NAME : PETER LEONG KOK WAH

NATIONALITY : MALAYSIAN

DATE OF BIRTH : 04-MAY-1956

NRIC NO : 560***-**-****

PASSPORT NO : A 50315424 ( Expiry 13-MAR-2023 )

CONTACT NO : +601*-****** . +601*-*******

CONTACT ADDRESS: NO 225, KAMPUNG BARU CHENDRONG,

BATU GAJAH, 31000, PERAK. MALAYSIA.

EMAIL ADDRESS : adivqg@r.postjobfree.com

COMPUTER KNOWLEDGE: MICROSOFT OFFICE EXCEL, MICROSOFT OFFICE WORD.

LANGUAGES SPOKEN ENGLISH, MALAY & MANDARIN

WRITTEN: ENGLISH, MALAY & CHINESE 12 YEARS STUDY

QUALIFICATION

.Direct craftsmen activities, through craft supervision, within the area of responsibility.

.Implement and enforce policies, procedures and related work rules as established by field

construction management.

.Assist superintendents in the preparation of construction methods, schedules, manning

charts, material and equipment requirements.

.Ensure safety standards and requirements are implemented and adhered to by craftsmen

and other when in the operational area, tools and equipment are in safe condition and

operated safety.

.Responsible for field construction operations within assigned discipline or area.

.Determine manpower requirements. Coordinate established area operational plans.

schedule work to be performed and review works accomplished by each craft.

Monitor sub-contractor activities to ensure compliance with specifications and schedules.

.Coordinate activities with other disciplines or areas and clients resident representatives as

instructed by construction management.

.Responsible for line checking, punch killing, modification, hydro testing and supervision of piping works during commissioning, and maintenance till completion. Coordinate of hydro testing with client and contractor.

COURSE ATTENDED

.Attended Oil And Petrol Chemical Safety Supervisor ( Singapore )

.Attended Certificate For Shipyard Safety Supervisor ( Singapore )

.Attended Welding inspector Course By American Welding Society ( Singapore )

.Attended Safety Induction Course Labuan Shell Supply Base ( Sabah )

.Safety Scaffolding Course At Sribima Training Centre ( Lutong Miri, Sarawak )

.Safety Offshore Diving Supervisor Course At Sribima Training Centre ( Lutong Miri, Sarawak)

.Attended Offshore Safety Supervisor Course ( Malacca )

EMPLOYMENT HISTORY

Mar-2019-30 Dec-2019 SAPURA ENERGY BERHAD (LUMUT MALAYSIA)

Project PEGAGA INTERGRATED CENTRAL PROCESSING PLATFORM MODULE

Position piping superintendent

Responsibility Supervision for all piping erection control, line check with my supervisor to clear

and kill the owner walk-down punch-list, check and confirm the field instruction

works and re-instatement works.

April-2016- 31 Oct-2018 SIEMENS GERMANY (MALAYSIA) SDN BHD

Project PENGERANG COGENERATION PLANT (PCP) JOHOR, MALAYSIA

Position PIPING SUPERVISOR

Responsibility Supervision for sub-contractor piping pre-fabrication and installation for GRP pipe and

HDPE underground piping, Line check and punch killing, testing & re-instatement and

commissioning activities .

July-2015-Feb-2016 CHINA PETROLUEM ENGINEERING & CONTRUCTION CORPORATION (CPECC)

Project OILWELL PIPING PROJECT (SOUTH SUDAN, AFRICA)

Position SITE MANAGER

Responsibility Supervision for sub-contractor piping pre-fabrication and erection work and

Fully in-charge and control for the project.

Jan-2015 – May-2015 TECHNIP MALAYSIA SDN BHD

Project SHELL MALIKAI MODULE, TLP DEEPWATER PROJECT (MMHE) JOHOR,MALAYSIA

Position PIPING SUPERINTENDENT

Responsibility Supervision for sub-contractor piping pre-fabrication, erection of pipe works, line check

Review of test-packages, to kill and clear punch-lists item and re-instatement works.

Sept-2014 – Nov-2014 FOSTER WHEELER (MALAYSIA ) SDN BHD

Project ARKEMA LYCHEE PROJECT ( KERTEH, TERENGGANU )

Position PIPING SUPERVISOR

Responsibility To kill and clear the owner walk-down punch-lists, check and confirm the field

instruction works and re-instatement work

Mar-2014 – Aug-2014 MMHE MALAYSIA MARINE HEAVY ENGINEERING SDN BHD

Project GUMUSUT KAKAP FBS SHELL MODULE PROJECT

Position PIPING TESTING AND RE-INSTATEMENT COORODINATOR

Responsibility Fully in-charge for testing and re-instatement coordinate activities, with other

Disciplines or clients resident representatives as instructed by construction management.

Responsible for hydro-testing and supervision of pipe works during coordinate of

Hydro-testing with client and contractor.

