Post Job Free

Resume

Sign in

Engineer Plant

Location:
Karachi, Sindh, Pakistan
Posted:
December 11, 2020

Contact this candidate

Resume:

MOHAMMAD ASIF

Cell: +92-345-******* (Whatsapp)

adiktf@r.postjobfree.com

** ***** ******* *********** ** a Chemical Engineer

(Process ~ Operation ~ Maintenance ~ DCS ~ SCADA ~ HMI)

(Erection ~ Pre-Commissioning ~ Commissioning ~ Startup Operation)

(Oil Refinery ~ Petrochemical ~Polymer ~ Utilities ~ Desalination MED 9Effect –MSF 2 Effect-SWRO-BWRO)

(EDI-DI ~ Wastewater Treatment ETP ~ STP ~ MBR-UF ~ MBBR ~ Chiller ~ AHU ~ Water Recycle R.O Plants) OBJECTIVE

Demonstrate the full value of my capabilities, in a learning and challenging environment by participating in the overall growth of an organization. EDUCATION

Bachelor (Honors) in Chemical Technology (04 years) Completed in May-2010 (University of Indus – H.E.C) Diploma of Associate Engineer in Chemical Technology (03 years) Completed in Dec-2002 (Sind Board of Technical Education) Matriculation with Science Group (02 years) Completed in Dec-1999 (S . S . C Board of Karachi) PERSONAL INFORMATION

Father Name Zaheer Ahmed Date of Birth 10th May 1982 Place of Birth Karachi, Sind, Pakistan CNIC Number 42101-1666458-3 Language Urdu, English Religious Islam, Muslim

Residence Address House no. 78/1, Sector 5-G, New Karachi, Karachi, Sind, Pakistan Passport no AT-1884583 valid till 2023 Visit to Oman, UAE, Malaysia, KSA CAREER HISTORY

Jawaid Bross. Label Industries Pvt. Ltd Karachi:

Job title: Engineer (ETP & R.O Plants Utilities Plants & Lab) Date of Re-Joining: 16th July 2019 to Present. Effluent Treatment Plant (Capacity – 3000 m3/day) Abamet Technology Reverse Osmosis Plant (Capacity = 4000 IGPD) Oman Oil Refinery & Petroleum Industries Companies (ORPIC) 04 months Contract of Suez Water Technologies & Solutions U.A.E. Job title: Water Treatment Engineer Date of Joining: 27th March 2019 to 11th July 2019 GE Water & Process Technologies (EDI Plant Capacity = 1080 m3/day) Location: Area-3, Utilities, Orpic Refinery, Muscat, Oman GE Water & Process Technologies (RO Plant Train 1 Capacity = 1560 m3/day) Location: Area-3, Utilities, Orpic Refinery, Muscat, Oman GE Water & Process Technologies (RO Plant Train 2 Capacity = 1200 m3/day) Location: Area-3, Utilities, Orpic Refinery, Muscat, Oman MED 9 Effect Plant Aquatech Technology. (Desalination Capacity = 800m3/day) Location: Area-3, Utilities, Orpic Refinery, Muscat, Oman MED 9 Effect Plant Aquatech Technology. (Desalination Capacity = 800m3/day) Location: Area-3, Utilities, Orpic Refinery, Muscat, Oman MSF 2 Effect Plant Aquatech Technology. (Desalination Capacity = 1800m3/day) Location: Area-3, Utilities, Orpic Refinery, Muscat, Oman Main Accountabilities / Responsibilities

Monitoring and controlling parameters of 2 pass R.O plants & Electro deionization system & its parameters of feed stream, product stream, concentrate stream, electrode stream, stack current, voltage, online resistivity, conductivity, flow rates, orp, pH, temperature co2, chlorine.

Monitoring and controlling by DCS yokogawa CS-3000.

Water Lab Testing & Control Parameters, TDS, TSS, PH, Co2, Color Test. Turbidity, Conductivity, Resistivity, Temperature, Chlorine, Silica.

Manage chemicals preparation and dosing according to all parameters.

Operate the MED 9 Effect Plant and MSF 2 Effect Plant Desalination for Boiler operation.

Used Sulfamic acid for flushing Plant.

