Post Job Free

Resume

Sign in

Power Plant Manager

Location:
Jaipur, Rajasthan, India
Posted:
December 21, 2020

Contact this candidate

Resume:

Avinash

Kumar D

ixena

Phone:

: +**-

******

*1773

Email:

: avi

nash.d

dixena

16@gma

ail.co

m

avina

sh_dix

xena@y

ahoo.c

co.in

Seeking Managerial assignments in Operations & Maintenance with a growth oriented organization.

PROFESSIONAL SYNOPSIS

A dynamic professional with over 16 years of rich experience in Commissioning, Operations & Maintenance. Presently working in 2x660 MW units. Associated with Adani Power Rajasthan Ltd., Kawai as a Senior Manager in Operation department.

Currently working as a Unit Incharge for Main Plant-Operation department & Taking complete responsibilities for all activities in BTG & BOP area.

Functional expertise in handling the plant operations & maintenance with key focus on bottom line profitability by ensuring optimal utilization of resources.

Proficiency in managing maintenance of various equipments for reducing downtime and enhancing operational effectiveness of equipment.

Co-ordinate with SLDC & NRLDC and maintenance department.

Comprehensive knowledge about various Parameters likes DSM, DC/SG, Station availability, Stack emission Norms and maintaining them as per the Government regulations.

Adept in managing erection & commissioning activities involving resource planning, in-process inspection, team building and co-ordination with Internal / External Departments.

Excellent communication & interpersonal skills with strong analytical, team building, problem solving and organizational abilities.

ORGANISATIONAL EXPERIENCE

Tenure Company Name Designation

25/09/2012 to TILL DATE Adani Power Rajasthan Ltd. Senior Manager-Operation Kawai- Rajasthan 2*660MW IPP

Super Critical Thermal power plant

17/07/07to05/09/2012 Vedanta Aluminum Limited, Associate Manager(Operation) Jharsuguda, Orissa Captive power plant

( 9X135 MW)

OCT’04– JULY 07 Nalwa Steel And Power Limited, Sr. Engineer (Operation) Raigarh, (C.G) [24 MW Captive Power Plant

CORE COMPETENCIES

Main Plant Operation 2*660 MW super Critical Thermal Power Plant

Business Performance

Objective- To operate and maintain Kawai TPP (2*660 MW super critical unit) with high operational reliability and efficiency

Currently working as a Unit Incharge for Main Plant-Operation department & Taking complete responsibilities for all activities in BTG & BOP area from 1st January 2020.

Worked as a shift in charge till 31/03/2019.

Worked as a Team Leader in operation & Efficiency department from 01/04/2019 to 31/12/2019.

Effectively Co-coordinated with all shift in charge & unit Controller for smooth operation.

Effective Coordination with operation & maintainace team members during emergencies arise in plant operations.

Adherence to approved operation KPI’s as station heat rate/APC/SOC/DM water consumption.

Lead the operation Team during 5S/IMS/Technical audits.

Taking the responsibility for smooth cold/warm/hot start-up, normal operation, emergency handling and shutdown of units.

Regularly check process parameter & trial of critical & non critical equipments for ensuring the equipment availabilities to achieve the desire parameters without any failure of failure of equipments.

Ensuring the effective manpower utilization with taking care of proper development of team members by developing the performance oriented work culture.

Good & Effective co-ordination with maintainace /planning/condition monitoring team for improvement of plant efficiency & developed strong safety culture.

Follow up all safety, Environment and Health standards in all functional area and developed & implemented measures for enhancing safety levels.

Ensure Line up of the unit and its auxiliaries, Changeover of equipments, testing of protection system and annunciation system in all shift.

Ensuring proper functioning of PTW (Permit to Work) system, Safe isolation, personnel safety.

Co-ordination with SLDC to maintain Schedule generation and Normalization /shutdown of 400 KV transmission line.

Business Sustainability

Objective-Reduction of coal Loss/Statuary Compliance on time/project Disha substance

Limit quality and quantity loss of coal after receipt to 1.5%.

Ensured controllable operation loss is maintained within limit by systematic monitoring and ensuring continual improvement in SHR.

Ensured 100% implementation of SOP’s.

100% compliance in all related statuary compliances.

100% closure of all audit points of 5S/Technical audits/DISHA on time.

Active participation in implementation of IMS in the plant. Also certified as internal auditor by Four-D in the plant

Ensure substance of project Disha by achieving process compliance of more than 98%

Process Enhancement

Objective- Enhancing reliability and efficiency of power plant.

Execution of station excellence projects to improve overall efficiency of plants.

Actively participated station excellence project of modification in vacuum system which resulted in improvement in Heat Rate.

Actively participated in commissioning of MOIS-System in boiler.

Worked as a Team Leader in SIX SIGMA –Water conservation projects & Awarded by Green Belt by COO of the Group.

Worked in Heat rate improvement/APC reduction team to achieve our Targets.

