JOB SUMMARY (11.5 years MEP-Construction Project Experience) 1 Jones Lang LaSalle Property Consultants (India) Pvt. Ltd.(JLL),Mumbai, India a. Corporate Fit-out of Maersk at Godrej-2,Vikhroli, Mumbai. Nature- Corporate Fit-outs (85,000-sqft ) /Green Field Project Consultant(PDC) Beratung Consultants
Architect- ANJ
Duration- Since Feb,2020 as Project Manager (MEP) R&R Brief- Program management, design and MEP construction management, strategic planning, cost and schedule control, multiple stakeholder management, process improvement of MEP services b. Vibgyor Tower Extension project for KRC & BKC Properties at BKC, Mumbai. (5 level extension of existing G+9 commercial building)
Nature- Commercial -Construction & Retrofits (54,000-sqft ) /Brown Field Project Consultant(PDC) Rumi H Bharucha & Axiom Consulting Architect- P G Patki Architects Pvt. Ltd
Duration- Since Aug,2018 as MEP Manager
R&R Brief- MEP construction management, Installation of New & Retrofit services, Planning, Design & Move management in coordination with multiple tenants & FM team. c. Project Management and Electrical technical trouble shooting of Petronas ‘s “Mulberi- Lube Oil Blending Plant, Patalganga”, Maharashtra (Industrial)
Nature- Infra and Warehouse /Green Field Project
Consultant(PDC) R K Petroplus Solutions (RKPS)
Architect-
Duration- Since Jan,2018 as Project Manager (Electrical & MEP) R&R Brief- Site coordinating for commissioning of Electrical & Instrumentation activities, coordination with consultants and Architect team, procurement, vendor bills, project tracking, supervising and monitoring of execution & commissioning and handover. d. Due-diligence, Developer finalization and design finalization Warehouse Project of “BMW –BMW RDC India”, Bhiwandi, Mumbai (Infra & Warehouse
Nature- Infra & Warehouse (3.5lakh sq. ft)/Green Field Project Consultant(PDC) R K Petroplus Solutions (RKPS)
Architect-
Duration- Since May,2017 as Project Manager (MEP & Civil) R&R Brief- Due diligence, understanding client requirement, developing technical-legal parameters for the project, Bidding Initiation, Developer finalization on behalf of BMW and design review & finalization.
2
e. MEP and Civil Warehouse Project of “Indospace –Arvy logistics warehouse”, Khopoli, Mumbai (Infra & Warehouse) Nature- Infra & Warehouse (3.5lakh sq. ft)/Green
Consultant(PDC) Karmaa SR Consultants Pvt. Ltd.
Architect-
Duration- Since June,2016 as Project Manager (MEP & Civil) R&R Brief- Design and Site coordinating for EPC activities, safety, contractor/vendor management, coordination with consultants and Architect team, procurement, design support and change management, vendor bills, project tracking, supervising and monitoring of execution & commissioning and handover.
2. Amazon Seller Services Pvt. Ltd. Mumbai, India
a. MEP and Interior Fit-out Project of “Built-to suit multi-tire Amazon warehouse”, Bhiwandi, Mumbai (Warehouse) Nature- Warehouse (2.5lakh sq. ft)/Green Field Project Consultant(PDC)
PMC /Consultant- a. CBRE South-Asia Pvt. Ltd
b. Maple Engg. -Design Services (India) Pvt. Ltd.
Duration- Since March,2015 as MEP Engineer (Projects) R&R Brief- Coordinating with EPC activities (Mechanical, Electrical, Plumbing, Fire-fighting, Civil services, Interior), safety, contractor/vendor management, coordination with PMC and Operations team, procurement, design support and change management, vendor bills, project tracking, executing, commissioning and handover.
3 Godrej & Boyce Mfg. Co. Ltd., Mumbai, India
a. MEP Projects in Eastern Region / West Bengal
Nature- MEP /Electrical projects
Consultant/PMC- M/s CBRE, M/s Spectral, M/s Mecon
Architect-
Duration- 8 months (July, 2014 – Feb,2015) as Assistant Manager (MEP &PDS-Bus-duct Projects) R&R Brief- Coordinating for Execution & commissioning activities, material planning, contractor /vendor development, support in procurement and estimation, Business development, participating in tendering, pre-bid & negotiation meetings, billing of MEP projects & Electrical Bus-ducts. b. MEP Project Management in Novotel, Ahmedabad, Gujarat (5-star Hotel) Nature- Hospitality Sector / Green Field Project
Consultant/PMC- Synergy
Architect-
Duration- 19 months (Dec, 2012 – June,2014) as Assistant Manager (MEP Projects) R&R Brief- Handling MEP issues, planning & scheduling in MSP, PO related issues, Contractor management, inventory management, Billing Cycle, QA & QC giving execution inputs, testing, commissioning, coordination with Interior and Civil activities, KAIZEN, IMS and reconciliation and handover to client.
