Land Surveyor and Civil Engineer

PS – certified National Council Examiners for Engineering and Surveying. NCEES Professional Land Surveyor and Mapping with experience in site construction and earth work.

PE- certified (NCEES) Professional Civil Engineer with experience on the construction of infrastructure, utilities, geotechnical, structure, highways, sewer, and drainage.

Skills

Engineering Professional Personal

Project management People management Attention to detail

Site Supervision Customer Focused Problem solving

Multitask Discipline Plan & organize a team effort Safety conscious

Spanish – English Bilingual

Duties

Knowledge and understanding of construction execution, management, budget, and the time frame schedule. Inspect project sites to monitor progress and ensure conformance to design specifications. Preparing progress reports and providing support in the preparation of technical reports, cost estimates and contract documentation. Organizing human and material resources on site. Knowledge in Computer Software applications (Microsoft Project, Prolog, ACAD, Bluebeam and MS Office: Excel, Word, Power Point). Ability to interpretation construction drawings for all disciplines (Land Surveying, Electrical, Mechanical, Civil Site and Structural).

CAREER HISTORY

AFL Construction. August 2020 to Present

QA/QC Manager (Florida)

Project Budget: 5 MM

Average hour per week -56

Focuses on making sure the processes are functioning correctly to fulfilling quality requirements standards, and specifications.

Interpretation of construction and shop drawings, specifications, and Submittals for Civil, Mechanical and Electric contract drawings.

Perform constructive stakeouts for structure and infrastructure.

Perform and coordinate inspections and determine quality assurance testing models of raw materials and finished products.

Participate in Kick off meetings, Pre construction meeting to support new activity for construction management.

Review quality of all materials at site and ensure compliance to all project specifications

Prepare, document, and execute specification test, and defect inspection reports.

Develop, document, 5990013program quality, and metrics reporting system.

Assist with employees to ensure knowledge of all quality standards and ensure compliance to all quality manual and procedures.

Monitor and coordinate materials and procedures testing or inspection such: Proctor soil compaction tests, reinforcement rebar installations, formwork inspections and concrete test according to applicable codes, best practices and specifications.

Prepare and approved subcontractor employee payroll.

Verified shop drawings to comply with contract scope.

Randall Mechanical Inc. September 2018 to September 2020

QA/QC Manager

Operation Technician (Florida)

Average hour per week -56

Projects Budget: 200,000 - 35 MM

Projects: Mizkan Vinegar manufacturing - JW Marriott- Disney MBA Experience-Disney Riviera Resort - Pio-Pio Restaurant –MCO Airport

Quality Assurance and Quality Control Manager on the construction for the Orlando International Airport Terminal C Airside.

Determining in-house quality procedures, standards, and specifications. assessing customer requirements and ensuring that these are met, setting customer service standards.

Interpretation of construction and shop drawings, specifications and Submittals for Civil, Mechanical and Electric contract drawings.

Perform topographic, mapping, and constructive stakeout.

HVAC commissioning and testing. Equipment and specification compliance inspection. Perform and coordinate inspections and determine quality assurance testing models of raw materials and finished products.

Prepare, document, and execute detailed test plans, test cases, and defect reports.

Review and approve quality requirements for manufacturing planning, supplier purchase orders, and engineering specifications to ensure contract compliance.

Develop, document, and audit practices, program quality, and metrics reporting system.

Assist with employees to ensure knowledge of all quality standards and ensure compliance to all quality manual and procedures

Manage lifting of all equipment’s and handle efficient storage.

Review quality of all materials at site and ensure compliance to all project specifications.

Monitor and coordinate materials and procedure testing and inspections such: Pipe pressure test, Air Duct Leakage test, HVAC equipment, fire wall pipe- duct penetrations and welding test according to applicable specifications, codes, and best practices.

Work Coordinate and perform final inspection with the City Inspector, manufacturer and owners.

Automatization of fire smoke and evacuation system. Programming Variable frequency drives and smoke and fire dampers system.

Lifted and installed heavy steel architectural structure, Determinate center of gravity and erecting plan.

Prepare, document, and execute specification test, and defect inspection reports.

Perform constructive stakeouts for fire & chilled water pipe, air ducts, equipment and Sewer infrastructure.

Assembling Air handing units, and water/ air flow controls.

Coordinate, Installed, city-owners inspection for Commercial kitchens and restrooms.

Start-up and testing water pumps system and their automatization controls.

Start-up and testing HVAC system and their automatization controls.

Inspection of sanitary and sewer System for commercial and industrial building.

Fortaleza Construction April 2018 to September 2018

Project Manager (Panama)

Average hour per week -48

Project Budget: 100,00-450,000

Project: Storages Buildings Plaza -Beach House at Punta Chame

Submit Request for Information.

Oversee the construction project from start to finish.

Perform a key role in project planning, budgeting, and identification of resources needed

Review and approve Owner and Subcontractor monthly request for payment.

Interpretation of construction and shop drawings, specifications, and Submittals for Civil, Mechanical and Electric contract drawings.

Management and supervision of all employees at work site.