Feb-2013- Feb-2014 SARWAJA TIMUR SDN BHD (KUCHING, SARAWAK )

Project PALM OIL MILL REFINERY PROJECT ( BAU, SARAWAK)

Position PIPING INSPECTOR & MECHANICAL SUPERINTENDENT

Responsibility Supervision for sub-contractor erection of boiler panel plate, install inspection, Shop

Fabrication of boiler pipe and production pipe works.

July-2012 – Nov-2012 M+W HIGH TECH PROJECT (MALAYSIA) SDN BHD Project SYNTHOMER MONOMER RECOVERY PROJECT (KLUANG )

Position PIPING INSPECTOR SUPERVISOR ( Revamp Project )

Responsibility Supervision for sub-contractor piping pre-fabrication, line-check, punch-killing and

review of testing packages.

Feb-2012 – June-2012 RANHILL WORLEY PARSON ( MALAYSIA ) SDN BHD Project LNG REGASIFICATION OFFSHORE PROJECT ( MALACCA )

Position PIPING SUPERINTENDENT

Responsibility Supervision of sub-contractor piping prefabrication, erection and line check, Involve in

final re-instatement activities, Responsible for construction pre-punch and punch killing.

Feb-2011 - Dec-2011 EKA AKZONOBEL COPORATE (Chlorine dioxide plant ) Project SABAH FOREST INDUSTRIES SDN BHD (SIPITANG, SABAH)

Position ASSISTANCE SITE MANAGER

Responsibility Handle hold project of piping and equipment, fabrication and site erection works.

Mobilize for site activities as manpower control, machinery, crane and fully support a for contractor, prepare for punch-list test packages and site test activities

Dec-2009 - Aug-2010 TOYO ENGINEERING & CONSTRUCTION SDN BHD ( MALAYSIA )

Project NIPPON ELECTRIC GLASS CO, LTD ( SHAH ALAM, KL )

Position QS, QC & MECHANICAL SUPERVISOR

Responsibility Carry out of drawing, identity quantity of material to order. Supervision fabrication, fit-up

and visual inspection, Monitor daily manpower and progress report.

Feb- 2008 – Feb - 2009 SEALINK ENGINEERING & SLIPWAY SDN BHD (MIRI, SARAWAK)

Project 61.2 METER SUPPLY VESSEL

Position SHIPYARD PIPING SUPERINTENDENT

Responsibility Supervision of sub-contractor piping pre-fabrication, installation, line check, punch

killing and review of hydro-testing packages and witness of hydro testing.

April-2006 - April-2007 JGC MIDDLE EAST FZE, QATAR BRANCH ( QATAR)

Project QACO ETHYLENE PLANT, EXPANSION PROJECT ( MESAI, QATAR )

Position CONTRUCTION PIPING SUPERVISOR

Responsibility Supervision construction works and test package, to liaise piping design and various

Field change, supervise invalid re-instatement during general shut down.

Oct-2004 - Dec-2005 KNM ENGINEERING SDN BHD (GABANG, KUANTAN)

Project EXXON MOBIL OFFSHORE PROJECT ( TERENGGANU )

Position SENIOR PIPING SUPERVISOR

Responsibility Supervision of fabrication pipe spools, dimension check, x-ray, shop-testing,

sand plasting and painting, packing and transport.

Aug-2002 – June-2003 SARWAJA TIMUR SDN BHD (KUCHING, SARAWAK )

Project SEJINGKAT POWER STATION EXPANSION PROJECT (KUCHING)

Position PIPING SUPERVISOR

Responsibility Supervision construction works and line-check, pressure testing, re-instatement

to clear the construction and owner punch-list.

May-2001–March-2002 SARWAJA TIMUR SDN BHD (KUCHING, SARAWAK)

Project MLNG EXPANSION PROJECT (BINTULU, SARAWAK)

Position STRUCTURAL PLATFORM & PIPE SUPPORT SUPERVISOR

Responsibility Supervision of fabrication structural platform, and pipe support material, bending works

marking and fit-up works and visual inspection

Nov-2000-April -2001 SECULAR MECHANICAL CONTRACTOR PTE LTD (SINGAPORE)

Project REVAMP PROJECT OF DOP PLANT (BANGKOK, THAILAND)

Position PIPING & MECHANICAL SUPERINTENDENT

Responsibility Supervision hold project piping and equipment fabrication and installation works,

dismantle of drums, vessel, columns, piping and re-install the new equipment and

piping during shut-down, line-check, pre-punch, punch killing and hydro-testing activities.

Feb-2000 – Oct-2000 PHILIPP MULLER P+ H SDN BHD GERMANY

Project FIRST CILICON WATER FAB PROJECT (KUCHING, SARAWAK)

Position PIPING SUPERVISOR

Responsibility Supervision of sub-contractor fabrication, erection, line-check, punch-killing and

Re-view of hydro-testing packages.

Sep-1998 - Sep-1999 SANKYU ENGINEERING & CONSTRUCTION MALAYSIA

Project KVCM CHEMICAL PLANT (KERTEH, TERENGGANU)

Position CONTRUCTION MECHANICAL SUPERVISOR

Responsibility Fully supervise installation and erection of 2 units cracking heater(500 ton) equipment

platforms and ladders (210 ton), visual inspection for welding and punch-list

item, and hydro-testing activities.

