PROFESSIONAL SUMMARY

Over twenty (20) years of work experience in Oil & Gas and related Petrochemical Industries on Major EPC projects in Greenfield, Brownfield, and Live Plant construction, such as LNG, Refinery, Turnaround, Module Fabrication, Gas Plant, Pump Station, FPSO, Offshore pipeline and other related Industries. Exposed in Piping Field Engineering and Mechanical / Piping supervision, such as fabrication, installation, inspection & testing of piping system, MTO, estimates, pre-commissioning /commissioning, equipment installation, tanks, as well as structural steelworks. With working knowledge and hands-on experience in using Engineering Software, such as SPR-Smart Plan Review and Autodesk 3D Navisworks, as well as MS Office) Word, Excel, PowerPoint, and Outlook). Conversant with the Project Specifications and International Codes and Standard.

EMPLOYMENT HISTORY:

March 2019 -Field Piping Specialist

Dec 2019 MET T&S Limited, MAIRE Tecnimont SpA,

Rapid HDPE Project P27, Pengerang, Johor – Malaysia

HDPE plant is an EPCC project (Engineering, Procurement, Construction and Commissioning) lump sum turn-key basis for an amount of approximately $328 MM and will have a capacity of 400 Mtpy.

•Perform on-site supervision and coordination of all subcontractors and responsible for the erection/installation of all piping works, including tanks and static equipment at site.

Execute field construction activities in conformance with project drawings, specifications, schedules, cost estimates, procedures, quality requirements, and safety standards.

•Make sure that the scope of work is achieved by the contract requirements and timeframe.

•Witness all the test of the piping system and make sure that the test limit is correct.

•Coordinate with the Engineering Manager and Project Engineer to identify and resolve technical problems encountered during the construction phase.

•Report to the Construction Manager for the mechanical completion progress.

•Make sure that the qualities of work on-site will comply with the HSE policy.

March 2017 -Construction Piping/Mechanical Supervisor

Oct.2018 MET T&S Limited, MAIRE Tecnimont Group / KT SpA,

SOCAR POLYMER PP and HDPE Project, Azerbaijan

The project is the construction of Polypropylene (PP) and High-Density Polyethylene (HDPE) Plants with a production capacity of 184 KTA and 120 KTA respectively.

•Supervise all piping activities at site, including quality inspection and testing, material take-off, including equipment installation, structural and cathodic protection for piping.

•Lead the piping construction team at the site to ensure effective and safe execution.

•Review AFC drawings, Specifications, and Procedures to be used for the constructions.

•Verify and inspect material delivery and make requests for the shortage to avoid delay.

•Perform all necessary walk down inspections of all piping systems before commissioning and complete all check sheets before start-up.

•Prepare and issue a Non-conformance Report (NCR) and Construction Technical query (CTQ) as necessary.

May 2013 - Senior Piping Field Engineer

May 2016 Brunel International South East Asia Pte. Ltd.

APLNG / WSLNG Module Fabrication, Bechtel OG&C Project, Indonesia

A construction/fabrication of 75 Modules and its part of the Bechtel’s three ongoing US$60 billion plant construction projects in Curtis Island, Australia; namely, the Australia Pacific LNG, Gladstone LNG, and Queensland Curtis LNG ports.

•Responsible for all the piping field engineering and construction activities on-site.

• Ensure that all method statement/procedures, installation manuals, and ITP comply with the project specifications, local regulations are meet the requirements of international codes and standards as a minimum

•Assist the Piping Superintendent during fabrication, erection, testing, and reinstatement before the completion of the piping system.

•To lead in preparing Piping Work Packages and Test Packages of all piping system

•Verify and inspect all piping materials arrived on-site to ensure that it complies with specifications, integrity and quality requirements of the project

•Raise technical queries such as FCD, NCR, or RFI during construction and solved and make an as-built drawing as the final design.

