Post Job Free

Resume

Sign in

Chemical Engineering Maintenance

Location:
Lahore, Punjab, Pakistan
Salary:
35000
Posted:
December 25, 2020

Contact this candidate

Resume:

AFTAB HUSSAIN

adiybf@r.postjobfree.com

+92-310-***-****

ACADEMIC DETAILS

COURSE SPECIALIZATION INSTITUTE/COLLEGE BOARD/UNIVERSITY % /CGPA YEAR

BE Chemical Institute of Chemical Engineering University of Punjab, Lahore 3.00 2020 Inter Pre- Engineering PINS School and College BISE Multan 70.18 2014 Matric Science PINS School and College BISE Multan 85.3 2012 ELECTIVES/TECHNICAL PROFICIENCY

Electives

Environmental Engineering, Polymer Engineering, Industrial Management and Process Economics, Process Plant Safety and Maintenance, Petrochemical Engineering, Transport Phenomena, Biochemical Engineering, Reaction Engineering, Fuel and Combustion, Separation Processes, Micro-Fluids and Its App, Introductory Psychology Physiology, Creative Writing.

Technical Proficiency

Aspen plus, Aspen HYSYS, UniSIM, Ariel7, HTRI Exchanger Suite, Microsoft Office Suite, Windows 10 SUMMER INTERNSHIP/WORK EXPERIENCE

\

KCA Deutag (Roustabout)

March 2020 - Present

• Assist on the drill floor, responsible for organization of drilling equipment.

• Cleaning, scraping and painting the drilling deck and equipment.

• Performed inspections and used to move personnel and equipment around a foot oil rig.

• Off loads supplies and moves them to storage areas.

• Handled loading and unloading of drill pipe and casing.

• Assist with repair and maintenance of pumping equipment, identifying faults and solving them.

• Maintain a clean worksite, moving and tidying up equipment and materials.

• Conducted routine safety briefings with other team members and crew foremen.

• Promptly and consistently attended weekly safety meetings, implementing any changes with ease and immediacy.

• Consistently met and exceeded compliance standards as defined by the organization's protocol & training matrices.

• Assist with maintenance, transportation, and sometimes operation of same equipment.

• Extensive use of multiple hand tools.

• Cleared all anti-spill plastic on dry oil wells from job sites.

• Assisted Operator and load tubular, pipes and other equipment required for rig operation.

• Understanding of drilling equipment’s e.g. x-0’s tubular and BHA’s.

• Identify hazards on the floor and report them to Driller.

• Working under directions of Floorman and AD.

• Assisted other rig personnel or provide relief to drill crew.

• Assisted Derrickman in mixing correct mud mix for drilling.

• Performed tasks in rig safety and cleanliness, cleaning, chipping, and painting.

• Attended daily and weekly safety meetings. Installing C5 pumps at different well sites.

• Worked with different departments, with members of different nationalities to accomplish tasks on a daily basis. OGDCL (Gas Processing Plant)

June 2019- July 2019

• Learned about the process parameters, controls and their action steps in case of emergency. Hot and Cold startup

• Shutdown of processing plant ( front end compressors section) which included steam, methane, and acid gas removal unit, separators, pigs, turbines, double staged compressors, SUNAR Turbines and Air coolers.

• Trainee in the technical management department.

• Worked under senior management staff to assist with data collection, analysis, and recording.

• Develop, configure and optimize industrial processes from inception through to start up and certification.

• Assess processes, take measurements and interpret data.

• Help in design, run, test and upgrade systems and processes.

• Investigating and troubleshooting plant/process problems.

• Develop best practices, routines and innovative solutions to improve production rates and quality of output.

• Perform process simulations.

• Manage cost and time constraints.

• Perform risk assessments.

• Handled process documentation and operating instructions.

• Made a Machine maintenance solution list and schedule for June 2019 for processing plant.

• Ensuring safe working conditions and compliance with health and safety legislation. WINDMÖLLER & HÖLSCHER (PAPER BAG MAKING MACHINE)

July 2016- August 2016

Engineer Associate - In charge of end to end process of bag manufacturing. Responsibilities included company screening, Lead Generation, Cold Calling, Introducing our product to management and decision, collecting their data requirements and coordinating their requests with the research team. Responsibilities:

• Main focus to improve Maintenance Key Performance Indicators [KPIs], Maintenance Standards, Equipment Reliability, Spare Part Availability, Production Optimization.

• Organizing, training & development of maintenance team, preparation of standard maintenance procedures, utilizing best practices for effective maintenance with reduction in machine breakdown and improve machine performance / reliability by using predictive, preventive maintenance and Reliability Centered Maintenance Techniques. Overhead spare part planning, on time availability of spares, resource planning, Activities Planning through SAP based maintenance system.

• Performed Root Cause Analysis to avoid repetition of failures. Repairing of faulty equipment’s to reduce maintenance cost.

• Supervise Overhauling, repairing and maintenance of equipment. PROJECTS

Final Year Project

Design and Simulation of Methanol Production Plant by CO2 Hydrogenation 2019-2020

• Process simulation for generating process data by using Process simulator(s) ASPEN HYSYS, ASPEN PLUS etc.

• Preparation of Process Flow Diagrams, Heat and Mass Balances, piping and instrumentation diagram.

• Equipment Sizing (Tanks, Vessels, Pump etc.) and generation of Process Data sheets.

• Thermal Rating Calculation by using HTRI

• Steady state Hydraulic calculations for Line sizing, pump calculation etc.

• Design review and closeouts.

• Cost evaluation

• Fuel Grade Methanol Production

Research Report on Water Treatment Sep 2018-Nov 2018

• In this work, samples of water were collected from three different wells at two different times of the year. The first set of samples was collected in the month of September, 2018 & the second set was collected in November, 2018.

• Over the due course of time various parameters regarding the water quality were analyzed & the Pakistani Standards: (Drinking water specifications) were referred to in order to check the acceptability of water.

• The parameters which were analyzed are as follows:

• Total Dissolved Solids.

• Total Suspended Solids.

• Determination of pH

• Determination of chloride content.

• Conductivity.

• Determination of sulfate content.

• Turbidity.

• Iron content.

• Manganese content.

• Most of the parameters were not found to be in the desirable range for drinking water.

• Hence, appropriate measures were suggested to improve the quality of water. References

Will be provided on demand



Contact this candidate