Skills & Abilities

· 22 years of experience in commercial and industrial electrical contracting

· 10+ years of Foreman/Lead experience leading crews up to 25 electricians.

· As Foreman of Kilby Center M.E.I. project, responsible for all scheduling, design review, permitting, Q.C./Q.A., Material ordering/receiving, as well as installation, and billing for clean room projects.

· Computer literate, to include fluency in Word, Excel, Power Point, and various e-mail programs, as well

as some use of CAD, and Accubid estimation software.

· Current TDLR journeyman electrical license, and OSHA 10 card. FOREMAN ALLIED POWER SPRING OUTAGE HANDLEY GENERATION STATION, FT. WORTH, TX. 02/20 – 06/20

● Foreman on spring outage with projects including relocation of main boiler pump feed control panel, downcomer pressure relief valves, secondary relief valves, thermocouple monitoring project for rebuilt header enclosure, wind box pressure and temperature instrumentation and controls retrofit and associated tubing, led lighting retrofits in control room, temporary power for man lifts, weld packs, furnace temporary panels for furnace re-build, break trailers, disaster trailers, and Covid-19 nurse checkpoint at main gate, retrofit for MCC buckets for valves, DCS terminations, UPS battery controller upgrade for HA4 and HA5. Led lighting install for scaffolding yard, various feed pump motor reinstallations, instrumentation and controls for main and secondary steam lines for block valves on HA3, as well as installing electronic pest countermeasures. FOREMAN ALLIED POWER FALL OUTAGES WOLF HOLLOW AND HANDLEY GENERATION STATIONS 09/19 – 11/19

● Foreman on a monitoring project for boiler feed, condensate, hogger and chill water motors/pumps. Involving layout of GRC conduit runs, low voltage communication runs to include fiber optic cable, coaxial cable, and cat VI terminations at Wolf Hollow. Outage at Handley power plant included moving various instruments and controls for boiler pressure, and temperature as well as tubing runs and DCS terminations. Also involved were flow valve relocations and maintenance on lighting and power circuits on HA3, HA4, and HA5. Installed new solenoids and valves and their respective controls for HA4 and HA5’s main gas feed lines. Upgraded new pressure relief valves on boiler downcomer tubes, as well as their associated controls from the DCS to MCC to field wiring. UPS panel upgrade for HA4 and HA5.

ELECTRICIAN CONTI CORPORATION LABOR DAY SHUTDOWN GENERAL MOTORS ARLINGTON ASSEMBLY PLANT 09/19

● As one of a team of electricians responsible for wreck out of QA/QC line cell and re-install of tooling during the shutdown.

ELECTRICIAN ROSENDIN ELECTRIC INC. FACEBOOK, ROANOAK, TX. 06/19 – 08/19

● While at Facebook, worked in data floors installing low voltage power supplies and lighting controls in building 6.

FOREMAN ELECTRICIAN ALLIED POWER SPRING OUTAGE HANDLEY GENERATION STATION 03/19 – 05/19

● List of projects include relocations of instrumentation and controls for boiler pressure, temperature, and associated tubing runs; secondary transformer monitoring project; corporate building maintenance; boiler unit lighting and power maintenance ELECTRICIAN CONTI CORPORATION THANKSGIVING AND CHRISTMAS SHUTDOWN GENERAL MOTORS ARLINGTON ASSEMBLY PLANT 11/18 – 01/19

● Thanksgiving shutdown included new installations of PDC’s and ethernet runs. Christmas shutdown included tool retrofits, new controller and PDC installations, festooning and EOT limit switch installations with 480v motor power, 120v controls, 24v signal and ethernet connections for two door lines.

ELECTRICIAN SALSBURY INC. FALL OUTAGE HANDLEY GENERATION STATION, FT. WORTH, TX. 10/18 - 12/18

● Fall outage consisted of relocating instrumentation and controls for boiler and running new tubing, new compressor installs for HA3 and HA5, new power and control feeds for Anodamine chemical skid, various other lighting and power troubleshooting and maintenance. FOREMAN ELECTRICAL INSIGHTS NEW PAINT SHOP GENERAL MOTORS ASSEMBLY PLANT ARLINGTON, TX 05/18 – 08/19

● Responsibilities included lay out and manpower assignments on new construction paint shop. Given assignment of installation of electroplating and primer dip tanks to include all MCP, MDP, drive assemblies, communication blocks, layout of cable trays, conduit runs, material requisition, schedule updates, and time keeping.

ELECTRICIAN ROSENDIN ELECTRIC INC. FACEBOOK DATA CENTER, ROANOAK, TX. 02/18 – 05/18

● Assigned to underground duct bank crew and generator yards running 4” and 6’” pvc duct banks and generator, transformer, and underground into main electrical rooms. Worked also in REI prefab shop.

ELECTRICIAN MORELY MOSS ATT TOLL BUILDING, DALLAS, TX 10/17 – 01/18

● Assigned to installing new 480v busway from switchgear to data floor MDP’s, lighting installs and wire pulls, and terminations in switchgear.

ELECTRICIAN CONTRACTOR’S RESOURCE FED-EX GROUND HUB, HUTCHINS, TX.

