Post Job Free

Resume

Sign in

Architect

Location:
Abu Dhabi, United Arab Emirates
Salary:
12000
Posted:
December 19, 2020

Contact this candidate

Resume:

Curriculum Vitae

PRELIE NINA GAN

CONTRACT NUMBER: +971*********

EMAIL: adis4x@r.postjobfree.com

EDUCATION:

BACHELOR OF SCIENCE in ARCHITECTURE

TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES April 1998 – March 2002

DIPLOMA in ARCHITECTURE TECHNOLOGY

TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES June 1994 – March 1997 YEARS OF EXPERINCE: 11 YEARS (GCC) & 6 YEARS (PHILIPPINES) REPRESENTATIVE EXPERIENCE

August 2013 at Present: Architect Engineer

United Engineering Construction L.L.C. (UNEC), Abu Dhabi, UAE

Prepares, review and selection of architectural materials are in compliance with approved material submittals to the ADEC & MUSANADA.

Producing detailed workings, drawings and specifications.

Regular site visits to check on progress, ensuring that the project is running on time

Project managing & Co-Coordinating the work of Sub-Contractors in Shop Drawing.

Prepares managing and helping to coordinate to work the construction team. Project Undertaken:

ARJAAN ROTANA, Abu Dhabi National Exhibition Center Abu Dhabi Future School Program, Phase 2, Package 4, kindergarten Abu Dhabi Future School Program, Phase 4, Package 4, Cycle 2 & 3 for Girls Abu Dhabi Future School Program, Phase 5, Package 2, Cycle 2 & 3 for Boys Night Market & Boardwalk, Palm Deira Dubai

Al Reem Integrated Hospital, Al Reem Island - present April 2012 at February 2013: Architect Engineer

Gulf Human Resources Development

Second Employee: UTE ABENER TEYMA, Shams 1 SOLAR PLANT Madinat Zayed Western Region, Abu Dhabi, UAE

Prepares Shop Drawing for the issuance of Consultant Approval.

Prepares Daily Report (Work Progress) submitted to Client and Owner

Prepares the Work Permit to be use in site and Approval by the Consultant

Prepares and organizes file system e.g. general drawing files and requirements.

Prepares As-Built Drawing for Project complete

November 2008 at January 2012: Architect Engineer

BENYAN DEVELOPMENT COMPANY (BDC), Abu Dhabi

Prepares and Checking Shop Drawing for the issuance of Consultant Approval.

Coordinates with the MEP & Structural Design.

Project managing & Co-Coordinating the work of Sub-Contractors in Shop Drawing.

Controlling a project shop drawing from start to finish.

Prepares As-Built Drawing for every Project complete.

Prepares and organizes file system e.g. general drawing files and requirements.

Coordinates with other construction groups and specialty contractors pertaining to technical problems during work progress.

Project Undertaken:

FINANCE HOUSE 5 Storey Commercial Building (Nazda st. Abu Dhabi)

COMMERCIAL BUILDING 9 Storeys Building (Mussafa, Abu Dhabi)

FINANCE HOUSE HEAD QUARTERS (ADNEC Complex, Abu Dhabi)

ABU DHABI POLICE GENERAL HEAD QUARTERS (Muroor Road, Abu Dhabi) June 2004 at October 2008: Retail Tenant Coordinator / Project Coordinator SM RETAIL INCOPORATION, Manila, Philippines

Work with the Retail Development team and Senior Management to create and update a SOP (Standard Operating Procedure) for all facets of Retail Tenants Coordination

Liaise with Retail Development/SM Retail PM to manage variation pricing, approval and instruction.

Liaise with Retail Development/SM Retail PM to implement Base Build provision into designs.

Liaise with Retail Development/SM Retail PM to implement Base Build provision on site

Liaise with Retail Development/SM Retail PM to compile Lease Outline Drawing (LOD).

Establish specific MEP requirement and information and include in Tenant Design & Fit-Out Manual (TDFOM)

Establish specific MEP milestones during fit-out and include in TDFOM.

Responsible for the approval of the full technical elements of the tenant’s submission including tenants fit- out program.

Final inspection & authorization of completion certificate.

Verify Tenant’s Municipal approvals.

Liaise with Retail Development to follow up tenant rectification program, update snag list and provide status reports (weekly, daily where required).

Create and maintain of a tenant general contractor rules and regulations manual.

Prepare progress report on the current status of the tenant coordination process and advice on all necessary action and follow up’s to meet targets.

Create a filing system as part of SOP and identify and maintain the physical location files.

Ensures accurate filing of all information, so as to enable the company to refer to have as built drawings as to serve as a point of reference. This includes all digital format, landlord and statutory documentation.

Overseas field verification and measurement surveys of tenant spaces to ensure accuracy of information.

Monitors and confirms when tenant spaces are ready for handover and conducts handover procedures.

Conducts weekly walk-thru and inspections of all tenant spaces under construction/fit-out to determined construction/fit-out progress.

Handles project bidding and cost evaluations.

Prepares all working drawing and specification.

Project Undertaken: Shopping Mall / Commercial Building

SM CITY SUCAT / SM STA MESA RENOVATION / SM CITY BACOOR / SM CITY LASPINAS

SM ASINAN WAREHOUSE

June 2002 at December 2003: AUTOCAD OPERATOR

HOUSING RESEARCHES DEVT. PTE SINGPORE, Cavite, Philippines

Prepares Auto Cad Drawing for the issuance to the main office in Singapore. SEMINAR ATTENDED

Project Management Seminar

3Fold Education Centre, Abu Dhabi UAE, August 2012

GREEN ARCHITECTURE SMX Convention Center Philippines December 2008

Seminar in AUTOCAD 2007 & REVIT BUILDING 9.0

SM Corporate Office June 2008



Contact this candidate