LEONILO A. GARING
Sta. Rita, Ilaya, Batangas City
PHILIPPINES 4200
Tel. No. +634********
Mobile No. +639*********
Email Add. adidhx@r.postjobfree.com
SR.METAL TRADE MECHANIC/PIPEFITTER FOREMAN
(Welding and fabrication, onshore&offshore)
PERSONAL DATA:
Date of birth: April 11, 1961
Gender: Male
Civil Status: Married
Height: 168 cms.
Weight: 176 lbs.
OBJECTIVE:
To join the company where I can make remarkable contribution, through my knowledge, skills and experiences towards companys objectives and work time frame in mechanical works, piping fabrication,and welding jobs. I am a rotational individual striving to achieve excellent, in whatever I do, in which I will do a chance to show my potential and capability, to all job related in my field and area of work, for both construction and maintenance job, onshore and offshore.
EDUCATION:
Highest Educational Level
Educational Level: Graduated Diploma/Secondary Education
Plus/vocational course: Rizalian Vocational School Batangas City
Date: Graduated May, 1979
Evening Terminal Course: State University formerly PBMIT Batangas City
Technical Machinist 1980 (undergraduate)
WORKING EXPERIENCES
COMPANY: ALGOA EQUATORIAL GUINEA
POSITION: Pipefitter Fabricator 1
DATE: March 27, 2019 to October 17, 2019
LOCATION: Malabo Equatorial Guinea
DUTIES IN BRIEF: Piping and Structural fabrication for Mobil Exxon
Do measurement calculation for cutting pipe, in fabrication of pipe spools.
Read and understand isometric drawings and identified materials needed.
Prepared and maked layout for fabrication of pipe, such as saddle, lateral and dummy pipe support.
Do some actual measurement verification prior to fabrication.
Cutting of steel plate for structural fabrication, fit-up and tack weld.
Prepared drawing and sketches as require for the job.
Prepared materials to carry our works, provide assistance as required by the other crew.
Make sure the appropriated used of tools for the type of work.
Attend and conduct safety meeting, before job start and maked sure worksite are clean and safe.
Organized all the means, materials and equipment necessary to perform the work in a safety manner.
COMPANY: ALGOA CABINDA FABRICATION SERCICES
POSITION: Boilermaker/Piping foreman
Date: April 29, 2007 to February 09, 2015
LOCATION: Cabinda, ANGOLA, West Africa
DUTIES IN BRIEF: Chevron Oil Company, Oil & Gas Industry
Maked hand sketch for piping design needed in the flatform.
Worked and monitored, construction activities to ensure work efficiency and workmanship.
Worked and checked job execution to meet project standard and specification.
Do some actual measurement verification on field prior to fabrication and installation.
Ensured all materials and supplies needed, are available onsite.
Read and understand blue print, and identify materials needed for the job to be executed.
Coordinate and prepared plant shutdown preparation.
Conducted safety meeting, and ensure worksite are safe.
COMPANY: JEMBAS ASSISTENCIA TECHNICA LDA.
POSITION: Chief Pipefitter Technician/Piping foreman
DATE: September 2, 1995 to December 6, 2006
LOCATION: Luanda ANGOLA West Africa
DUTIES IN BRIEF: Chevron Oil Company & Government Project
Do site visit and make study regarding piping installation and repair in some provinces of Angola.
Lead and worked in fabrication of all piping works, base on standard isometric drawings.
Training of some Angolan employee under my group(OJT)
Provide general guidance and work direction for assigned group in every area.
Prepared accomplishment and progress report to be discusss in the weekly meeting.
Installation of Waukesha Enginator and all piping connected at the cooling system.
Fabrication and installation of stub for hot topping connection.
Worked and lead day to day activities associated in schedule manpower.
COMPANY: SAUDI ARABIAN OIL COMPANY
POSITION: Field Metal Mechanic
DATE: May 24, 1992 to May 24, 1995
LOCATION: Dharan, SAUDI ARABIA
DUTIES IN BRIEF: Aramco Oil Company, Oil & Gas Industry
Maintenance work at Safaniyah GOSP and SGCP Unit.
Prepared surveys, lifting plan and method, for Plant shutdown preparation.
On actual Plant shutdown, we do the repair of heat exchanger accessories, and hydrotesting both tube test and shellside test.
Provide leadership to every job being done, and assured all members understand their role and accept their responsibility.
Set up and operate hydrotest unit and do hydrotesting of new lines.
Ensure appropriate used of tools for the type of work being done.
Supervised contractor job.if performing works comply with work standard and specification.
COMPANY: TAYLOR WOODROW-TOWEL COMPANY
C/O BROWN AND ROOT MIDDLE EAST LLC
POSITION: Pipefitter foreman/Mechanical Inspector
DATE: March 30, 1991 to November 4, 1991
LOCATION: Sultanate of Oman
DUTIES IN BRIEF: Oil and Gas Petroleum project
Worked and know the whole process of piping construction from fabrication to installation.
Lead and supervised piping fabrication to ensured quality work and with in the standard.
Hauling and installation of pipe spools to every pipe rack at Area 26-1.
Attend weekly meeting for job discussion, and project development.
Maked daily accomplishment and progress report.
Lay- out, set up structure for fabrication, and operate electrical handtools, oxy- acetilyn cutting outfit, griender and etc.
Checked if temporary installation of equipment, are comply with safety.
COMPANY: GEORGI DIMITROV SHIPYARD
POSITION: Pipefitter foreman/Ship Hull fitter
DATE: May 24, 1988 to December 9, 1989
LOCATION: Varna BULGARIA Shipyard
DUTIES IN BRIEF: Ship Building Industry
Analized the actual performance agains plan and make consistent on plan objective.
Discussed work activities with the team members.