● While at Fed-Ex installed new smalls line, and NC line in wings A and B. All conduit runs were GRC from ” to 2”. Installed devices, terminated, and terminated MCP’s. Page 2

FOREMAN RAGINGWIRE DATA CENTERS 08 / 2016 – 11 / 2016

● Foreman on a team involved in ground-up construction of a new data center facility Duties included lay-out of main electrical room, lighting and wall rough, material ordering, daily manpower assignments, daily JSA and MOP paperwork, as well as weekly electrical coordination and look ahead assignment.

FOREMAN/LEAD ELECTRICIAN GEORGE Mc KENNA 03 /2016 – 07/2016

● Involved in manpower assignments, material ordering and receiving, risk management, daily safety briefing, design review and implementation, lay out and build up, and testing of a ground-up resort water park facility for the Hilton Anatole hotel in Dallas, TX. ELECTRICIAN CONTRACTORS RESOURCE 06/2014 – 03/ 2016

● Fed Ex Ground facility expansion working with MHS to include new van line’s, new distribution wing, update of scan tunnels, camera installation, new smalls line, new unloader installation, new primary sorters, and new PLC/MCC installation. All pipe runs were GRC from 3/4” to 2”, to include all device installation and termination.

FOREMAN/LEAD ELECTRICIAN TRADE MANAGEMENT 03/2014 – 06/ 2014

● Contracted to Prism Electric for installation of a Stress Lab, Nuclear Medicine, CT Lab, and UPS installation for the CT Lab.

ELECTRICIAN CONTRACTORS RESOURCE 11/2013 – 03/ 2014

● Electrician on a retrofit project for Ash Grove Cement Plant, to include installation of a new coal mill, coke scrubber, new switchgear/MCC building, and fire suppression system. All conduit runs were GRC up to 4”, cable trays, install and terminate devices, and involved in the shutdown of 4160v substation for changeover to new switchgear/MCC building. ELECTRICIAN CLP 4/2012 – 5/2013

● Contracted to Dal ec on a generator retrofit project at Terrell State Hospital to include underground, new service pads, new transformers, replacing existing generators, ATS system, and associated shutdown and change overs. While with CLP contracted to Mc Dean at Parkland Hospital installing overhead conduit and distribution and patient wall tie-ins. ELECTRICIAN CONTRACTORS RESOURCE 10/2011 – 2/2012

● Involved in the expansion of Fed EX Ground hub to include new van lines, new distribution wing, update scan tunnels, and various camera/convenience installations. All conduit run was GRC from

” -2”.

ELECTRICIAN SELF EMPLOYED 4/2010 – 9/2011

● Contracting to several general contractors, real estate companies and private individuals to buildout, tenant finish and remodel commercial lease spaces throughout the D/FW area, to include Goodfella’s Pizza Kitchen, Spice House, Papa Lopez Mexican Cantina, Allstate Ins., Rowlett Piano Studio, and several other various businesses.

Page 3

PARTNER SELF EMPLOYED 3/2009 – PRESENT

● Start-up of mobile events bar-b-que catering business (Paint Horse BBQ). Duties include fabrication of trailer, permitting with various municipalities, promotion, cooking, serving, and maintenance. ELECTRICIAN CUMMMINGS ELECTRIC 9/2008 – 12/2008

● Assigned to distribution crew as E-6 on Presbyterian hospital Harmon tower. Duties included layout of electrical rooms and installation, pipe runs from subs to switchgear, transformer installation and termination, electrical riser installation, wire pulls, and communication home run piping. ELECTRICIAN CHICKASAW ELECTRICAL LTD 10/2007 – 09/2008

● Assigned to new construction project of an elementary school in Midlothian TX. Duties included lay-out, build-up, and installation of key electrical systems from distribution to branch, as well as coordinating with fire alarm, and security contractors. ELECTRICIAN SYSTEM ELECTRIC 07/2007 – 10/2007

● Assigned to project at Presbyterian hospital in Greenville, TX., involving distribution to branch electrical installation in a ground up new construction environment with emphasis on all phases of hospital construction and remodel of existing facilities. LEAD ELECTRICIAN DESIGN ELECTRIC 04/2007 – 07/2007

● Assigned to new construction project from distribution to branch piping and wiring at Lew Sterret Justice Center south tower. Duties also included remodel of existing intake, and offices in Frank Crowley Court House.

ELECTRICIAN CERTIFIED COMMUNICATIONS 12/2006 – 004/2007

● Contracted to Walker Engineering to a remodel for Countrywide Mortgage n Ft. Worth. Duties included distribution to branch installation, as well as communication, security, and communication piping and wiring.

FOREMAN/LEAD ELECTRICIAN FTS 05/2004 – 12/2006

● Assigned primarily to Texas Instruments and Raytheon with clients to include TWU, DFW airport, Dallas Semi-conductor, ISS, DRS, Love Field airport, and SMU. Foreman on Kilby Center MEI tool hook-up project, and lead on various lease space builds and remodels. Worked in a manufacturing, and production environment wiring micro-electronic head cases for various styles of bulk chemical dispense units, requiring detail to electrical schematics, as well as testing, implementation, and documentation. 60+ hrs. of safety training annually, and security clearance for various sites. LEAD

ELECTRICIAN QUALITY CONTRACTORS 09/1998 – 07/2003

● Assigned to Texas Instruments and Raytheon on clean room builds and projects. Duties included remodels, new construction, and tenant finish for various industrial and commercial client. Installed data storage units, and distribution at Experian. Worked with facilities for installation, and later wreck-out of Tri-quint Semi-conductor. 60+ hrs. of safety training annually, and security clearance to various sites.