WORKS EXPERIENCES IN THE FIELD OF PROFESSION

A) Civil Engineer : March 09, 2013 up to Present

Southern Province Cement Company (SPCC )

P.O Box 27 Ahad Al-masarha, Jazan Province

Saudi Arabia.

Job Description : Project : Machineries Foundation & Roads

1.Review and checking the structural details plan of the project.

2.Supervise power plant expansion project for construction of all machineries foundation.

3.Supervise construction of foundation for electrostatic precipitator power fanned for cement mill grinding processed.

4.Redesigned cement plant drainage system for rehabilitation and modification.

5.Supervise construction of 6.9 kilometer of roads asphalt project 4lanes.

6.Properly monitored the implementation of standard specification to be carried out by project contractor.

7.Taking field photograph for any activities of the project to monitored the progress of work.

8.Conducting inspection and checking the quality of their contractor accomplishment prior for approval.

9.Submit daily accomplishment report to plant civil department head.

10.Submit monthly report for progress of work to plant work manager through plant civil department head.

B) Civil Foreman : June 29, 2010 to July 14, 2012

Boom Construction

Salwa Road Street, Doha Qatar

Job Description : Project : Asphalt Roads

1.Carefully study and review the details plans and specification.

2.Checked up and locate the fixed reference point vertical and horizontal alignment

3.Coordinate safety personnel discussing possible diversion the flow of traffic prior to commence any excavation.

4.Supervise removal of existing under ground facilities within in construction limit.

5.Checking and verify clearly and surely the details layout plans in order to avoid any mistake or damages during excavation.

6.Communicate field consultant inspector and obtained their officials signature for those itemize worked already completed.

7.Supervise skilled and unskilled laborers.

8.Supervise installation of steel bars and shuttering forms.

9.Supervise all structural concrete worked both precast and cast in place.

10.Supervise laying of precast curb stone and ground flooring interlock.

11.Supervise installation of precast pipe drainage for gully and soak-away

12.Supervise construction duct bank.

13.Supervise construction of sluice valve chamber and sluice chamber ( SVC-SC).

14.Supervise installation of road signboard and crash barrier railing.

15.Supervise roadway preparation, embankment and final base.

16.Supervise asphalting activities using Whirtgen Electronic Asphalt Paver.

17.Supervise roadway marking.

18.Submit accomplishment report daily.

19.Prepared weekly schedule and submit to the project engineer every week end

20.Prepared materials requisition every week end.

21.Report to the project engineer before and after working hours.

22.Record the number of manpower present and absent daily.

C) Civil Supervisor : August 21, 2007 to May 28, 2008

Aldossary Construction Company

Saudi Kayan Petrochemical Project

Jubail,Saudi Arabia

Job Description : Project : Pipe Rack Foundation, Electrical Duck

Instrument Duck Bank, Plant Asphalt

Roads and Drainage.

1.Planned and schedule all construction job.

2.Imposed construction policies and standard regulation of the company.

3.Supervise closely and properly monitored all construction activities.

4.Resolving any problem's arises or encountered during construction operation.

5.Check and balance the equipment utilization.

6.Advance in preparing worked request for next day construction work schedule.

7.Advance in preparing materials request needed for any construction job.

8.Contact and communicate jobsite inspector for checking and inspection of any work activities.

9.Conducted daily briefly meeting for reminder about monthly accomplishment for progress of work of the project.

10. Issued disciplinary action for those workers implicated company policies violation.

11.Control construction work accomplishment production.

12.Control good quality for any completed section or structure of the project.

13.Control manpower efficiency.

D) Civil Inspector : May 29, 2008 to June 13, 2009

Aldossary Construction Company

Saudi Kayan Petrochemical Project

Jubail, Saudi Arabia

Job Description : Project : Asphalt Roads, Culvert, Electrical

Duct, Instrument Duck Bank

1.Preparation of inspection and test plan (ITP)

2.Preparation of Work request for inspection (RFI)

3.Ensure that appropriate quality record for each activity carried out are documented and file.

4.Generate inspection request and coordinate with consultant to witness the inspection activities and obtain their approval signature.

5.Provide assistance to all project personnel on quality related issues.

6.Maintain quality control record for the project activities stipulated in the contract. In preparation for hand over documentation.

7.Carried out site inspection to the field for RSB, structural forms work, FDT using nuclear troxler machine, DFT using hand elcometer.

8.Report to the project manager for actual situation of the project quality control development.

E) Field Engineer : June 16, 2006 to February 19,2007

Hanjin Heavy Industries & Const. Co. LTD.

