Post Job Free

Resume

Sign in

Engineer Chemical Engineering

Location:
Lagos, Nigeria
Posted:
December 12, 2020

Contact this candidate

Resume:

AZUGWU, ISIDORE C

Port Harcourt. Nigeria +***-816-***-**** (Mobile) +234-8181230210 (Home). e-mail: adimmh@r.postjobfree.com

TARGET POSITION

SENIOR PETROLEUM ENGINEER/ SENIOR PRODUCTION TECHNOLOGIST.

(Petroleum engineering: Well Surveillance, Production Optimization, Operations and Studies)

Versatile Petroleum Engineer with international experience. Demonstrated sound knowledge of integrated well planning, providing full life cycle well Completion design, facilitated well delivery process. Highly proficient in Well surveillance and Production optimization, Nodal Analysis - Well inflow and outflow modelling with IPM PROSPER and Network modelling with GAP, PIPESIM etc. Coordinated cross-discipline technical reviews/ peer reviews sessions as technical expert.

Championed Technology deployment of smart well completion, Sand Control, WSO, Stimulation and other Production optimization initiatives in Oil and Gas production, water flooding and Gas injection projects. Possesses technical capability to maximize cashflow/ NPV from marginal fields/wells by proactively seeking for opportunities and unlocking well potentials through well surveillance, Artificial Lift selection, Gaslift design/ optimization, well intervention (Workovers/ Rigless - CTU, W/L) while implementing cost reduction opportunities, reducing deferment & applying WRFM, DWOP & CWOP principles and practices.

Ensured robust project valuation, Budgeting, providing/challenging AFE well cost and well Economics evaluation (NPV, cash flow profile, pay out period etc). Jointly coordinated documentation of Best practices and standard operating procedures for Gaslift, Acid Stimulation, well commissioning, WIMS, wellwork proposals and post job reviews/ tracking method etc.

Successfully delivered integrated studies, multi-million dollar onshore/ offshore FR/ FDP projects on schedule and within planned cost. Led/ managed multi-racial teams, ensuring corporate HSE compliance.

Possesses sound knowledge of sub-surface aspects of Value creation/ realisation funnel in upstream Oil and Gas industry. Trained PTL facilitator, Good team player/ leader.

CORE COMPETENCIES AND ACHIEVEMENTS

Field review & Field development planning

Well planning, AFE, Economics evaluation.

Well design, construct, modify & Abandon

Inflow & Outflow Performance (IPM model).

Well /Reservoir Management & surveillance.

Damage & Inflow Performance improvement

Well completion, W/O & Rigless (CTU, W/L)

Standard procedure manuals/ Best practices.

Stimulation, WSO, Zone change, Fracking

Well Integrity & management systems (WIMS)

Production optimization, Gaslift design.

Sand failure prediction/ sand control design

Operate & maintain wells, Productn Chemistry

Presentation, First-Aider/ Heart Saver, HSE.

Coaching/Mentoring, Teamwork, Leadership.

Process streamlining/ optimization.

Field review & Field development planning.

Deliver Production Technology contributions in Field review (review/ investigate well performance, completion strategy, artificial lift etc) and integrate with other disciplines to understand the historical Field performance and identify opportunities. Identify development options (FDP) and select the optimum/most feasible option to develop the field.

Led KC FR/FDP team, provided P. Tech contributions for KC FR and CAWC FR (2 fields, 150 wells) in SIEP. Provided P.Tech contributions to Imo River FR/FDP Phase 1 and 2 in Shell Nigeria. Steered P.T challenge in VAR for D06/D08 Nembe Creek (3.0 MMMbbls STOIIP), Nigeria.

Well planning, AFE, Economics evaluation.

Integrated well planning in collaboration with surface and subsurface discipline. Provide Production technology inputs. Review well placement options, sub-surface targets, reservoir properties, seismic plays/ non-conformances, required well logs, estimated reserves and planned production, estimate well cost and economic indicators. Progress through Management reviews/ presentations for approval. Apply DWOP. Contributed to generated new Oil (18,000 bopd/yr) in Dukhan re-development. Provided completion design/ commission new wells 1,500 bopd per well).

Well Integrity & management systems (WIMS).

Manage integrity of wells to ensure operating within the safe envelope. Estimate MASP, request Annular pressure measurements and reports, recommend follow up actions and execute them (shut-in, work-over, Abandonment etc). Maintain a live database of non-compliant wells (Tubing leak, HCHP, Leaking Xmass tree/well). Functioned as Well integrity focal point in SPDC Nigeria, managed WIMS database, identified wells for integrity workover in SPDC and in QP.

Well design, construct, modify & Abandon.

