Post Job Free

Resume

Sign in

Manager Construction

Location:
Seeb, Muscat, Oman
Posted:
December 26, 2020

Contact this candidate

Resume:

Page * of *

FAZIL AKSIT

CIVIL ENGINEER (B.Sc. **78)

My objective:

I utilize my over 40 years of Civil

Engineering and Projects

Management as professional

experience, with technical and

personal skills for the benefit of

humanity.

a. I have a very wide range of

experience in international

projects of construction and

development.

b. I have managed and

completed various types of

international construction

projects.

c. I have wide experience in the

Middle East region since I

know the Arabic language

and most of my career, I was

responsible for the execution

of the projects which I had

involved.

d. I have full knowledge of

engineering discipline,

international contract forms,

and human relations as well.

e. I can easily adapt to the

challenges and solve

complex situations.

EDUCATION

B. Sc. at Civil Engineering 1978

UNIVERSITY of GAZI, Engineers & Architectural Science Faculty, Ankara- Turkey

1972 - 1978

WORK EXPERIENCE

Company: OMAN RAIL - INSHA Consultant / Sultanate of Oman Title: CONSULTANT CONSTRUCTION MANAGER-Tunnels

July 2018 – Currently

Scope of the Project and Responsibilities:

1. Consult and Control Construction of Two Highway tunnels with 2 tubes, which are Constructing the very first time in the Sultanate of Oman.

2. Review of the tunnel project design criteria, construction details, and specification,

3. Monitors progress of Construction against the program, 4. Management, administration, and direction of the site supervision team for overseeing the construction of the tunnel project. 5. Review the method statements and procedures concerning the tunnel works,

6. Review the risk analysis of the NATM excavation system selection, check excavations, check parameters, monitor settlements control tunnel stability,

7. Inspect the tunnel works by following RFI s (including lining application and all remedial works),

8. Implementation of contracts terms and conditions, 9. Inspects, reviews, and accepts HSE plans, and closely monitor its implementation.

Page 2 of 6

CONTACT

PHONE:

Sultanate of Oman: +968-****-****

Turkey: +90-533-***-****

EMAIL:

adiyip@r.postjobfree.com

adiyip@r.postjobfree.com

adiyip@r.postjobfree.com

HOBBIES

Driving

Reading

Swimming

COMPUTER SKILLS:

MS -Windows, MS-Office, MS-Project

10. Prepare various reports about operations, equipment, procedures, and other issues.

11. Establishes and enforces an effective project quality control procedure and ensures that they are audited following the contract requirements and specifications,

NKY Architects & Engineers Co.

2015–2017

Title: CONSULTANT SITES CONSTRUCTION MANAGER for 8 PROJECTS in the Kingdom of Saudi Arabia

Project: KAP 2D (King Abdullah Project 2 – Part D), Scope of the Project and Responsibilities:

1. Consultant Sites Construction Manager of Security buildings Projects were belonging to the Ministry of Interior, projects were in Riyadh and the Eastern Region of the Kingdom of Saudi Arabia, 2. Coordinate with third party stakeholders, including government agencies, Ministry officials which were required during supervising the projects.

3. Monitors progress of Construction,

4. Cost Management and estimating monthly and annual budget, 5. Management, administration, and direction of the site's supervision team for overseeing the construction of the projects. 6. Prepare various weekly and monthly reports,

7. Inspects, reviews, and accepts HSE plans, and closely monitor its implementation,

8. Establishes and enforces effective projects qualities control procedure and ensures that they are audited following the contract requirements and specifications

9. Total projects under my supervision management value were: 4.5 Billion Saudi Riyals (US Dollars: 1.5 Billion

MEGA ENGINEERING & CONSULTING Co.

2013–2015

Title: CONSULTANT CONSTRUCTION MANAGER / North Iraq Project: Design and Construction of Galley Zakho Road Tunnel / North of Iraq, Scope of the Project and Responsibilities: 1. As Consultant Construction Manager was Representing the Road and Bridge Directorate of North Region of Iraq,

2. While this project tender documents had been prepared by MEGA Engineering & Consultant Co. and tendered as design and construction, our active responsibilities start with the following: 2.1. Review all tunnel design criteria, Geo-technical investigation, construction details, specifications, quantities, HSE, risk assessment, and cost estimate.

2.2. Following project management including coordination of field and design changes, time impact analyses, soil mitigation, and disputes resolution.

Page 3 of 6

2.3. Review all contractor submits (method of statements, material submitting, Claims & Extension of time applications and progress payments, etc

2.4. Review the risk analysis of the NATM excavation system selection, check excavations, check parameters, monitor settlements control tunnel stability,

2.5. Inspect the tunnel works by following RFI s (including lining application and all remedial works),

2.6. Cost Management and estimating monthly and annual budget 3. Project consisting:

3.1. Two parallel Highway tunnel tubes with a width of 12 m and each tube length 3.600 m, the total 7.200 m tunnel.

3.2. Total of 48 m length Cut & Cover for each tunnel tubes portals from both of Inlet and Outlet sides,

3.3. The Tunnel tubes excavation works had completed and the NATMs system was utilized by using explosive and excavator with supporting them by Steel arches, rock bolts as part of umbrella supporting systems,

3.4. The total tender Value of the project was: 135.500.000 US Dollars

Ozgun Construction & Contracting Ltd.

