Strategic leader with 14 years of engineering project management and operations experience in support of commercial and data center real estate holdings for large financial institutions in NY Metro area. Responsible for the project development and implementation of mission critical infrastructure and ancillary support systems in addition to testing and commissioning of electrical and mechanical systems; while ensuring uptime availability. Strong computer and technology background with extensive field-testing experience. Professional Experience:

STRUCTURE TONE, INC, New York, NY

MEPS Superintendent / MEPS Commissioning Coordinator / Project Manager, September 2017 – Present.

• Directed the day-to-day coordination of MEP trade contractors and their sub-contractors to ensure they turned out high-quality work that met the approved project schedule and was in compliance with all project specifications.

• Created and developed documentation in order to record changes made to project work plan necessitated as a result of significant design or work scope changes.

• Responsible for possessing and maintaining a comprehensive understanding of the contract documents for the purpose of planning ahead with a focus on anticipating potential problems before they arise.

• Tasked with verifying that all subcontractors obtained all necessary permits and required insurance documentation for all projects.

• Acted as a safety representative in the field and enforced quality control policies as per company and OSHA standards.

• Lead contractor meetings on a regular basis. The type of meetings that I lead included; Pre-Construction (Kick-off) meetings, Construction Meetings, Project Team (Progress) Meetings, Contractor and Sub-Contractor Meetings, Pre-Installation Meetings, Project Close-Out Meetings, and Project Warranty Meetings.

• Created, managed, and updated the project schedule. This included building two and four week look ahead schedules as well as implementing contingency plans if and when necessary.

• Clearly communicated schedule status, updates and changes to the entire Project Team and all Trade Contractors.

• Worked with all relevant parties to facilitate solutions to jurisdictional disputes. MEPS Commissioning Coordinator:

Responsible for providing professional construction services and meeting the challenges unique to each project and project team. In addition to possessing the personal goal of being well regarded by both peers and sub trades alike. As MEPS Commissioning Coordinator, my duties included providing coordination and guidance throughout the duration of the day-to-day MEPS project work. I was able to perform this function by utilizing my considerable knowledge of data center construction and the personal lessons learned from over a decade of experience working on various projects. Many of these projects included aggressive schedules and were comprised of multiple complex phases of work. In my capacity as MEPS Coordinator, I remained onsite full-time throughout the duration of the project overseeing the entire electrical and power scope of work. While on-site, my primary role was to monitor and perform the necessary inspections to ensure the proper installation of all electrical work. This included overseeing the electrical contractors and working together with the Technical Services Department to ensure the highest quality of skill and workmanship was provided to all clients. I also provided engineering suggestions for the procurement of long- lead equipment during the preconstruction phase of the project. AKF GROUP LLC, New York, NY

Electrical Project & Commissioning Engineer, May 2006 – August 2017.

• Providing strategic guidance and oversight of project management and engineering operations for large financial firms in the NY Metro Region. Specific tasks include but are not limited to acting as liaison with senior design engineers, consultants, subcontractors, suppliers, inspectors, and owner's representatives in resolving issues related to plans, specifications, testing and commissioning of mission critical infrastructure and ancillary systems.

• Managing and maintain the key leadership role in the development and coordination of the client relationships to assist with business development and analysis of mission critical infrastructure requirements and deficiencies.

• Overseeing and making decisions related to contract drawings and subcontract information.

• Ensuring that all drawings and specifications properly relate to the estimates Assessing conformance to contract specifications to ensure QA/QC requirements are met.

• Resolving any operational conflicts in interpretation and ensuring that the deliverable / milestones are met and that the project is delivered on time and on budget.

• Ensuring that materials and equipment are delivered as required by utilizing a tracking solution to monitor status and to maintain project schedule of these items post submittal approval until they arrive on site. Steven Corona 82 Cliffwood Avenue 22C Aberdeen, NJ, 07721 732-***-**** adirvq@r.postjobfree.com

• Establishing and maintaining document control procedures, developing and submitting reports and ensure strict adherence to safety, ethics and compliance requirements at all times.

Critical Systems Project / Program Manager:

Responsible for managing annual maintenance events and or power downs; which consisted of retro commissioning of the critical systems equipment at varying type facilities and the installation of new infrastructure. These duties include; but are not limited to creating detailed project plans with activities assigned to the appropriate vendors, contractors, and or engineers. Duties also included supervising and / or completing the scheduled work and verifying completion of all tasks within allotted time and budget. These projects included the installation of UPS systems, generators, maintenance and testing of mission critical system components. Project Management tasks included field supervision of service technicians for maintenance and testing procedures such as performance response, functionality and the coordination of all engineers assigned to the specific tasks while reporting back to the client and or owner’s representatives. Post project tasks included punch list, close out documentation and creating and / or reviewing the final reports before presentation to clients. Commissioning Agent:

Responsible for performing peer reviews and preparing commissioning plans, specifications and functional testing scripts. Field responsibility included hands-on functional testing, managing and coordinating commissioning activities, factory acceptance testing, performing integrated system test and site acceptance testing and the preparation of the final reports and presentation to the client and or owners’ representatives. Data Center Assistant Project Manager:

Assistant Project Manager, for the installation of (26KV-13.2KV) Medium Voltage Substations and Distribution, Low Voltage Distribution, transformers, ATSs and generators for a major 2N design data center. Duties included the management of the project administrative tasks, coordination of project meetings, minutes and weekly report, field supervision and coordination of MEP trades. Relevant Experience:

Project Sycamore, New Jersey

MEP Project Engineer on the construction of a new out-of-the-ground data center for this financial client. The new data center is designed for a final capacity of 10MW.

Cyrus One, Somerset, NJ

MEP engineer on this project, which included the expansion of the client’s existing data center in Somerset, NJ. The new expansion totaled approximately 200,000sf and was successfully completed without disruption to the client’s active data center. PSEG, Bridgewater, NJ

MEP engineer for the construction of a new Utility Control Center (UCC) for PSEG in Bridgewater, NJ. The new facility is approximately 73,000sf and is designed and constructed to contain independent operation centers for both gas and electric utility services as well as a 2MW data center and an office space.

Project Sycamore, New York

MEP engineer on the construction of a new out-of-the-ground data center for this financial client. The new data center is designed for a final capacity of 10MW. Prior to construction of the data center, Structure Tone managed the abatement and demolition of approximately 32 buildings from the 60-acre site.

Education

DeVry University, North Brunswick, NJ

Bachelor of Science in Engineering, November 2013

Additional Skills

• Certifications: OSHA 10, OSHA30, NFPA 70E.

• Programming Skills: C, C++, Java, VHDL, HTML, XML, Matlab, and Assembly.

• Operating systems. MS Windows DOS/ 98/NT/2000/XP.

• Applications: MS-Word, Excel, PowerPoint, MS-Project.

• Communication: Concise and persuasive verbal and written communication skills

• Formal training and understanding of conflict resolution and contract negotiations and collective agreement.