Carry out conceptual design of wells including casing, tubing, downhole completion strategy etc. Challenge Drilling detailed design to conform with well objective. Monitor Rig operations and contribute to ensure KPIs are met, initiate/ follow up MOCs, Interpret cased hole logs and make recommendations to Rig for operations. Prepare abandonment proposals and follow up execution during Rig operations. Carried out well design in SPDC and QP for new wells, W/O wells & Abandonment wells. Successfully championed re-design observation wells in QP.

Well /Reservoir Management, Surveillance and Production optimization.

Carry out proactive daily surveillance/ monitoring of wells to ensure operation within safe envelope. Review well performance and identify sub-optimal wells. Recommend remedial actions and implement such as Bean change, Acid stimulation, water shut-off, Zone change, Rig repairs etc. Carry out gaslift design for wells. Install / operate gaslift and optimize by utilizing liftgas optimally and evaluating valve performance/ entire gaslift system performance. Unlocked potentials with cost savings from Stimulation ($30,000 per well).

Inflow & Outflow Performance (IPM model).

Generated well models with IPM PROSPER or other suitable software for field Oil wells, Gas wells, Water and Gas injection wells to predict future well performance. Used actual inflow measurement data including Productivity index, Pressure and Production test, Reservoir and fluid properties, downhole tubing completion data, Wellhead, Flowline parameters and Manifold information etc. Prepared well models in SPDC using different software SAM, WePS, Horvip, PIPESIM, IPM/PROSPER. Used IPM/PROSPER to generate well models in Dukhan field (more than 600 wells) Qatar Petroleum.

Sand failure prediction/ sand control design.

Utilize reservoir mechanical parameters, pressure information, fluid characteristics, log data etc to carry out sand failure prediction studies to identify reservoirs/ well drainage points with failure tendencies. Propose optimum Sand control methods for wells in the field.

Carried out FIST modelling for KC field and identified opportunities to optimize Sand control strategy with cost saving of $0.6M and oil gain of 600 bopd. Recommended a change of Sand control philosophy resulting in $1M savings. Monitored sand production in SPDC wells, identified wells with sand issues, recommended appropriate remedial action (W/O, Rigless repairs, Bean down, shut-in).

Damage & Inflow Performance improvement, Well completion, W/O & Rigless (CTU, W/L).

Review performance of wells and identify problem wells (high water-cut, High GOR, Low productivity, High sand production, Annular pressure, Tubing communication, Depleted/Flushed zones etc) for intervention. Identify cause of well impairment (drilling operations chemicals, LCM, Kill fluids, Drilling fluids, previous treatment chemicals, production practices) etc. Identify adequate treatment plan, method and procedure. Rank the wells based on cost, benefit analysis do-ability, complexity etc. Identified 12 W/O opportunities which generated + 12,000 bopd and restored integrity of wells.

Unlocked potentials with cost savings from Stimulation ($30,000 per well) in Dukhan field.

Coaching/Mentoring, Teamwork, Leadership, soft skills and HSE.

Mentored/ coached young Engineers in SPDC and QP until certified competent engineers. Assigned tasks and guided them through peer challenge, presentations/ reviews etc. Good presentation skills. Trained first aider, Fire/ safety marshal, Led/ cordinated unsafe Acts audit, Trained Heart Saver (CPR assistance). Contributed to prepare standard procedures and best practice documents.

PROFESSIONAL EXPERIENCE

1). Qatar Petroleum, Doha. Qatar (February 2007 - July 2020)

Dept: Operated Onshore Oil Field Development Position: Senior Petroleum Engineer.

Key Activities:

Actively participated in integrated well planning, provided technically sound P.T contributions and followed-up Rig operations. Collaborated with Operations to safely put online/ flow back/ test new wells (10/yr), validate test data, and delivered 1,500 bopd/well (7.2 MMbbls oil).

Delivered full Life cycle Completion Design for Oil producers, Water injectors, Gas Producers, Gas injectors, and observation wells. Managed field Water injection & Gas Recycling project.

Conducted detailed review of PWI wells stimulation and developed a statistical model to identify stimulation candidates/ successful jobs, identified production optimization candidates and prepared/issued Proposals for execution (800 bopd oil gain).

Developed maintained PROSPER IPM well models for new wells (25/ yr) until well is matured.

Carried out Gaslift design and optimization (FBHP, CO2 Tracer) & developed corporate best practice document in collaboration with operations team.

Participated in MDT jobs planning with REs & Petrophysiscists (selection of points for pressure sampling & pump-out) for fluid contact determination for new wells placement optimization.

Challenged multi-million project AFEs and delivered $1.0 M savings/yr. Managed/ developed automated corporate Well Economics evaluation template (NPV, Payout/ Breakeven point).

Coached/ mentored fresh graduates/engineers (6 engineers) across teams until maturity level.

Proactively conducted cement logs evaluation ($750K Rig savings) & managed job invoices.

