NAME : PETER LEONG KOK WAH
NATIONALITY : MALAYSIAN
DATE OF BIRTH : 04-MAY-1956
NRIC NO : 560***-**-****
PASSPORT NO : A 50315424 ( Expiry 13-MAR-2023 )
CONTACT NO : +601*-****** . +601*-*******
CONTACT ADDRESS: NO 225, KAMPUNG BARU CHENDRONG,
BATU GAJAH, 31000, PERAK. MALAYSIA.
EMAIL ADDRESS : adivqg@r.postjobfree.com
COMPUTER KNOWLEDGE: MICROSOFT OFFICE EXCEL, MICROSOFT OFFICE WORD.
LANGUAGES SPOKEN ENGLISH, MALAY & MANDARIN
WRITTEN: ENGLISH, MALAY & CHINESE 12 YEARS STUDY
QUALIFICATION
.Direct craftsmen activities, through craft supervision, within the area of responsibility.
.Implement and enforce policies, procedures and related work rules as established by field
construction management.
.Assist superintendents in the preparation of construction methods, schedules, manning
charts, material and equipment requirements.
.Ensure safety standards and requirements are implemented and adhered to by craftsmen
and other when in the operational area, tools and equipment are in safe condition and
operated safety.
.Responsible for field construction operations within assigned discipline or area.
.Determine manpower requirements. Coordinate established area operational plans.
schedule work to be performed and review works accomplished by each craft.
Monitor sub-contractor activities to ensure compliance with specifications and schedules.
.Coordinate activities with other disciplines or areas and clients resident representatives as
instructed by construction management.
.Responsible for line checking, punch killing, modification, hydro testing and supervision of piping works during commissioning, and maintenance till completion. Coordinate of hydro testing with client and contractor.
COURSE ATTENDED
.Attended Oil And Petrol Chemical Safety Supervisor ( Singapore )
.Attended Certificate For Shipyard Safety Supervisor ( Singapore )
.Attended Welding inspector Course By American Welding Society ( Singapore )
.Attended Safety Induction Course Labuan Shell Supply Base ( Sabah )
.Safety Scaffolding Course At Sribima Training Centre ( Lutong Miri, Sarawak )
.Safety Offshore Diving Supervisor Course At Sribima Training Centre ( Lutong Miri, Sarawak)
.Attended Offshore Safety Supervisor Course ( Malacca )
EMPLOYMENT HISTORY
Mar-2019-30 Dec-2019 SAPURA ENERGY BERHAD (LUMUT MALAYSIA)
Project PEGAGA INTERGRATED CENTRAL PROCESSING PLATFORM MODULE
Position piping superintendent
Responsibility Supervision for all piping erection control, line check with my supervisor to clear
and kill the owner walk-down punch-list, check and confirm the field instruction
works and re-instatement works.
April-2016- 31 Oct-2018 SIEMENS GERMANY (MALAYSIA) SDN BHD
Project PENGERANG COGENERATION PLANT (PCP) JOHOR, MALAYSIA
Position PIPING SUPERVISOR
Responsibility Supervision for sub-contractor piping pre-fabrication and installation for GRP pipe and
HDPE underground piping, Line check and punch killing, testing & re-instatement and
commissioning activities .
July-2015-Feb-2016 CHINA PETROLUEM ENGINEERING & CONTRUCTION CORPORATION (CPECC)
Project OILWELL PIPING PROJECT (SOUTH SUDAN, AFRICA)
Position SITE MANAGER
Responsibility Supervision for sub-contractor piping pre-fabrication and erection work and
Fully in-charge and control for the project.
Jan-2015 – May-2015 TECHNIP MALAYSIA SDN BHD
Project SHELL MALIKAI MODULE, TLP DEEPWATER PROJECT (MMHE) JOHOR,MALAYSIA
Position PIPING SUPERINTENDENT
Responsibility Supervision for sub-contractor piping pre-fabrication, erection of pipe works, line check
Review of test-packages, to kill and clear punch-lists item and re-instatement works.
Sept-2014 – Nov-2014 FOSTER WHEELER (MALAYSIA ) SDN BHD
Project ARKEMA LYCHEE PROJECT ( KERTEH, TERENGGANU )
Position PIPING SUPERVISOR
Responsibility To kill and clear the owner walk-down punch-lists, check and confirm the field
instruction works and re-instatement work
Mar-2014 – Aug-2014 MMHE MALAYSIA MARINE HEAVY ENGINEERING SDN BHD
Project GUMUSUT KAKAP FBS SHELL MODULE PROJECT
Position PIPING TESTING AND RE-INSTATEMENT COORODINATOR
Responsibility Fully in-charge for testing and re-instatement coordinate activities, with other
Disciplines or clients resident representatives as instructed by construction management.
Responsible for hydro-testing and supervision of pipe works during coordinate of
Hydro-testing with client and contractor.