May 2012 - Project Engineer

May 2013 Bam Clough Joint Venture/Orion Group of Services (PNG) Ltd.

PNG LNG Jetty Marine Termina EPC III Project, Papua New Guinea

Scope of work. Construction of LNG and Condensate Offloading Jetty with a total value of US$ 261 million approximately.

•Assists the Construction Manager to ensure the planning and execution of the piping discipline of the project is conducted safely and effectively meeting the Company targets.

•Ensure that all method statements/procedures, installation manuals and ITP, complies with the project specifications, codes, and standards as a minimum

•Provide MTO’s and man-hour calculations from the Piping isometric drawings.

•Preparing field-purchasing quantities and must comply with the project specification

•Verify by inspections of all pipe installation at site if they erected correctly and safely.

•Prepare and issue site queries and provide solutions during construction.

•Prepare progress report and submit to the project control group.

•Manage all the Pressure Testing of piping systems, including the GRP pipeline.

Aug 2009 - Senior Piping Field Engineer

Oct 2011 Bechtel Oil, Gas and Chemical (OG&C) Angola LNG Project, SOYO, Zaire Province, Angola Republic

A construction of a 5.2 million-metric-ton-per-year liquefied natural gas (LNG) train, along with storage and marine loading facilities for LNG, liquefied petroleum gas (LPG), and condensate.

•Responsible for all the Piping Field Engineering works on-site to ensure project deliverables are met

•Provide technical assistance to the piping superintendent and crafts.

•Prepare MTO’s and provide FMR for material shortage to avoid delay.

•Prepare field change documentation and as-built documentation as required.

•Responsible for the development of piping work packages in conjunction with supervision.

•Witness all testing on-site and verify and check the test limit if it is correct.

•Perform all necessary system walk-down inspections before commissioning of all piping /mechanical items and complete all check sheets before start-up.

Aug 2006 - Piping Supervisor / Piping Field Engineer

May 2009 Bechtel Oil, Gas & Chemical (OG&C)

Second Generation Project/Sour Gas Injection (SGI / SGP) and Gas Utilization Project (GUP), TengizChevroil project – Tengiz, Kazakhstan

The project was the construction and commissioning of TCO Plant Expansion (SGP/SGI) with a Crude Production capacity of 11 MMTPY @ 17mole% H2S injection in SGI. The plant receives Oil, Gas & Water from the field and undergoes several processes such as Oil Stabilization/Gas Separation, Demercaptanization, Acid Gas Removal, Sulphur Recovery/Tail Gas Treating, Gas Dehydration/Fractionations & etc before Crude Oil, LPG/Dry Gas, Sulphur Storage and Sales via pipeline or rail.

Supervised fabrication and installation of pipework in Crude, Gas, Sulfur, HVAC, Power, and Utilities area.

•Assigned in Commissioning team as a Supervisor for the reinstatement of all pipe works as per site instruction including design changes

•Prepare work permits and Job Safety Analysis (JSA) for the required activity and identify isolation points of the energized system and make sure that all the permits were approved before the start of the work.

•Raise queries and provide solutions immediately as needed.

•In addition to the above responsibilities, I work as a Piping Engineer/Supervisor in SGI Shutdown and Gas Utilization project (Brownfield) and supervise the disinvestment and re-installation of new pipe spools, pipe supports, and steel structures, and provide queries for the site design problems.

June 2005 - Piping Engineer / Tank Engineer

June 2006 Chicago Bridge and Iron Company (CB&I)

EG LNG Train 1 Project, 136,000 M3 LNG TANKS, Malabo, Equatorial Guinea

•Manage all the Piping field engineering works at site and assist the piping superintendent during fabrication, erection, testing, including final reinstatement, and mechanical completion.

•To provide cutting lists for piping with reference from Isometric drawing for fabrication purposes.

•Also, assists the Tank Superintendent for the erection/installation of Tank Platform, stairs, and other structural steel.