Commissioning of first supercritical unit in Rajasthan

Involved in Commissioning of 2*660 MW supercritical plants for Main Turbine & its auxiliaries from first day & successfully completed COD of Both Units.

Major activities & achievements are followings.

Turbine area MOVs & CV Commissioning.

Condenser flood Test.

Pre-Boiler alkali flushing.

Steam Blowing of gland steam piping.

CW interlocks Checking & its trial operation.

Turbine & its auxiliaries interlock protection checking.

Stabiles the operation of Condensate & feed water system.

Turbine rolling & testing at 3000 rpm.

First time synchronization with grid.

COD of Both Units in April 2013 & December 2013.

Man Management

Directing, leading and motivating workforce; imparting continuous on job training for accomplishing greater operational effectiveness/ efficiency.

Working on succession planning of the workforce, shift management activities, appraising the member’s performance & providing feedback.

Resolving interpersonal issues & working towards a harmonious work environment.

Safety Culture

Objective- To ensure that no fatality happens and safety culture is deep rooted through Project Chetna implementation.

Actively participation in developing relevant process and system and ensure behavioral training of subordinates to sustain consciousness and culture within department.

Work towards vision ZERO HARM at APRL Kawai.

100% Compliance of PTW system and JSA system.

Participated in Incident investigation for assigned near miss cases.

Barrier Owner from Operation department for FSIPP of H2-Plant.

Conduct Department safety committee meeting >70%.

Conduct Tool Box Talk with employees & workers to enhance safety culture.

Work place inspection.

TECHNICAL PREVIEW

(9*135 MW Captive Power Plant in Vedanta Aluminum Limited, Jharsuguda) Erection & Commissioning:

Anchoring on-site erection & commissioning activities and ensuring completion of project within the time & cost parameters and effective resource utilization to maximize the output.

Installation and commissioning of the heavy equipments as well as conducting tests & inspections to ensure operational effectiveness of plant & utilities.

Reviewing engineering drawings, layouts, diagrams, technical specifications, cost estimates for erection

& commission of the plant; reviewing & analyzing contractor's change order proposals & submittals.

Successfully completed the erection of main turbine in its auxiliaries in phase-2(4*135 MW Units) with proper safety & Zero Harm with in time frame. Major activities completed during project are…..

Turbine erection of 4 units 135 MW

Turbine auxiliaries Erection

HP /LP heater Erection

Condenser fabrication & erection

CW Pump Erection

CW Piping

HP /LP Piping’s

Turbine lube oil system

De aerator Erection

Turbine Proper Drains

Alignment of Major Eq.

Commissioning /Testing

Involved in Commissioning of Main Turbine & its auxiliaries in phase-2 & successfully completed its COD of Four units.

Operations & Maintenance

Taken complete responsibilities as a shift in charge for all activities of BTG & BOP area in a shift.

Cold start up, Hot Start up, Warm start up, Normal operation, Emergency Handling and safe shut down of units.

Line up of the unit and its auxiliaries, Changeover of equipments, testing of protection system and annunciation system.

Issue and cancellation PTW ( Permit To Work) system, Safe isolation, personnel safety and equipment safety

Monitor plant operations and handle emergencies including shut down of units and load throw off to control generation as per requirement.

Instruction to Desk & Field operators for safe operation of power plant.

Monitor the loading of Machine and co-ordinate with load dispatch

Emergency Equipment Trial and restoration of process and Equipment. Operation & System improvement

After handover operated the unit up to full load @ 100% PLF

Build up SOP for all operation activity.

Optimize Specific coal consumption.

Identified the area of Heat loss and Improve station Heat rate.

Controlled emission to the environment < 50 mg /m3

Optimization of APC< 9.5%

Optimize Cost of generation.

NOTABLE ACHIEVEMENTS

Performed a vital role in the implementation of Grid Islanding scheme to save plant from total black out.

Green belt I SIX SIGMA Project.

Certified IMS-Internal auditor by Four-D.

Implementation of PTW & LOTTO System.

DISHA Process Champion in Fuel Oil Management system.

Qualified in GATE- 2004 with 96.06 percentile.

Education and professional development

Course Institute Board/Univ. % of marks/DGPA

B.E.

(MECHANICAL)

(1998-2002)

G.E.C. Rewa

R.G.P.V. Bhopal 81.55 %

First (HONS)

XIIth

(1997)

BSP H S

SCHOOL,BHILAI(DURG)

M.P. Board, Bhopal 74.88 %

Xth

(1995)

GOVT. H.S. SCHOOL

PALI(BILASPUR)

M.P. Board, Bhopal 67.00%

PERSONAL DETAILS

Date of Birth : 16 October 1979

Marital Status : Married.

Language known : English& Hindi.

Father’s Name : Sitaram Dixena

Notice period : 2 Months

Residential Address

S/o SITARAM DIXENA.

Near New Bus Stand

Post – Pali

Distt - Korba

Pin- 495449



Contact this candidate