Feb-2013- Feb-2014 SARWAJA TIMUR SDN BHD (KUCHING, SARAWAK )
Project PALM OIL MILL REFINERY PROJECT ( BAU, SARAWAK)
Position PIPING INSPECTOR & MECHANICAL SUPERINTENDENT
Responsibility Supervision for sub-contractor erection of boiler panel plate, install inspection, Shop
Fabrication of boiler pipe and production pipe works.
July-2012 – Nov-2012 M+W HIGH TECH PROJECT (MALAYSIA) SDN BHD Project SYNTHOMER MONOMER RECOVERY PROJECT (KLUANG )
Position PIPING INSPECTOR SUPERVISOR ( Revamp Project )
Responsibility Supervision for sub-contractor piping pre-fabrication, line-check, punch-killing and
review of testing packages.
Feb-2012 – June-2012 RANHILL WORLEY PARSON ( MALAYSIA ) SDN BHD Project LNG REGASIFICATION OFFSHORE PROJECT ( MALACCA )
Position PIPING SUPERINTENDENT
Responsibility Supervision of sub-contractor piping prefabrication, erection and line check, Involve in
final re-instatement activities, Responsible for construction pre-punch and punch killing.
Feb-2011 - Dec-2011 EKA AKZONOBEL COPORATE (Chlorine dioxide plant ) Project SABAH FOREST INDUSTRIES SDN BHD (SIPITANG, SABAH)
Position ASSISTANCE SITE MANAGER
Responsibility Handle hold project of piping and equipment, fabrication and site erection works.
Mobilize for site activities as manpower control, machinery, crane and fully support a for contractor, prepare for punch-list test packages and site test activities
Dec-2009 - Aug-2010 TOYO ENGINEERING & CONSTRUCTION SDN BHD ( MALAYSIA )
Project NIPPON ELECTRIC GLASS CO, LTD ( SHAH ALAM, KL )
Position QS, QC & MECHANICAL SUPERVISOR
Responsibility Carry out of drawing, identity quantity of material to order. Supervision fabrication, fit-up
and visual inspection, Monitor daily manpower and progress report.
Feb- 2008 – Feb - 2009 SEALINK ENGINEERING & SLIPWAY SDN BHD (MIRI, SARAWAK)
Project 61.2 METER SUPPLY VESSEL
Position SHIPYARD PIPING SUPERINTENDENT
Responsibility Supervision of sub-contractor piping pre-fabrication, installation, line check, punch
killing and review of hydro-testing packages and witness of hydro testing.
April-2006 - April-2007 JGC MIDDLE EAST FZE, QATAR BRANCH ( QATAR)
Project QACO ETHYLENE PLANT, EXPANSION PROJECT ( MESAI, QATAR )
Position CONTRUCTION PIPING SUPERVISOR
Responsibility Supervision construction works and test package, to liaise piping design and various
Field change, supervise invalid re-instatement during general shut down.
Oct-2004 - Dec-2005 KNM ENGINEERING SDN BHD (GABANG, KUANTAN)
Project EXXON MOBIL OFFSHORE PROJECT ( TERENGGANU )
Position SENIOR PIPING SUPERVISOR
Responsibility Supervision of fabrication pipe spools, dimension check, x-ray, shop-testing,
sand plasting and painting, packing and transport.
Aug-2002 – June-2003 SARWAJA TIMUR SDN BHD (KUCHING, SARAWAK )
Project SEJINGKAT POWER STATION EXPANSION PROJECT (KUCHING)
Position PIPING SUPERVISOR
Responsibility Supervision construction works and line-check, pressure testing, re-instatement
to clear the construction and owner punch-list.
May-2001–March-2002 SARWAJA TIMUR SDN BHD (KUCHING, SARAWAK)
Project MLNG EXPANSION PROJECT (BINTULU, SARAWAK)
Position STRUCTURAL PLATFORM & PIPE SUPPORT SUPERVISOR
Responsibility Supervision of fabrication structural platform, and pipe support material, bending works
marking and fit-up works and visual inspection
Nov-2000-April -2001 SECULAR MECHANICAL CONTRACTOR PTE LTD (SINGAPORE)
Project REVAMP PROJECT OF DOP PLANT (BANGKOK, THAILAND)
Position PIPING & MECHANICAL SUPERINTENDENT
Responsibility Supervision hold project piping and equipment fabrication and installation works,
dismantle of drums, vessel, columns, piping and re-install the new equipment and
piping during shut-down, line-check, pre-punch, punch killing and hydro-testing activities.
Feb-2000 – Oct-2000 PHILIPP MULLER P+ H SDN BHD GERMANY
Project FIRST CILICON WATER FAB PROJECT (KUCHING, SARAWAK)
Position PIPING SUPERVISOR
Responsibility Supervision of sub-contractor fabrication, erection, line-check, punch-killing and
Re-view of hydro-testing packages.
Sep-1998 - Sep-1999 SANKYU ENGINEERING & CONSTRUCTION MALAYSIA
Project KVCM CHEMICAL PLANT (KERTEH, TERENGGANU)
Position CONTRUCTION MECHANICAL SUPERVISOR
Responsibility Fully supervise installation and erection of 2 units cracking heater(500 ton) equipment
platforms and ladders (210 ton), visual inspection for welding and punch-list
item, and hydro-testing activities.