Stakeout installed and inspected 60” pipe drainage system.

Evaluate proposals and quotes for potential subcontractors and vendors.

Prepare and submit Breakdown for Payment, Cash Flow Projection, AIA Certifications and Invoice.

Coordinate the installation of Structural Steel erection.

Coordinate the construction of retaining walls.

IBT Group October 2016 to December 2017

Project Manager (Panama)

Average hour per week -48

Project Budget: 45 MM

Project: Meteti Hospital

Consult modifications with architects and engineers for best practice or better result.

Planning schedule executions and Submit Request for Information.

Oversee the construction project from start to finish.

Daily supervision to ensure the safety of the project.

Evaluate proposals and quotes for potential subcontractors and vendors.

Management and supervision of all employees at work site.

Managed the preparation of extended overhead, adjustment, changes orders and cost claims.

Attends progress meetings, develops status reports, and delivers presentations to superiors.

Daily meeting coordination with Supervisor and Foreman to assign and delegate responsibilities

Resolves field construction problems in coordination with engineering staff, third parties, and other agencies.

Perform a key role in project planning, budgeting, and identification of resources needed

Review and approve Owner and Subcontractor monthly request for payment.

Interpretation of construction and shop drawings, specifications, and Submittals for Civil, Mechanical and Electric contract drawings.

Develop, document, and audit practices, program quality, and metrics reporting system

Prepare and submit Breakdown for Payment, Cash Flow Projection, AIA Certifications and Invoice.

Provide management and supervision for construction project, monitor the progress and schedules and adjust resources as require to archived Milestones.

Coordinate all subcontractor activities and their logistics.

Prepare drawings to create rough-in required by the submittal equipment for blood Laboratory, -Xray, operation room and other special rooms.

RTD Construction August 2015 – October 2016

Field Engineer (Georgia)

Average hour per week -48

Project Budget: 10-22 MM

Moultrie Wastewater Plant Expansion- Atlanta Wastewater Plant – re-built

Interpretation of construction and shop drawings, specifications, and Submittals for Civil, Mechanical and Electric contract drawings.

Stakeout or layouts for equipment, instrumentation, steel reinforcement, formwork, yard pipes, structures, Mechanical & Electrical Equipment and infrastructure on the construction of a 6MGD Wastewater Facility Plant.

Prepare as built drawings on Civil 3D.

Perform a key role in project planning, budgeting, and identification of resources needed.

Revises flow process and equipment coordination to comply with contract flow diagrams and specifications.

Layout reinforcement rebar on structures and formwork.

Inspection of work performed by subcontractors.

Manger and coordinator of the installation of formwork for concrete structure.

Earthwork/Grading skateout, coordination for the construction of roads, pipes installation and structures.

Omega Engineering Inc. August 2012 – February 2015

Project Manager (Panama)

Average hour per week -48

Project Budget: 35 MM

Project: School of Fine Arts

Negotiation modifications with architects and consulting engineers.

Submit Request for Information.

Oversee the construction project from start to finish.

Management and supervision of all employees at work site.

Perform a key role in project planning, budgeting, and identification of resources needed

Review and approve Owner and Subcontractor monthly request for payment.

Review and approve all time and material work voucher and invoices.

Interpretation of construction and shop drawings, specifications, and Submittals for Civil, Mechanical and Electric contract drawings.

Maintain and update monthly project schedule in MS Project.

Evaluate proposals and quotes for potential subcontractors and vendors.

Managed the preparation of extended overhead, adjustment, changes orders and cost claims.

Prepare and submit Breakdown for Payment, Cash Flow Projection, AIA Certifications and Invoice.

Prepare drawings to create rough-in required by the submittal equipment.

Daily meeting coordination with Supervisor and Foreman to assign and delegate responsibilities

Attends progress meetings, develops status reports, and delivers presentations to superiors.

Resolves field construction problems in coordination with engineering staff, third parties, and other agencies

Maintain good relations and communications with all involved in the project including the public.

Earthwork/Grading skateout, coordination for the construction of roads, sewer and structures.

Develop, document, and audit practices, program quality, and metrics reporting system.

Quality Engineers & Assoc.. / MUBA Group June 2001 – Agosto 2012

Project Manager / Resident Engineer / Superintendent (Puerto Rico)

Average hour per week -48

Project Budges: 30-60 MM.

Projects:

Polytechnic University Expansion’ Construction of the following buildings: Engineer Laboratory building, Physics Classroom building, Library Building, Parking Garage and Multipurpose building.

‘Ciudad Interamerica’ was a developing of low-cost housing that accommodated 440 Units. The project was start on the drawings table to be completed in 2 year, this included the earthwork all infrastructure such: Sanitary Pump station, relocate an 38k power line, completed storm system and potable water. This project was award by the government as the best low-cost housing Program.

Urb. Adoquenes’ was a luxury housing development. 115 Units with recreational facility. The project was start from the earthwork to the final high-quality product.

‘’Plaza del Mar’ construction of front beach Building apartments, that required soil improvement and set back right of ways from ocean.

Solarea- Construction of front beach apartments. The development was from start to finish.