Kauswagan – Munai Road (Lanao of del norte)

Job Description : Project : 25 kilometer concrete roads project

1.Supervise reinforcement concrete pipe culvert ( RCPC ) casting and fabrication.

2.Supervise excavation for RCPC laying and installation.

3.Supervise construction of drainage catch basin.

4.Supervise construction of grouted riprap lined ditch.

5.Supervise construction of PCCP roadway concreting using whritgen electronic concrete paver.

6.Control manpower efficiency.

7.Coordinate consultant daily.

8.Materials take off.

9.Making technical report.

F) Field Engineer : August 16, 2005 to June 5, 2006

Hanjin Heavy Industries & Const.Co.LTD

Bulilis, ubay, bohol

Job Description : Project : Irrigation canal structure project

1.Estimate of materials for irrigation structure.

2.Supervise installation of RCPC for lateral line connection.

3.Supervise construction of turn out structure.

4.Supervise construction of footbridge for main canal pathway access.

5.Supervise construction of thresher crossing.

6.Supervise for head gate construction.

7.Coordinate consultant daily.

8.Making technical report .

9.Control manpower efficiency.

G) Drainage Engineer : March 3, 2003 to August 5, 2005

Hanjin Heavy Industries & Const.Co.LTD.

Pigcarangan, Tubod lanao del norte.

Job Description : Project : 95 kilometer concrete roads project

1.RCPC excavation and installation

2.RCBC excavation and construction

3.Construction of concrete bridge

4.Construction embankment slope protection

5.Bridge slope protection

6.Lined ditch construction

7.Wire mesh gabions installation

8.Catch basin construction

9.Stone masonry riprap construction.

10.Coordinate consultant daily.

11.Prepared daily report.

H) Drainage Engineer: July 16, 2002 to February 15, 2003

Hanjin Heavy Industries & Const.Co.LTD.

Sto. Nino~ Rizal, Occidental Mindoro

Job Description : Project : 16 kilometer Concrete Roads Project

1.Drawn shop drawing for detour road plan.

2.Prepared equipment schedule for detour road construction.

3.Supervise box culvert construction.

4.Guide bank construction for bridge approach embankment protection.

5.Spur dike construction for breaking or controlling pressure of water in the river.

6.Construction of concrete spillway.

7.Construction of stone riprap for roadside embankment protection.

8.Prepared & estimate materials quantity needed for each structure.

9.Prepared bars chart schedule for each structure prior for construction.

10.Coordinate consultant daily.

11.Control manpower efficiency

12.Prepared technical report.

I) Drainage Engineer : March 3, 2000 to June 22, 2002

Hanjin Heavy Industries & Const. Co. LTD.

Divisoria, zamboanga city.

Job Description : Project : 54 kilometer concrete roads project

1.Prepared RCPC shop drawing and details plan.

2.Estimate RCPC concrete and steel bars quantity.

3.Estimate RC pile concrete and steel bars quantity.

4.Supervise RCPC, RSB fabrication and concrete pouring.

5.Supervise RC pile, RSB fabrication and Concrete pouring.

6.Making bar chart schedule for RCPC and RC pile casting.

7.Supervise RCPC excavation and installation.

8.Supervise stone masonry retaining wall construction.

9.Control manpower efficiency.

10.Coordinate consultant daily.

11.Prepared technical report.

J) Office Engineer : February 5, 1997 to June 4, 1997

Hanjin Heavy Industries and Const.Co. LTD.

Cubao, Quezon city.

Job Description : Project : Manila Light Rails Transit Line # 2

1.Compute volume of excavation station base on profile and details plan.

2.Compute the quantity of form work for every pier and station.

3.Compute the quantity of concrete and reinforcement steel bars for every station.

4.Review and finalize all quantity result and submit to chief office engineer for approval.

5.Record all accomplishment report from field engineer for monthly billing purposes.

K) Field Engineer : June 15, 1997 to December 16,1997

Hanjin Heavy Industries and Const. Co. LTD.

Cubao, Quezon city.

Job Description : Project : MLRT # 2

1.Study the possible diversion flow of traffic prior of excavation.

2.Determine the number of road sign needs for diversion of traffic.

3.Determine the number of road sign needs for jobsite area.

4.Supervise installation of road sign and barricade for jobsite and detour.

5.Design the most economical road sign and barricade.

6.Make bars chart schedule for each items.

7.Coordinate project consultant daily.

8.Prepared technical report.

L) Field Engineer : October 3, 1995 to April 30, 1997

Hanjin Heavy Industries and Const. Co. LTD.

Isla putting bato, Tondo Manila

Job Description : Project : Manila International Cargo Terminal

MICT, Berth No. 5 Pier # 2

1.Supervise reinforcement steel bars fabrication and installation.

