Post Job Free

Resume

Sign in

Power Plant Electrical Engineer

Location:
Kolkata, West Bengal, India
Salary:
60000 per month
Posted:
December 14, 2020

Contact this candidate

Resume:

Prasun Dutta

E-Mail: adinsh@r.postjobfree.com/ adinsh@r.postjobfree.com

(M):+91-890*******/790-***-****

To obtain a challenging position in a growth oriented organization, whereby I can apply my skills to an environment where it will result in a significant impact. I have the passion to make difference and to build stronger business for the organization.

Synopsis

A value driven and highly competent Electrical Engineer with 10 years of experience in Electrical Sector; having sound knowledge of erection, testing and commissioning of electrical equipment. Expertise in Team Management and coordinating resources from inception to completion effectively to achieve targets within often stringent constraints. Ethical, loyal and maintain a high degree of confidentiality. Works well in diverse teams to achieve goals though effective communication and interpersonal skills.

Professional Qualification

Diploma in Electrical Engineering from Jnan Chandra Ghosh Polytechnic in the year 2006 with 76.5% of marks.

Key Skill

Construction Power Supply, Erection, Testing & Commissioning of Electrical Panels & equipments, Lighting work along with Power & Control Cable laying & termination. Erection & commissioning of Fire Fighting system & A.C system.

Presently Employed

Company : Civil Engineers Enterprises Pvt. Ltd

Designation: Assistant Manager (Electrical)

1) Location : Gangtok, Sikkim

Duration : January 2016 to present.

Functional Area: Erection, Testing, Commissioning of all Electrical installation with all services

Project Details: Currently working at 1000 Bedded Multispeciality Hospital at Sichey (Sochyagang) Gangtok Sikkim. Project Value is 525 Crores.

Nature of Works Involved:

In charge for the total Internal & External Electrification of entire project. total erection & Commissioning of 2 no 2500 KVA transformer with associated H.T & L.T panel.

Overall responsibility of Fire Fighting work along with smoke detection system for entire project.

Overall responsibility of A.C works both Chiller & DSU system for entire system.

Total Estimation & Contractor Billing of the above services.

In charge for the Construction Power supply of total project.

Previously Employed

Company : McNally Bharat Engineering Company Limited

Designation: Assistant Manager (Electrical)

1) Location : Jamul, Chhattisgarh

Duration : April 2013 to December 2016.

Functional Area: Erection, Testing, Commissioning & Construction power supply

Project Details: Currently working at 9000 TPD New Cement Plant of ACC at Jamul, Chhattisgarh with KHD Humbolt Wedag. Project Value is 1200 Crores.

Nature of Works Involved:

In charge for the Construction Power supply of Jamul expansion project. total erection & maintenance of 1 no 500 KVA transformer, 8 nos main PDB, 30 nos SPDB, 100 above earth pits & 1000 nos lights within an area of 3km.

Overall responsibility of LC#1 & 2 of mines area with all other equipments commissioning.

Checking of Insert plate installation for permanent installations.

Implementation of LOTOTO (Lock Out, Tag Out, Try Out), which is prime requirement of Electrical Safety.

Testing of HAND TOOLS, ELCB’s etc.

2) Location: Bellary

Duration : January 2012 to april 2014

Functional Area: Erection, Testing, Commissioning and Maintenance.

Project Details: Worked in 1000 TPD Coal Handling Plant of 500 MW power plant at Karnataka Power Corporation Limited, Kudithini Karnataka

Consortium leader is Bharat Heavy Engineering Limited.

Scope of Electrical and instrumentation installation is 750 ton.

Project value is 220 crores.

Nature of Works Involved:

Supervising the installation of electrical equipment of the CHP considering safety and the time bond, which include erection of panels, transformers, bus ducts, battery banks, cable laying, tray work and earthing.

Cable laying of PLC panel & termination with ferruleing.

In charge for the erection, installation, testing and commissioning of electrical equipments of the 1000 TPH Stacker & Reclaimer with a Wagon Tripler capacity of 30 wagon/hour.

Coordinating with the various departments for making arrangements of CEA inspection, documentation for the CEA (Central Electricity Authority) inspection and approval of CEA (for charging 11 KV and 3.3 KV power supply to the substations of CHP).

Permanent lighting of entire project.