3
c. National Fertilizers Ltd.(NFL), MP, India(A Mini Navaratna Company) Nature- Fertilizer Industry / Brown Field project
Consultant/PMC- PDIL (Project & Development India Ltd) Architect-
Duration- 11 months (Jan, 2012 – Nov,2012) as Assistant Manager (Electrical Projects) R&R Brief- Planning & Management in execution activities (installation, testing & commissioning of new/retrofitted HT/LT Panels, Motors, Cables, Lighting), billing, final reconciliation, business development, following Safety norms, KAIZEN, IMS, QA & QC. 4. Aryan Electricals, Maharashtra, India
a. Lupin Ltd., R&D Centre, Pune, India
Nature- Pharmaceutical Industry (R & D Centre) / Green Field Project Consultant/PMC- Venkatraman Associates
Architect-
Duration- 7 months (June, 2011 – Dec,2011) as Project Coordinator R&R Brief- Planning & Coordination in Electrical Installation, testing, commissioning of Panels (MCCs, PCCs, DBs, Transformers) Cabling (HT/LT/Control), Tray fabrication, Lighting & Billing, Material Management. Planning and coordination with Interior team for loss prevention and timely execution of services.
b.
Runwal Developers Pvt. Ltd., Pune, India
Nature- Residential cum Commercial Green Field Project Consultant/PMC-
Architect-
Duration- 7 months (June, 2011 – Dec,2011) as Project Coordinator R&R Brief- Coordinating in HT Cable laying, 11 KV Substation erection, testing, commissioning (11KV HT panel, Ring –Main Unit, Feeder Pillar, Façade/Exterior Lighting, Billing, Reconciliation, coordination with Civil vendors and interior layouts for lighting and tray installations. 5 Jatson Power Pvt. Ltd. Gujarat, India (A SIEMENS Panel Designing & Electrical Contracting company) a.
Surat Super Yarn Park Limited, Surat, Gujarat. (13 Textile units) Nature- CPP (15 MW- Thermal) and 16 Textile industry Brown cum green Field Consultant/PMC- Procon Engineers
Architect-
Duration- 5 months (Jan, 2011 – May,2011) Project Coordinator cum Site-in charge R&R Brief- Installation, testing, commissioning of (13 no. s) Transformers (up to 4MVA), Panels (11 KV/LT), Underground Cabling activity (HT/LT, Instrument), sub-station (11/.4 KV) charging, Fabrication, Earthing, Plant Illumination and Billing as per BOQ 4
b. Thunderbird Resorts/DHPL, Daman, India (Casino, restaurant, bar, swimming pool) Nature- Hospitality Industry Green Field
Consultant/PMC- Impacto Solutions LLC
Architect-
Duration- 7 months (June, 2010 – Dec,2010) Project Coordinator cum Site-in charge R&R Brief- Electrification activity, illumination, cabling, LT wiring, DB installation and Billing as per BOQ, FAS, Public Address System (PAS), Data &Telephone System, solving design issues, Coordinating with different agencies, client, PMC, Civil and interior layouts for lighting, power-point and tray installations before ceiling closure /partition wall completion. c. Gujarat Borosil Ltd., Gujarat, India (Figure glass Unit & Toughened glass Unit) Nature- Industrial (Glass production) Green Field
Consultant/PMC- Unix Consultants
Architect-
Duration- 1 Year (June, 2009 – May,2010) as Project Engineer (Electrical) R&R Brief- Coordination in erection of Batch House, MCCs, PCCs, Plant Lighting, Cable Laying(HT/LT/Instrument) activity, Transformer Installation (11/.44 KV), Contractor management, DPR, etc.
Detailed Job Role
11+ years of Project Management experience with core-competence in program management, MEP design coordination (with consultants and Architect), construction management( installation / retrofitting, commissioning & handover ), multiple stakeholder management, process improvement of MEP services, procurement and change management, EHS, Cost management & vendor billing in different sectors (i.e. Fertilizer Industry, Thermal Power Plant, Glass factory, Hotel Industry, Built-to-suit Ware-house, Pharmaceutical company and Commercial Apartments).
A flair for adopting modern construction methodologies and systems in compliance with quality standards
Coordination and Inspection of Installation, Testing & Commissioning activities of MEP system as per specification.
Engg. review of drawings, SLDs, for raising RFIs to consultants and quantity estimates for procurement clearance.
Tracking and handling Billing activity with detailed break-ups and Variation in PO, Amendments and Impact analysis for approvals.
Planning and coordination with Interior team for loss prevention and timely execution of services
Preparing documentation of progress, commissioning &handover of MEP, Civil & Interior activities at site.
Preparation & monitoring of MSP work schedules, MIS reporting, WPR, Monthly Risk register, Material Delivery tracker and follow-ups for delivery of materials/equipments required as per work schedule to ensure timely material availability.
Planning, review and implementation of Engineering and Civil activities for equipment of different services. 5
Inspection and quality checking of fabrication and Erection of MS Structural frames, HVAC Ducts, plumbing/Fire lines, cable trays, Panel/DB supports, partition walls and ceiling for office area, cafeteria,etc.
Responsible for on-site troubleshooting of all Engg. /Design/Technical constraints in implementing the layouts. QUALIFICATION
B-Tech in Electrical Engineering in 2009 fro G.I.T.A., Bhubaneswar, Odisha. COMPUTER PROFICIENCY
1. MSP 2. Auto-CAD