•To solve any problems on-site issues in piping, structural, and tanks.

•Perform field take-off from the AFC drawings and prepare Field Material requisition.

•To inspect and monitor the piping material storage if it complies with the quality requirements.

•Monitor progress at site and provide the report as necessary.

•Prepare and provide As-Built drawings for final documentation.

Dec 2003 – Piping Engineer

May 2005 Chicago Bridge and Iron Company (CB&I)

Train 4 NLNG Plus Project, A Joint Venture of Technip, Snamprogetti, KBR & JGC (TSKJ Nigeria Ltd)

Scope. FEED, EPC. The plant will have an overall capacity of 16.8 million tons per year of Liquified Natural Gas (LNG) and 2 million tons per year of Liquified Petroleum Gas. It will also utilize about 2,800 million standard cubic feet per day of gas. Contract to TSKJ is valued at over $(US) 1.7 Billion.

•Review all AFC design drawings including the Bill of Materials, Project Standard, and Specifications of the project before installation and erection,

•Assists the Piping Superintendent in planning and scheduling of work.

•To provide MTO’s and prepare material requisitions for the project.

•Monitor and inspect fabrication and erection/installation of all pipe works.

•Prepares daily/weekly progress reports.

•To solve technical problems that arise in the field, provide the As-Built drawing and update the field engineering documents.

Nov 2002 - Piping Engineer

Apr 2003 Saipem Global Petroprojects Services AG

The Kuito 2A Upgrade Project (FPSO) Block 14, Angola

•Monitor and inspect all piping installation/erection if it is under the project specifications, procedure, and standard as well as with the project HSE policy

•Prepare MTO’s and request the material shortage to avoid delay.

•To solve piping design discrepancies at site and make an As-Built drawing, update the engineering documents.

June 2002 - Pipe Tracking System Inspection

Aug 2002 Saipem Global Petroprojects Services AG

The Thebaud to Alma Platform Pipeline Offshore Project, Canada

Verify/check all the pipe spools arrived onboard and verify the installation/erection at the site.

Aug 2001- Pipe Tracking System Inspection

June 2002 Saipem Global Petroprojects Services AG

Blue Stream Submarine Pipeline Project in Black Sea, Russia to Turkey Pipeline

•Verify/check all the pipe spools arrived onboard and verify the installation/erection at the site.

Dec 1997 - Piping Engineer

Nov 2000 Saipem Contracting Nigeria, Ltd.,

Ughelli Pump Station Development Project, Nigeria

To review all piping drawings and assist the superintendent in fabrication /installation of all pipe works at the site and make sure that they comply with all project Specifications, Procedures, and Standard.

•Issue CTQ and solve technical problems that arise in the field and make As-Built drawings and update field engineering documents.

•Provide MTO’s of all piping and structural materials in the project and provide MWR’s for material shortage.

•Witness all piping system’s pressure test to verify if they test correctly.

•Supervise tie-in works in Gas Plant and Flow Station area during shutdown.

•In addition to the above designation and responsibilities, I assist the Superintendent in doing the Piping Layout in Perro Negro 5 in offshore. Provide a new sketch and make the Bill of Material on the Isometric drawing we provided.

Sept 1994 - Building Mechanical-Electrical Maintenance

Dec 1997 Philippine Long Distance Telephone Company (PLDT), Philippines

Performs duties such as mechanical and electrical repairs, servicing and installation of AHU, Lighting system, Chilled water system, Condenser, and pumps as part of the preventive maintenance work.

Oct 1987- Piping - Mechanical Draftsman

June 1988 PNOC Dockyard & Engineering Corporation, Philippines

•Prepare working drawings for piping system installations such as freshwater system, cooling system, fuel oil system, lube oil system, and air conditioning system.

•Prepare and revise drawings, tracing, sketches, bill of materials, materials, and equipment specifications as required for a new building, ship repair/conversion shipyard facilities, and all other land-based projects.