Jawaid Bross Label Industries Pvt. Ltd Karachi:

Job title: Engineer (ETP & R.O Plants Utilities Plants & Lab) Date of Joining: 20th July 2018 to 22 March 2019. Effluent Treatment Plant (Capacity – 3000 m3/day) Reverse Osmosis Plant (Capacity = 4000 IGPD) Soorty Enterprises Pvt. Ltd Unit-13 Nooriabad:

Job title: Engineer (ETP & R.O Plants & Lab) Date of Joining: 09th January 2017 to 01st July 2018 Effluent Treatment Plant (Capacity = 3600 m3/day) ENTA Technology ETP, H&M Green & Leeds & ZDHC Certified Compressors Atlas Copco Rotary Crew Air Compressor Gardner Denver Artistic Milliners Pvt. Ltd Unit-14 Karachi:

Job title: In charge (ETP, R.O Plants & Lab) Date of Joining: 01st August 2016 to 08th January 2017 Effluent Treatment Plant (Capacity = 3000 m3/day) ABAMET Technology ETP, H&M Green & Leeds & ZDHC Certified Absorption Chiller Shuangliang Eco-Energy System Co. Ltd (Capacity = 300 ton/day) Compressors Atlas Copco Rotary Crew Air Compressor Gardner Denver Air Blowers Arzen Technology Artistic Fabric & Garments (Pvt.) Ltd Unit-02 Karachi: Job title: Engineer Operation (ETP & R.O Plants Utilities Plants & Lab) Date of Joining: 27th July 2015 to 29th July 2016 Effluent Treatment Plant (Capacity = 3000 m3/day) Joseph Egly Technology ETP, H&M Green & Leeds & ZDHC Certified Absorption Chiller JLR-16 Co. Ltd (Capacity = 300 ton/day) Compressor Atlas Copco & Kessar Yunus Textile Mills Pvt. Ltd Unit-04 Karachi:

Job title: Engineer (ETP & R.O Plants Utilities Plants & Lab) Date of Joining: 01stFebruary 2013 to 20thJuly 2015 Plant Capacity = 5500 m3/day ETP, IKEA Green Certified Effluent Treatment Plant (Capacity = 5500 m3/day) Membrane Bio Reactor MBR-UF (Capacity = 5500 m3/day) Recycled Reverse Osmosis Plant (Capacity = 5500m3/day) Rotary Crew Air Compressor Gardner Air Blowers Arzen Technology

Afroz Textile Industries Pvt. Ltd Karachi:

Job title: Internship at ETP & Utilities Plants Date of Joining: 16th June 2010 to 16thJuly 2010 Plant Capacity = WWTP=500000 IGPD, Reverse Osmosis Plant (Capacity= 2, 00000 IGPD) Pak Petrochemical Industries Pvt. Ltd Karachi:

Job title: Operation Engineer Poly Styrene Plant Date of Joining: 24thJanuary 2011 to 28thJanuary 2013 G.P.P.S Plant Capacity = 110,000 M.T/A

Pak Petrochemical is the producer of grade GPPS/ HIPS / EPS Resins in the Pakistan. Pak Petrochemical Industries was established to meet demand of Poly Styrene in Pakistan along with the vision to deliver our clients comprehensive solution our plant is the one and only Poly Styrene manufacturing plant of such magnetite in the region with increasing demands General Purpose Poly Styrene (GPPS) High Impact Poly Styrene (HIPS), and Expandable Poly Styrene (EPS), we have continuously and rapidly taken the initiative for massive expansion for immaculate performance. Equipments

Pre-Heater1 Pre-Polymerization Poly Styrene CSTR Reactor Polymerization Poly Styrene TPFR Reactors

Pre-Heater Final Polymerization Devolatilizers Compressor

Raw Material Storage Tanks Extruders Chips (Pellets) Dryers

Classifiers Cutter pelletizing unit Pneumatic Conveying System

Storage Silos Kinetic Centrifugal Pump Positive Displacement Gear /Melt Pump

Condenser

Raw Material and Additives:

Styrene Monomer Poly Butadiene Rubber Mineral Oil Stearic Acid

Zinc Stearate Calcium Stearate Anti-Oxidant Blue Color

Ethyl Benzene U.V Stabilizer Ethyl Butyl Acrylate R.C, EB Main Accountabilities / Responsibilities

Leading a Shift team and give different instruction to operator and technician and helpers and supervisors and fitters for different maintenance Jobs according to work permit and update and train to operators in different process areas of petrochemical plant.