Coordinator of the commissioning team for the testing, commissioning and Trail run of motors and equipments manually as well as remotely.

Running the whole plant using PLC for a period of 8 months.

Involved in the commissioning team of electrical equipments of CHP like Double Roll Crusher, Vibrating Screen, Conveyors & Flap Gates.

Maintenance of various electrical equipments.

3) Location: Visakhapatnam

Duration: June 2008 to January 2012

Functional Area: Construction Power supply, Erection, Testing, Commissioning and Maintenance.

Project Details: Worked in 6.3 MTPA expansion of Sinter plant #3 at Rashtriya Ispat Nigam Limited, Visakhapatnam Steel Plant, Visakhapatnam.

Consortium leader is Tyazhpromexports (TPE) Russia.

Scope of Electrical and instrumentation installation is 2200 ton.

Project value is 550 crores.

Nature of Works Involved:

In charge for the Construction Power supply of Sinter Plant#3. total erection & maintenance of 2 no main 630A PDB, 4 nos 400A PDB, 8 nos 125A SPDB, 30 above earth pits & 500 nos lights within an area of 1 Km With labour colony of 2000 labour.

Supervising the installation of electrical equipment of the sinter plant #3 considering safety and the time bond, which include erection of panels, transformers, bus ducts, cable laying, tray work and earthing.

Billing of installation of electrical and instrumentation equipments of Sinter Plant # 3, documentation of the protocol, interacting with consultants and the client for the inspection of the same.

In charge for the erection, installation, testing and commissioning of electrical equipments of the 2 nos Electro Static Precipitator.

Coordinating with the various departments for making arrangements of CEA inspection, documentation for the CEA (Central Electricity Authority) inspection and approval of CEA (for charging 11 KV and 6.6 KV power supply to the substations of sinter plant#3).

Coordinator of the commissioning team for the testing, commissioning and Trail run of motors as well as equipments of sinter plant#3.

Involved in the commissioning team of electrical equipments of Sinter Plant #3.

Maintenance of various electrical equipments Batching Plants, Concrete Pumps etc.

4) Location: Bikaner,Rajasthan

Duration: April 2007 to June 2008

Functional Area: Construction Power supply, Erection and Maintenance.

Project Details: Worked in Coal Handling Plant of 2X125 MW Power Plant at Neyveli Lignite Corporation Bikaner Rajasthan.

Project value is 230 crores.

Nature of Works Involved:

In charge for the Construction Power supply of CHP. total erection & maintenance of 2 no main 1000A PDB, 2 nos 630A PDB, 4 nos 125A SPDB, 10 above earth pits & 250 nos lights within an area of 3 Km With labour colony of 1000 labour.

Supervising the installation of electrical equipment of the CHP considering safety and the time bond, which include erection of panels, transformers, cable laying, tray work and earthing.

Maintenance of various electrical equipments Batching Plants, Concrete Pumps etc.

4) Location: Durgapur,West Bengal

Duration: September 2006 to April 2007

Functional Area: Erection

Project Details: Worked in Coal Handling Plant of 1X300 MW Power Plant at Durgapur Projects Limited, Durgapur West Bengal

Project value is 180 crores.

Nature of Works Involved:

Supervising the installation of electrical equipment of the CHP considering safety and the time bond, which include erection of panels, transformers, cable laying, tray work and earthing.

Maintenance of various electrical equipments Batching Plants, Concrete Pumps etc.

Educational Qualification

Higher Secondary: City School in the year 2002.

Secondary (Madhyamik): St Paul’s School in the year 2000.

Personal details

Name: PRASUN DUTTA

Fathers Name: PRADYUT DUTTA

Date of Birth: 18-07-1984

Age: 33 years

Nationality: Indian

Permanent address: 75, Sri Gopal Mullick Lane,

Bowbazar, Kolkata-700012

Present address: Civil Engineers Enterprises Pvt. Ltd

Lower Sichey, Housing colony

Gangtk, Sikkim-737101

Mother Tongue: Bengali

Marital Status: Married

Languages known: English, Hindi, Bengali.

Hobbies: Listening to music

Declaration

I, hereby declare that all the details furnished above are true to the best of my knowledge.

Place : Gangtok, Sikkim

Date :

PRASUN DUTTA

References: Will be submitted when required.



Contact this candidate