2003-2012

Title: COMPANY REGIONAL DIRECTOR OF MIDDLE EAST &

PROJECT MANAGER (Algeria, Libya & Iraq)

1. State Highway Interchange (Tunnel & Bridge) Project in North of Iraq (2012-2010), Scope of the Project:

1.1. Underground Pass Tunnel of 280 m.

1.2. Overpass Cross Bridge of 320 m.

1.3. The project involved the relocation and reconstruction of all infrastructure utilities around the project area (across 20 km line),

1.4. The project included a stormwater line and pump station. Value of the project: US $ of 15.500.000.00

2. Highway No:13 Project in the Bejai State of Algeria (2009- 2010), Scope of the Project:

2.1. Three tunnels with a total length of 1700 m. These tunnels had been Constructed with the NATM system by using explosives and excavators with arch, rock bolt, and umbrella supporting systems.

2.2. Installation of 11 km standard asphalt road.

2.3. Value of the project: 35,000.000.00 Euro

3. Railway Project between Tizi Ouzou – Wadi Aissi of Algeria

(2006-2003), Scope of the Project:

3.1. Five viaduct type bridges with a total length of 4 km, Page 4 of 6

3.2. Three tunnels of total length 2650 m. During

construction of the tunnels, NATM s were utilized

by using excavator and umbrella supporting

systems

3.3. Installation of 14 Km standard railway line,

3.4. Three number of railway stations building (One main +Two substations),

3.5. Value of the project: 110,000.000, 00 Euro

Aydiner Construction Co.

2002 – 2003

Title: CONSTRUCTION SITE MANAGER in Dead Sea of Jordan Construction of (5) Water Collector DAMs, Transfer Line and Reservoirs Project in the Dead Sea/Jordan, Scope of the Project:

Constructing five water reinforced concrete collector small dams overactive valleys in the Dead sea area

In Total 28 km transfer duct (1000-1200 mm) line, supported with two pump stations.

The water reservoir of the total volume of 20.000 m3.

(DSI) General Directorate of State Hydraulic Works - TURKEY Title: CONSTRUCTION SITE MANAGER / Turkey

Project: Construction of Beylerli Irrigation DAM in Denizli / TURKEY, Scope of the Project:

Clay seed-soil filling type dam with a spillway,

Diversion box canal (Width: 2, 8 m, Length: 700 m), Irrigation line 60 km.

The capacity of 3.25 hm3

COTAM Ltd. (Swedish Investor Company)

1992-2000

Title: CONSTRUCTION SITE MANAGER

1. Construction of Holiday Resort in Bodrum of Turkey (1997- 2000), Scope of the Project:

1.1. Super structural holiday resort & hotel project, consisting of 230 rooms, a reception building, Restaurants, and a shopping center,

1.2. A parking lot for 100 cars,

1.3. Swimming pools (Open & Close),

1.4. Sewerage desalination plant.

1.5. The total area of 20.000 m2.

1.6. The project was completed within 30 months and still serving for the tourism Industry.

Page 5 of 6

2. Construction of Textile Plant Complex (5 factories) in Göktepe /Turkmenistan (1992-1997), Scope of the Project: 2.1. This Project was B.O.T. tendered project

2.2. Construction of industrials steel buildings and assembling of all the Factory equipment for a textile complex consisting of Five Individual Factories.

2.3. Value of the project: 74.000.000US Dollars.

Endico & Saad Trading JV / Saudi Arabia

1987 - 1990

Title: CONSTRUCTION SITE MANAGER / Saudi Arabia

Project: AL- SALAMAH & AL- KHALIDIYAH District Underground Water-table Reduction Network, Reservoirs and Pumping House Construction Project in Jeddah/Saudi Arabia

Scope of the Project:

Installation of 36 km Vitrified Clay Pipeline

(1200/1000/800/600/400 mm diameter)

Installation of 12 km concrete covered ductile iron pipe (800 mm diameter)

Two pump stations House with 750 m3 capacity

Total value of project: 46,000,000.00 – Saudi Riyals Al-Mammon & Al-Ijtihad JV / Saudi Arabia

1984-1987

Title: CONSTRUCTION SITE MANAGER / Saudi Arabia

Project: Eleven (11) Schools complexes in HOUFUF - KSA Scope of the Project:

Total of eleven schools as a complex with all peripheral facilities, total area 52.250m2.

The total value of the Project: 185.000.000, - Saudi Riyal Ar-yapı Construction Co. / Libya

1981-1984

Title: SITE ENGINEER

Project: ZUWARA-ABUKAMMASH (34 Km) State Road Project in Libya, Scope of the Project:

1. 34 km of road construction project

2. 2 box cross Calvert

3. Total Value of project US Dollars: 47.850.000,00 $ Kiska Commandant Co. / Turkey

1979 - 1981

Title: SITE FIELD ENGINEER

Page 6 of 6

Project: 7 km Single Railway Tunnel Construction Project in Beypazari

/ Turkey

Scope of the Project:

1. Main Tunnel for Railroad 7 km. length, NATM excavation system

2. Sub service tunnel 340 m

3. This project had been completely constructed by NATM’s system.

(TCDD) Turkish Republic Railroad Department, Ministry of Transport / Turkey

1978-1979

Title: TECHNICAL OFFICE ENGINEER

My skills as an engineer had been started in a Governmental office on Rail Road Engineering Department in Ankara / Turkey in 1978 SKILLS

Professional Civil Engineering & Management

Microsoft office programs ( Word, Excel, power point, MS Project, etc..)