Lead and supervised the group in the installation and fabrication of engine room pipes.
Installation of heat exchanger accessories, boiler and all piping connected on it.
Erection of different ship section like side shell, double bottom and bulk head.
Installation and fabrication of ballast line, airvent piping, and superstructure.
Set-up and operate rigging equipment for basic lift for installation.
COMPANY: SAIPEM AG-TEKFEN/KUTLUTAS
POSITION: Pipefitter fabricator 1
DATE: January 28, 1987 to January 19, 1988
LOCATION: Jardyah BAGHDAD IRAQ
DUTIES IN BREIF: Oil and Gas Petroleum Project
Worked at GOSP expansion project, fabrication and installation of pipe spools.
Measured and prepared piping for field weld at work area.
Installation and fabrication of trunk lines, going to the GOSP manifold.
Worked as shop leadman in fabrication of spools for IRAQ-TURKY pipeline project.
Modification of pipings in some pumping station with change order request.
Assist in pipesupport file driving and installation of straight run pipe.
Installation of pigg indicator and do pigging of new lines.
COMPANY: SOCIETA ANONIMA ELECTRIFICATIONE (SAE)
POSITION: Pipefitter foreman
DATE: October 8, 1984 to October 6, 1986
LOCATION: Al-Wiyah, Baghdad IRAQ
DUTIES IN BRIEF: Oil/Gas and Electrical Project.
Routine general maintenance work and trined Iraque nationals.
Revision of piping around tank farm as well as in Utility Powerhouse Area, installation and fabrication of spools and pipe support.
Relocation of some valves, and make additional fire hydrant and fire monitor.
Repaired of furnance, rplacement of furnance tube and installation of stainless pilot gas line.
Repaired of storage tank, rebottom and repainting.
Ensured timely accurate and complete crew time sheet.
Prepared and executed hot topping connection for new lines.
Doing some additional maintenance work with job request issued by the operation.
COMPANY: IMAD TRAIDING AND CONTRACTING EST.
POSITION: Pipefitter/Metal Mechanic Leadman
DATE: October 18, 1981 to September 5, 1984
LOCATION: Al-khobar SAUDI ARABIA
DUTIES IN BRIEF: Oil and Gas Piping project
Installation of Qatif-Rastanura Pipeline crossing the Tarut bay 32”pipe.
Fabrication and installation of structural support and ringerder.
Interpret standard isometric drawings, piping structural and others.
Do to identify pipes and fittings, there type and sizes.
I passed the testing in Aramco pipe welding standard and do welding of pipe joint and etc.
During the Plant shutdown in Petrokemya, I was assigned as Metal Mechanic Leadman, doing some piping renovation and replacement at the process area.
Prepare lay-out and piping fabrication such as, elbows, saddle, lateral saddle and etc.
COMPANY: R.P.D. General Contractor
POSITION: Pipefitter/Welder
DATE: June 20, 1980 to August 10, 1981
LOCATION: Tabangao Batangas City
DUTIES IN BRIEF: Oil and Gas Petroleum Project.
I was assigned at Philippine Petroleum Corporation (PPC)Pillila Rizal
Routine general maintenance work at Phil. Petoleum Corporation.
Fabrication and installation of pipe spool and support.
Revision of piping around ISBL and OSBL at Utility Power House Area.
Get work permit for the type of work to be done, at the process area.
Do tie in installation of some additional piping works.
Do housekeeping on worksite and always keep worksite safe.
SUMMARY OF MY EXPERIENCES
My overall experiences was more than 30 years, 12 years as Piping Foreman, 8 years as Piping Chargehand, 4 years as Pipefitter Fabricator, 2 years as Metal Mechanic, 2 years as Pipe Welder, and 2 years in Ship Building industry. All my experiences are in field of fabrication, erection, pipelines, commissioning and quality control for various, construction and general maintenance projects in oil and gas, chemical process, plant facilities, both onshore and offshore. Erection of storage tank, presasure vessel and piping system. Also perform static equipment erection and structural fabrication, welding works and mechanical inspection. Refinery general maintenance, piping experience in different construction projects in Oil and Gas, and Chemical fields in Middle East, Africa and Europe. I can assured that my experience is a must only due my to educational attainment it hard to get a higher position.
SKILLED QUALIFICATION
Certified Pipe welder Saudi Aramco
Work Permit Coordinator Q4 Online System Chevron
Professional Driver Licence no. DO1-85-008839
Visual Piping Inspector NDT course Brown&Root Oman
Ship Hull Fitter/Pipe Fabricator
TRAINING AND SEMINAR
June 12, 1991 to June 1991 --- Visual Inspection Seminar NDT course (Brown & Root Sultanate of Oman)
July 2, 1992 (one day) Work Permit Training Couse ( ARAMCO Tanajib Saudi Arabia
April 11, 1991 to April 13, 1991 First Aid Breathing Apparatus User (FABA) Petoleum Development of Oman Marmul Site
Jan. 6, 1996 to Jan. 9, 1996 Reverse Osmoses Maintenance & Operation Luanda Angola
Aug. 25, 2008 to Aug. 27, 2008 Hytorc Equipment BasicTraining Sahaniyah Offshore Angola
December 13, 2008 to December 15, 2008 Q4 Safety Introduction, online work permit process Chevron Angola
July 16, 2011 to july 18, 2011 Leadership Training Course Chevron Angola
PERSONAL REFERENCES:
Engr. Dionie Garing
Caltex Philippines, Sr. Maintenance Supervisor
Tel. No. 634*********
Mr. Mariano Aclan/Mr. Jimmy Marabuena
Offshore Piping Supervisor/Coordinator
Algoa International Anstalt
Tel. no. +224********* extn.3887
Email adidhx@r.postjobfree.com
LEONILO A. GARING
(Applicant)