Geothermal Power Plant 4x55 MW (Unit 1-4) Laguna Philippines Scoop of Work: Rehabilitation Project (Shut down)

*Preparation of materials and equipment needed for dismantle of former pipe line.

*Evaluation of plan for revision and field change if necessary.

* Interpret isometric and general arrangement drawing and do materials take off

*Do field erection of pipe spool, pipe support, and equipment installation.

*Update and check if any latest revision to my superior.

*Perform heavy lifting and rigging works for the big bore pipe spool erection.

*Implement safety standards and in house rules do housekeeping of all work areas. EMPLOYMENT HISTORY

Company: SHILOH INTERNATIONAL / KPS

Period: January 2003 to May 2003

Position: Pipe Fitter

Project: Coal Fired Thermal Power Plant Mauban Quezon Scoop of Work: Shutdown / Dismantling of Boiler feed water line.

*Replacement of main steamed valve unit 1 – unit 2.

*Removal and replacement of feed water pipe line.

*Fabrication fit-up of small bore emergency drain line.

*Prepare tools and check the spool pipe fabricated in correct orientation and squares.

*Installation of fit-up of pipe spool as per elevation required and coordinates references.

*Good housekeeping is a must before and after job task. EMPLOYMENT HISTORY

Company: MIESCOR / Flour Daniel

Period: 2000 to 2002

Position: Pipe Fitter

Project: Procter and Gamble Cabuyao Philippines

Scoop of Work: Maintenance and Expansion Project.

*Installation and fit-up of stainless tubing for compressed air line.

*Assembly full case conveyor from layout to install alignment centering, leveling, tensioning, belt splicing, motor chain adjustment.

*Fabricates different kind of spooling, pipe to flanges, pipe to tee, pipe to elbow, 45 degree, 90 degree pipe to reducers, eccentric, concentric.

* Interpret isometric and general arrangement drawing and do materials take off.

*Coordinate to my entire superior in case of revision and modification base on the isometric drawing.

*Conduct hydro testing and pneumatic test.

*Do field erection pipe spools and fit-up / including standards pipe support.

*Attended always in the regular safety tool box meeting and comply to all existing rules and regulation implemented on the job site.

EMPLOYMENT HISTORY

Company: MIESCOR / Samsung Industrial Engineering Services Inc. Period: 1998 to 1999

Position: Pipe Fitter

Project: 1000 MW TCCPS – HRSG – Gas Plant

Scoop of Work: Fabrication and Installation of Piping, Vessel, Furnace

*Prepare tools, equipment and other necessary materials prior for fit-up and installation.

*Fit-up and installation of steam pipe from boiler to turbine.

*Installation fit-up of boiler tubing water wall, and air pre heater as per drawing required.

*Coordinates with my superior for any revision and modification.

*Interpret piping plans and isometric drawing.

*Attended every day toolbox meeting and safety briefing is a must. EMPLOYMENT HISTORY

Company: MIESCOR / Industrial Engineering Services Inc. Period: 1997 to 1998

Position: Structural Fitter

Project: 600 MW Coal Fired Thermal Power Plant Masinloc, Zambales Scoop of Work: Layout and Marking / Fabrication, Erection.

*Layout marking and cutting of beams, H.E, IPE beams, plates. Needed for stiffener and gusset plate.

*Fabricate and erection of main girder, platform, and diagonal bracing.

*Ensure that fit-up orientation and material specification is in correct as per drawing.

*Follow the WPS procedure before start welding or tracking of plates and beams if required for heating.

*100% ensure to use gas cutting, automatic radial, manual pipe radial, and beveling machine.

*Preparation of tools for erection bolt tightening to know how to compute the conversion of range to bolt size.

*Follow and attended for the everyday safety talk and job assignment activity. I hereby certify that the above mentioned information is true and correct to the extent of my knowledge and belief.