Provided completion design for EOR wells for well prognosis, addressing Corrosion issues.

2). Shell Petroleum Development Company, Nigeria (Jan 2005 – February 2007)

Dept: Value Realisation and Surveillance Team (Asset)

Positions: - Team Leader (Acting capacity: 8 staff)

- Senior Production Technologist (Senior Petroleum Engineer)

Key Activities:

Managed staff & coordinated input into Business Plan. Field Review of brown field and PAFs.

Co-ordinated quarterly surveillance of all 10 fields in Swamp Team and issued corporate report.

Proactively conducted surveillance of 2 fields (150 wells & 300 Mbopd production), supported Reserves Audit & VAR, identified Oil generation candidates (Oil gain 5,500 bopd) & Integrity repair/recompletion candidates for Business Plan. Prepared Project Proposal Sheets (PPS).

Managed Production optimisation processes, Year Activity plan & forecast for input into IAP.

Led challenge sessions with Drilling for Rigless & W/O wells & supported operations (10/ yr).

Defended Asset team Budget expenditure for drilling activities (CAPEX) during JV Partners meetings and achieved their approval ($96 MM).

Represented IOC and made presentation to JV/ Government agency (DPR) to obtain approval for well work and completion operations (New wells) to generate 9,000 bopd.

Coordinated/ participated in selection of wells for RST, RPM (10 wells) logging (saving $100K).

Steered P.T challenge in VAR for Nembe Creek (D06/D08) further dev. (3.0 MMMbbls STOIIP).

Planned clean-up/test & Stimulation of NAG wells to deliver 100 MMscf/d to LNG project.

Key milestones:

Successfully Co-ordinated team to Corporate Short-Med. Term opportunities review (60 Mbopd).

Participated in the value assurance review (VAR) of Projects (VAR Approved).

Dept: Eastern Swamp Area Team (January 2001 - Dec. 2004).

Position: Senior Production Technologist (Senior Petroleum Engineer).

Key Activities:

Investigated scope and prepared business case for Smart well completion with ICVs, and PDHG, to commingle production. Successfully installed 2 completions in Cawc field.

Co-ordinated Asset team well integrity management system (WIMS), identified wells with integrity issues, recommended repair options and Prepared W/O proposals for their repair.

Coordinated the planning of side-track wells, new wells, W/O in Asset team.

Defended Asset team Budget expenditure during JV partners (SPDC, ENI, Total, NNPC) meeting.

Coordinated FDP of brown field with nearby prospects. FR optimisation. Coordinate V2V (RTL).

Key milestones:

Completion design of Eastern Swamp 1st & 2nd Horizontal wells, clean-up & testing to potential.

Completion design of 1st & 2nd Cased-hole Expandable sand screen (ESS) completion in AFRICA.

Completion design of 1st high rate Gas well (>150 MMscf/d) with ESS in SPDC, NIGERIA.

Completion design/exec. of 1st conventional well with standalone sand screen in SPDC 2004.

3). Shell International Exploration and Production, Netherlands. (July 1999 - Dec. 2000)

Dept: Integrated Regional Acreage & Field Development Services (EPT-AGI)

Position: Production Technologist (Petroleum Engineer)

Key Activities:

Prepared P.T work-scope and Timeline for Field Review. Identified wells with opportunities for repair/re-completion (12 Kbopd). Prepared fit for purpose Lift tables for Reservoir simulation.

Participated in integrated FDP and proposed completion design for infill Horz., ML wells.

Delivered PIPESIM network model for KC-offshore field form scratch, with the Production System Optimisation recommending lowering the Separator pressure (150 bopd gain).

Successfully conducted Sand Failure Prediction for KC field with FIST, recommended change in Sand Control strategy (saving $0.6M) with 600 bopd in Oil gain.

4). Shell Petroleum Development Company, Nigeria (March 1993 - June 1999)

Dept: Land Area Team (Production Engineering)

Position: Production Technologist (Petroleum Engineer)

Key Activities:

Conducted technically sound P. Tech input to Field Review and FDP of 250K bopd Imor field.

Monitored/ evaluated well performance, identified problem wells and proposed W/O or Rigless remedial actions (Stimulation, Water shut-off, Sand control, N2 lift, Zone change and Gaslift assistance). Issued job proposals and supervised successful execution (16K bopd).

Prepared well models, carried out VLP analysis and Gaslift optimisation (1,200 bopd gain).

Co-ordinated quarterly surveillance of all 15 fields in Land Team and issued corporate report.

Key milestones:

Completion design of 1st Horizontal well in Land Area, clean-up and testing to potential.

Educational Qualifications

B.Sc (Applied Chemistry), Nigeria.

P. G Diploma (Chemical Engineering), Nigeria.



Contact this candidate