Reviewing engineering drawings, layouts, diagrams, technical, S.O.P, erection & commission of the plant.

Planning and scheduling to achieve effective manpower deployment of qualified workforce.

Pre-Commissioning and Commissioning and Start up the Petrochemical GPPS/HIPS plants.

Shutdown and Start-up operations by adjusting and monitoring the alterations of speeds, temp, pressures and flow rates as necessary.

Co-ordination and supervision of the Petrochemical Plant Operation in a safe and efficient manner to give the production,

Independently Plant start-ups, Shutdown and emergencies as per established Plant operating procedures. Gamalux Oleo Chemicals Industries Pvt. Ltd Karachi: Job title: Asst. Engineer Date of Joining: 20thFebruary 2010 to 21stJanuary 2011 Plant Capacity = 180,000 M.T/A

Gamalux Oleo chemical is palm kernel oil by splitting tower and distillation packed column. Manufacturing the light distilled fatty acid oil, and distilled fatty acid oil, and soap bar and cooking oil and ghee. Gatron Industries Ltd Hub Baluchistan:

Job title: Asst. Engineer Production & Utilities Date of Joining:18th January 2009 to 15th January 2010 Job title: Sr.Operator Date of Joining:10th January 2003 to 15th January 2019 Polymer Plant capacity = 125,000 M.T/Annum Zimmer A.G, Germany Bottle Grade & Textile Grade Polymer

Pre-Polymerization Esterification Reactor Poly Condensation Reactors Disc Ring Reactor

Extruders Bubble Cap Process Columns Compressors

Blower (For Pneumatic Conveying System) Raw Material Storage Tanks. Chips (Pellets) Dryers

Classifiers Cutter Conveying System Storage Silos & Blenders

Condensers Primary & Secondary Circuit Heat Transfer Heat Exchanger Shell and Tube

Gas Oven (HTM) Evaporator Scraper

Cooling Water Plant Chillers Plant Air Handling Unit

De-mineralized Water Mixed Bed Columns. Soft Water Plant Condense water unit Raw Material & Additives For Textile Grade Pellets Production:

PTA – Pure Terephthalic Acid MEG – Mono Ethylene Glycol Catalyst Antimony Tri-Acetate

TiO2 – Titanium Dioxide MOD – Modifier

Raw Material & Additives For Bottle Grade Pellets Production:

PTA – Pure Terephthalic Acid MEG – Mono Ethylene Glycol IPA – Iso Phthalic Acid

DEG – Di-Ethylene Glycol Cobalt as a Catalyst Phosphoric Acid

Blue Toner

Monitor in Lab:

MFR YID – a,b,y Color Values Mole Ratio & Density

Pellets Sizes Polymer Conversion in Reactors I.V – Intrinsic Viscosity Main Accountabilities / Responsibilities

Leading a Shift team and give different instruction to engr. and operators and technician and helpers and supervisors and fitters for different maintenance Jobs according to work permit and update and train to operators in different process areas of petrochemical plant.

Reviewing engineering drawings, layouts, diagrams, technical, erection & commission of the plant.

Planning and scheduling to achieve effective manpower deployment of qualified workforce.

Pre-Commissioning and Commissioning and Start up the Petrochemical GPPS/HIPS plants.

Shutdown and Start-up operations by adjusting and monitoring the alterations of speeds, temp, pressures and flow rates as necessary.

Co-ordination and supervision of the Petrochemical Plant Operation in a safe and efficient manner to give the production.

Independently Plant start-ups, Shutdown and emergencies as per established Plant operating procedures. HEALTH, SAFETY & ENVIRONMENT

Ear Plug Safety helmet Safety Gloves Safety Dress Safety Shoes

Sprinkle Water System Deluge Water system DCP Co2 Foam ACHIEVEMENT

Actively worked in the major complex turn around Participated in the De-Bottle Necking of the Petrochemical plant. REFERENCE

Reference will be furnished on request.



Contact this candidate