May-1997- July 1998 APECO ENGINEERING PTE LTD (SINGAPORE)
Project CHEMICAL PLANT, PULAU SERAYA ISLAND (SINGAPORE)
Position PIPING SUPERVISOR
Responsibility Supervision of sub-contractor fabrication, erection, line-check
killing and review of hydro-t punch testing packages.
OCT-1994 – Oct-1996 HITACHI PLANT ENGINEERING & CONSTRUTION (M) SDN BHD
Project 50th STOREYS LION TOWER, JALAN AMPANG ( KL, MALAYSIA)
Position PIPING & MECHANICAL SUPERVISOR
Responsibility Supervision of chilled water pipe, Fcu, Ahu, Pump, chiller and cooling tower installation
works, Responsible for construction pre-punch and punch killing, review of hydro-testing
packages and witness of hydro-testing.
June-1993 – July 1994 APECO ENGINEERING PTE LTD (SINGAPORE)
Project SENOKO POWER STATION ( SINGAPORE )
Position PIPING SUPERVISOR
Responsibility Supervision sub-contractor piping pre- fabrication, erection, line-check,punch killing a and review of hydro testing packag and witness of hydro-testing activities.
Sep-1991 - Oct-1992 APECO ENGINEERING PTE LTD (SINGAPORE)
Project TUAS POWER STATION (TUAS, SINGAPORE )
Position PIPING & INSTRUMENT TUBING SUPERVISOR
Responsibility Sub-contractor fabrication of pipe spools, erection, line-check,
punch killing and review hydro-testing packages. inspection of instrument air compress
system, installation of tubing and manifold arrangement,
Feb-1990 – may-1991 HITACHI PLANT ENGINEERING & CONSTRUCTION (M) SDN BHD
Project HITACHI CHEMICAL PLANT ( PASIR GUDANG, JOHOR )
Position PIPING SUPERVISOR
Responsibility Supervision of construction works and line-check,
witness for pressure test with client and re-instatement.
July-1989 - April-1990 FOURSEA ENGINEERING PTE LTD (SINGAORE)
Project SEMBAWANG SHIPYARD PTE LTD ( SINGAPORE )
Position PIPING SUPERVISOR
Responsibility Supervision of copenrican fire fighting pipe, pre-fabrication and installation works on
new oil rig module project, identity pipe and fitting material as per standard procedures
and specifications, review test-packages and witness of hydro-testing.
Aug-1987 – march-1988 APECO ENGINEERING PTE LTD (SINGAORE)
Project ESSO OIL COMPANY PTE LTD ( PULAU ULAR, SINGAPORE)
Position PIPING & MECHANICAL SUPERVISOR
Responsibility Supervision one unit of 250 ton boiler erection works,
boiler tube panel and piping installation, punch-killing and
review test-packages, witness of hydro-testing .
June-1983 - Oct-1984 TOYO ENGINEERING MALAYSIA SDN BHD
Project PETRONAS GAS PROCESSING PLANT (KERTEH, TERENGGANU)
Position PIPING SUPERVISOR
Responsibility Supervision of pipe fabrication, erection, line-check, punch
killing and review hydro-testing packages.
July-1981 – July-1982 JURONG ENGINEERING LTD (SINGAPORE)
Project SERAYA CHEMICAL PLANT ( JURONG ISLAND)
Position PIPING FOREMAN
Responsibility Responsible for pre-fabrication and erection of pipe works,
install, line-check and testing activities,
May-1980 – May-1981 FOURSEA ENGINEERING PTE LTD (SINGAPORE)
Project FAR EAST SHIPYARD LTD (SINGAPORE)
Position PIPING FOREMAN
Responsibility shop fabrication of pipe work, line-check and testing activities
June-1979 – Feb-1980 JURONG ENGINEERING LTD (SINGAPORE)
Project PETRONAS OFFSHORE (TERENGGANU )
Position PIPE FITTER & INSTRUMENT TUBING
Responsibility Installation of pipe and maintenance works at oil rig platform, fabricate and install of
stainless steel tubing to all control valve and control panel from main control manifold.
Sep-1978 – April-1979 JURONG ENGINEERING LTD (SINGAPORE)
Project KUWAIT OIL COMPANY ( MIDDLE EAST, KUWAIT )
Position PIPE FITTER
Responsibility Fabrication and install gas pipeline,pipe support, and hydro-testing activities.
July-1977 – July-1978 FOURSEA MARINE SDN BHD (JOHOR)
Project MSE SHIPYARD AND ENGINEERING SDN BHD ( JOHOR
Position PIPE FITTER
May-1976 – May-1977 KIAN TAT ENGINEERING SDN BHD (MALAYSIA)
Project KANGAR CEMENT PLANT ( PERLIS )
Position FITTER & WELDER