Plamar del Mar Yacht Club and Marina’ Construction of the building and the pre-fabricate marina boat slip that included the improvement of the water breaker and dredging of the marina bay.

Overseeing the actual construction as Owens representative.

Review and approve Owner and Subcontractor monthly request for payment.

Manage the day-to-day working.

Co-ordinate the efforts of all parties involved in the project, which include the architects, consultants, contractors, sub-contractors and laborers.

Read, utilize and interpret design drawings and topographic maps.

Developing, Survey and Construction Planning for all infrastructure, structures and facilities.

Daily supervision to ensure the safety of the project.

Attends progress meetings, develops status reports, and delivers presentations to superiors.

Prepare and approved employee payroll.

Daily meeting coordination with Supervisor and Foreman to assign and delegate responsibilities.

Prepare and submit Breakdown for Payment, Cash Flow Projection and Invoice.

Resolves field construction problems in coordination with engineering staff, third parties, and other agencies

Review and approve Owner and Subcontractor monthly request for payment.

Earthwork/Grading skateout, coordination for the construction of roads, sewer and structures

Prepare and submit Breakdown for Payment, Cash Flow Projection, AIA Certifications and Invoice.

Inspection of work performed by subcontractors.

Interpretation of construction and shop drawings, specifications, and Submittals for Civil, Mechanical and Electric contract drawings.

Interpretation of Soil Report recommendation and Site earthwork and Pile foundations inspection.

Manager and coordinator for Concrete pours.

Participation on design program meeting to select or recommendation of the architecture space program and engineering design requirement.

In charge of the construction, planning and logistic schedule.

Participation the design on housing lot and street distribution to be more efficiency on the earthwork and the infrastructure requirements.

Participate on Erosion and water break studies for the implementation of prevention programs on the erosion coast and ocean water current.

Surveying for dredging and marine pile installation.

Miramar Construction June 1999 – May 2001

Project Engineer (Puerto Rico)

Average hour per week -40

Project Budges: 5-30 MM

Projects:

Belts Factory Outlet Mall Canovanas; Shopping Center

Guaynabo Municipal Emergency Management Office and Disaster Response : Storage Garage and office.

Construction execution, management, budget, and program schedule.

Manager for Pre-Cast Structure, Construction and erection for tilt walls for Shopping Center, Parking, and Warehouse.

Surveying or skateout of structure and utilities.

Manager and coordinator for SOG and Pre-cast concrete pouring.

• Earthwork/Grading skateout, coordination for the layout of structures.

• Daily meeting coordination with Supervisor and Foreman to assign and delegate responsibilities.

• Attend and resolves field construction problems.

Manger and coordinator for installation of formwork on concrete structure.

Levitt Homes June 1997 – May 1999

Land Surveyor (Puerto Rico)

Average hour per week -40

Project Budges: 5-30 MM

Projects:

Camino del Mar: Housing Development

Encantada: Housing Development

Person in charge (Professional Land Surveyor) of the survey crew for layout plats Housing Lot, Street, Sewer, utilities and earthwork.

Calculation for all the skateout, earthwork, Right of ways, boundaries and sewers.

Preparation of legal boundaries descriptions.

Preparation of plot plans.

Las Piedras Construction June 1995 – May 1997

Land Surveyor (Puerto Rico)

Average hour per week -40

Project Budges: 5-10 MM

Projects:

PR 53 Highway

PR 177 Road

Surveyor in charge for the stakeout of earthwork road, bridge, storm sewer and utilities

Calculation for all the skateout, earthwork, Rigth of ways, boundaries and sewers.

Calculation for road alignment, vertical and horizontal curve, super elevations and establish horizontal and vertical controls.

Others Project and Duties (Puerto Rico) June 1990 – May 1995

Facilities Administrators Manager and Surveying Laboratory Instructor (Polytechnic University)

HVAC & Electrical: Coordinator on pharmaceutics industry. (Standard Refrigeration.).

Municipality of Mayaguez; Land boundaries, right of ways and legal descriptions.

Banco Popular de PR: Inter for computer sciences BS, programing Center.

EDUCATION

Polytechnic University of Puerto Rico May 1995

BS in Civil Engineering (ABET accredit university)

B.S.C.E; that include differential and integral calculus, statics, dynamics; strength of materials (stress-strain relationships); fluid mechanics, hydraulics; thermodynamics, structures, water resources, highway, water supply, geotechnical, concrete, foundations courses.

University of Puerto Rico, Mayagüez Campus May 1990

BS in Surveying and Mapping (ABET accredit university)

Interamericana University of Puerto Rico, Metro Campus July 1986

BS in Computer Science

CERTIFICATIONS

Professional Engineer License #80896. (Florida)

Active member of the Puerto Rico Professional Collage of Engineers and Land Surveyor.

Professional Land Surveyor License #12530. (Puerto Rico)

Florida Professional Surveyor and Mapper License in process (Florida Jurisdictional Exam)

Professional Engineer License #20236. (Puerto Rico)

OSHA 30

Continuous education program to renew professional licenses.



Contact this candidate