May-1997- July 1998 APECO ENGINEERING PTE LTD (SINGAPORE)

Project CHEMICAL PLANT, PULAU SERAYA ISLAND (SINGAPORE)

Position PIPING SUPERVISOR

Responsibility Supervision of sub-contractor fabrication, erection, line-check

killing and review of hydro-t punch testing packages.

OCT-1994 – Oct-1996 HITACHI PLANT ENGINEERING & CONSTRUTION (M) SDN BHD

Project 50th STOREYS LION TOWER, JALAN AMPANG ( KL, MALAYSIA)

Position PIPING & MECHANICAL SUPERVISOR

Responsibility Supervision of chilled water pipe, Fcu, Ahu, Pump, chiller and cooling tower installation

works, Responsible for construction pre-punch and punch killing, review of hydro-testing

packages and witness of hydro-testing.

June-1993 – July 1994 APECO ENGINEERING PTE LTD (SINGAPORE)

Project SENOKO POWER STATION ( SINGAPORE )

Position PIPING SUPERVISOR

Responsibility Supervision sub-contractor piping pre- fabrication, erection, line-check,punch killing a and review of hydro testing packag and witness of hydro-testing activities.

Sep-1991 - Oct-1992 APECO ENGINEERING PTE LTD (SINGAPORE)

Project TUAS POWER STATION (TUAS, SINGAPORE )

Position PIPING & INSTRUMENT TUBING SUPERVISOR

Responsibility Sub-contractor fabrication of pipe spools, erection, line-check,

punch killing and review hydro-testing packages. inspection of instrument air compress

system, installation of tubing and manifold arrangement,

Feb-1990 – may-1991 HITACHI PLANT ENGINEERING & CONSTRUCTION (M) SDN BHD

Project HITACHI CHEMICAL PLANT ( PASIR GUDANG, JOHOR )

Position PIPING SUPERVISOR

Responsibility Supervision of construction works and line-check,

witness for pressure test with client and re-instatement.

July-1989 - April-1990 FOURSEA ENGINEERING PTE LTD (SINGAORE)

Project SEMBAWANG SHIPYARD PTE LTD ( SINGAPORE )

Position PIPING SUPERVISOR

Responsibility Supervision of copenrican fire fighting pipe, pre-fabrication and installation works on

new oil rig module project, identity pipe and fitting material as per standard procedures

and specifications, review test-packages and witness of hydro-testing.

Aug-1987 – march-1988 APECO ENGINEERING PTE LTD (SINGAORE)

Project ESSO OIL COMPANY PTE LTD ( PULAU ULAR, SINGAPORE)

Position PIPING & MECHANICAL SUPERVISOR

Responsibility Supervision one unit of 250 ton boiler erection works,

boiler tube panel and piping installation, punch-killing and

review test-packages, witness of hydro-testing .

June-1983 - Oct-1984 TOYO ENGINEERING MALAYSIA SDN BHD

Project PETRONAS GAS PROCESSING PLANT (KERTEH, TERENGGANU)

Position PIPING SUPERVISOR

Responsibility Supervision of pipe fabrication, erection, line-check, punch

killing and review hydro-testing packages.

July-1981 – July-1982 JURONG ENGINEERING LTD (SINGAPORE)

Project SERAYA CHEMICAL PLANT ( JURONG ISLAND)

Position PIPING FOREMAN

Responsibility Responsible for pre-fabrication and erection of pipe works,

install, line-check and testing activities,

May-1980 – May-1981 FOURSEA ENGINEERING PTE LTD (SINGAPORE)

Project FAR EAST SHIPYARD LTD (SINGAPORE)

Position PIPING FOREMAN

Responsibility shop fabrication of pipe work, line-check and testing activities

June-1979 – Feb-1980 JURONG ENGINEERING LTD (SINGAPORE)

Project PETRONAS OFFSHORE (TERENGGANU )

Position PIPE FITTER & INSTRUMENT TUBING

Responsibility Installation of pipe and maintenance works at oil rig platform, fabricate and install of

stainless steel tubing to all control valve and control panel from main control manifold.

Sep-1978 – April-1979 JURONG ENGINEERING LTD (SINGAPORE)

Project KUWAIT OIL COMPANY ( MIDDLE EAST, KUWAIT )

Position PIPE FITTER

Responsibility Fabrication and install gas pipeline,pipe support, and hydro-testing activities.

July-1977 – July-1978 FOURSEA MARINE SDN BHD (JOHOR)

Project MSE SHIPYARD AND ENGINEERING SDN BHD ( JOHOR

Position PIPE FITTER

May-1976 – May-1977 KIAN TAT ENGINEERING SDN BHD (MALAYSIA)

Project KANGAR CEMENT PLANT ( PERLIS )

Position FITTER & WELDER



Contact this candidate