VIKAS RAJPUT
adit8o@r.postjobfree.com
linkedin.com/in/vikas-rajput-975-***-****
PROFESSIONAL EXPOSURE
FEEDBACK POWER OPERATION AND MAINTENANCE SERVICES PVT. LTD
Assistant manager, 80MW CPP HZL Zawar mines Udaipur
Roles & Responsibilities:
Operation & Efficiency Handling Emergency of 1X80 MW power plant like islanding of unit, tripping, safe shut down & start-up of unit. Responsible for production planning as per demand, tracking boiler efficiency daily basis & prepare strategy for loss reduction.
Prepare MIS of production details & analyse data for giving technical support to plant head for taking critical decision Identify & implement Energy Saving schemes and initiatives for improving plant processes and reduction in overall cost.
Optimize the “auxiliary power consumption” & implement new technology to improve plant performance by reducing “thermal loss”. Tracking performance of new technology & suggest modification in the system.
Actively involved in process optimization by identifying critical process of the plant & maintain process capability within limit. Involved all subordinates in KAIZEN for improving process
Hands on experience in SAP PM, Online PTW system.
Process improvement Projects, PFMEA, process audit to find out deviation & improvement opportunity. Preparing process score card & RCA for process deviation. Use 7 QC tools for performance improvement & analyse data by using MS Excel.
Projects– Revamping of 80MW BHEL Turbine into 91.5MW Siemens Turbine.
PRAXAIR INDIA PRIVATE LIMITED (may 2018-July 2020)
Senior Engineer, HyCO Operation HGU, Indian Oil Refinery Paradip
Operation and maintenance of all electrical equipment in 8.75t/hr Hydrogen Generation Unit at Indian Oil Refinery Paradip.
Hands on experience in Reliability cantered maintenance (RCM), Asset Life Cycle, Asset Criticality analysis, Risk Management framework,, Maintenance Best Practices and Strategies
Plan and implement Preventive maintenance/ Corrective maintenance of Field electrical equipment viz motors, transformers, switchgears, VCB, ACB, Contactors, batteries, VFDs, areas at HV/LV voltage levels.
Preparing Standard Maintenance Procedure, task lists, and manpower estimation for major maintenance of electrical equipment.
Right now, desire to be part of a successful operation and work
For an organization which can offer significant career development
Opportunities.
DCS Operation (300MW Power Plant)
Operation excellence- SOPs, SMPs
Performance & Efficiency Calculation
Maintenance Planning
SAP PM,
Boiler Operation Engineer (B.O.E.)
Budgetary and Cost Control
Inventory and Vendor Management
Sustainability &Process Improvement
Energy Management System
Time Management
Quality, 5S, kaizen
People development & engagement
PERSONAL ATTRIBUTES
Strong interpersonal skills, specific to persuasion, influence, and negotiation
Strong analytical and problem-solving skills
Pro-active in decision making
Ability to assist junior staff work through barriers to achieve organizational objectives
Excellent oral, written, and interpersonal communication skills to facilitate effective conversations with internal and external stakeholders
Ability to adapt well to changing priorities
Outstanding organizational skills
Exhibit participative leadership
ACADEMIC DETAILS
PGDC (Thermal Power Plant Engineering),
National Power Training Institute,
Nangal, 2012 - 2013 (78.80%)
B.E. Electrical Engineering,
Shri Shankaracharya College of Engineering & technology,
Bhilai, 2008 - 2012 (70.65%)
Class 12th (CBSE)
Jawahar NavodayaVidyalayaBorai,
Durg2007 - 2008 (80.4%)
Class 10th (CBSE)
Jawahar NavodayaVidyalayaBorai,
Durg, 2005 - 2006 (79.2%)
CERTIFICATIONS
Boiler Operation Engineer,
Govt. of Chhattisgarh, 2016
INTERESTS & HOBBIES
Travelling, Event management
PERSONAL DETAILS
Address: Village- Bundeli, Saja, Bemetara
Chhattisgarh, 491331
Date of Birth: 10th September 1991
Languages: English, Hindi
VEDANTA RESOURCES PLC- BALCO,
Bharat Aluminium Company Limited Korba,
Assistant Manager (1200MW)
Oct 2013 – May 2018
Major Responsibilities:
Desk Engineer- Operation of 4*300 MW Coal fired thermal Power Plant, startup, shut down and Routine Operation. ( Oct2013- May 2018)
To control desk operations from control rooms. Rolling up to rated speed, unit synchronization and loading to full load.
control room operations of the B TG set, monitoring parameters and taking contingency operations as required,
To carrying out various tests such as Boiler protection tests, Turbine Protection tests, over speed test, partial and full load operations.
HP-LP heater by-pass operations, Hot banking of Boilers,Water and steam chemistry, handling black-outs, safe shut-down and preservation
To monitor plant equipment's from control room as well as from field. To ensure safe isolation of the equipments
To operate the unit at optimum level in ABT regime. To manage entire operations with key focus on the optimal utilization of resources
To assess heat rate and advice for improvement, economic machine loading configurations
Day to day coordination with Maintenance sections for equipment outage plan and execution
Initiatives:
Reduced by 15%, the cost of production by process optimization & rectifying major defects using LEAN.
Led a team of 5 engineers, ensuring savings of INR 0.6crore per Light up for reduction in Specific Oil Consumption.
Member of Continuous Improvement project team for Increase in Boiler efficiency by 0.5%, yielding yearly savings of INR 1mn.
Responsible for organizing the fleet management system of the Coal Handling Unit across all the shifts
Handled processes under SAP modules and MIS and actively involved in continuous improvement projects
Trained and mentored 16 new GETs to initiate seamless induction into plant operations of 300MW unit size.
Proposed the identification and record keeping of hazards and near miss for ensuring plant 5S
Created a team of Quality Circle ‘USHMA’ for compressed air Optimization in plant.
Achievements:
Received Achievement Award for outstanding performance in turbine area during unit start-up
Rewarded with a cash prize INR 9,000 for continuous improvement of the vacuum system of turbine
Successfully Completed Overhauling of 300Mw Unit at CPP-3 Balco with Implementation of MOCs.
Completed all Mill Overhauling and Combustion air Optimizations Project which results in Increase in PLF up to 103%