2.Making formal work request for final inspection for RSB after setting.

3.Direct interpretation of details plan to the foreman.

4.Final checking for steels bars and forms before inspection of the project inspector.

5.Coordinate consultant inspector for any related issues of construction worked.

6.Prepared technical report for project development and actual status of the construction progress.

7.Report to the project manager daily for possible any latest instruction to expedite the construction production accomplishment.

8.Advance review and study carefully for all materials needed for any construction work schedule.

9.Materials take off

10.Control manpower efficiency.

M) Field Engineer : December 08, 1991 to August 22,1995

Hanjin Heavy Industries and Const. Co. LTD.

Pulot, Ozamiz city.

Job Description : Project : 85 kilometer Asphalt Roads Project

10 kilometer concrete roads

1.Review and checking all approved structure details plan prior to proceed any field activities.

2.Coordinate survey team for accurate location of reference point for vertical and horizontal alignment before any excavation will be done.

3.Coordinate all materials personnel for verification of project standard specification for correct quality of materials using in all project structure.

4.Making bars chart schedule for any structure,These is guide for good performance of work on the field.

5.Supervise casting and fabrication of RCPC.

6.Supervise excavation for installation of RCPC.

7.Supervise box culvert construction.

8.Construction of roads lined ditch, and side slope embankment protection.

9.Construction of concrete bridge.

10.Supervise earthwork excavation through cut and side cutting.

11.Supervise roadway concreting ( PCCP ).

12.Coordinate consultant daily.

13.Control manpower efficiency.

14.Making advance schedule for any construction activities.

15.Prepared technical report.

N) Const. Leadman : May 15, 1990 to November 22, 1990

Urban Consolidated Construction Philippine 61-B Gen. Exchavez Street, Cebu City

Job Description : Project : 6- Stories Office Building

1.Layout for any structure of the building.

2.Head of excavation for all footing foundation of the building.

3.Leadman for concrete pouring activities.

4.Coordinate construction foreman for exact distribution of manpower to any activities.

5.Report to foreman and engineer for any verification of details plans and specification.

6.Coordinate project inspector to solve any defective areas of accomplishment .

7.Monitored the number of manpower present and absent daily.

8.Conducted briefly tool box meeting prior to commence of any activities.

9.Checking and closely monitored for the safety of all workers and provide safety equipment.

10.Report to the foreman and engineer before and after working hours.

O) Project Supervisor : June 1, 1989 to October 31, 1989

Metaphil Construction

Tagbilaran city

Job Description : Project : 2- Stories Commercial Building

1.Prepared monthly schedule

2.Prepared systematic procedure for all construction job.

3.Study and review the details plans and specification.

4.Used initiative to minimize consumption of construction materials.

5.Monitored carefully the actual manpower execution to their work of assignment.

6.Communicate and coordinate project consultant or jobsite inspector daily.

7.Checking the quality of incoming materials prior to used it.

8.Record all consumption materials daily.

9.Record the number of manpower present and absent daily.

10.Report to the project manager before and after working hours.

11.Submit technical project report to project manager weekly bases.

P) Project Incharge : November 3, 1989 to April 15, 1991

Jelac Construction and Development Corp.

Sebulan Maslog, Dumaquete city.

Job Description : Project : Steel Bridge and Concrete Bridge

1.Negotiate initially the land owner affected their properties for the construction limit of the project.

2.Planning for the selection of the equipment needed of the project.

3.Schedule the equipment mobilization and utilization.

4.Hired the competent heavy equipment operator.

5.Estimate the number of manpower and materials needed for the project construction.

6.Checking all reference point both vertical and horizontal alignment prior to commence any activities.

7.Review all details plans and standard specification stipulated on project contract.

8.Supervise closely all construction activities.

9.Report immediately to the project manager for any problems arise during operation.

10.Coordinate consultant daily.

11.Prepared technical report.

Q) Const. Foreman : June 10, 1988 to March 30, 1989

N.C.P National Power Corporation

Colon, Naga Cebu

Job Description : Project : Under Ground Canal Drainage

Concrete Roads N.P.C Compound

Maintenance Power Plant Building

1.Interpret details plans direct to the skilled laborers.

2.Layout the pipe line excavation

3.Conduct inspection prior for pipe laying

4.Estimate materials needed for the construction activities

5.Submit work schedule to the project engineer daily.

6.Submit daily report to the project engineer daily.

7.Submit materials requisition to the project engineer weekly.

8.Logbook activities and accomplishment daily.

9.Report to the project engineer before and after working hours.

10.Control manpower efficiency.



Contact this candidate