SYED ABDUL BARI ELECTRONICS ENGINEER(*****)
Objective Electronics/Electrical
To seek challenging experience from a supportive learning environment and there after reaching the highest level of professionalism.
EDUCATION
MASTER OF ENGINEERING (2017 – 2019) NED UNIVERSITY KARACHI ENERGY MANAGENENT
(Electrical)
BACHELOR OF ENGINEERING (2012 – 2016) IQRA UNIVERSITY KARACHI BE ELECTRONICS EXPERIENCE
KARSAZ PVT LTD (Aug 17-- Present)
• I am working as an Assistant Engineer in KARSAZ (PVT) LTD started from Aug 2017 to currently
• My responsibility is to provide complete operation and maintenance services for the equipment owned by our customers. So, I have got experience in working with different kinds of projects. Just like
Installation of Luffing Crane
Karachi Shipyard & Engineering Works
Currently involved in the Installation and Commissioning of ZPMC Luffing Crane. Our responsibility is to give Technical assistance to the ZPMC Engineers related to Electrical and Electronic Works i.e. Installation of Electrical components, cable laying, terminations and etc.
Quayside Crane
DP World Karachi, Port Qasim Authority
Assisted ZPMC in fulfilling of Electrical Tasks on the punch-list provided by DP World.
Installation of HCV-G Scanner
Karachi Port Trust & Port Qasim Karachi
Involved in the Installation and Commissioning Smith Detection HCVG X- ray system at Karachi Port Trust and Port Qasim.
Address A-96 Gulshan-eGazian Sector 51-A Gadap Town. Mobile. +923*********
Email. adicf4@r.postjobfree.com
SYED ABDUL BARI ELECTRONICS ENGINEER(24412)
As I have been the part of maintenance level 2 training of HCVG X-ray machine which was provided by one of our principal (Smith Detection). So my basic responsibilities in this project is to provide assistance and support to FSE of Smith Detection Maintain the machine in proper working condition. Provide basic operation training of this machine to custom appraisers. Cooperate and communicate effectively with project manager and other project participants to provide assistance and technical support. Review engineering deliverable and initiate appropriate corrective actions.
UNIVERSAL CABLES PVT LTD (Feb 16--Aug 17)
I was working as a Quality Assurance Engineer in Universal Cables Pvt Ltd. Verifying all the Inspections as per Standard,
Specifications and Customer’s need.
Responsible for all Quality Control activities for the allotted Process. On-Floor surveillance to check the Process work and give comments necessary, according to standard & specification.
Taking immediate remedial to clear inspection
Ensure Raw Material Testing and prepare Test Report. Ensure Conductor Resistance Testing during process. Ensure Spark Testing of Cable during Production.
Ensure Insulation Resistance (I.R) Testing of Cable. Ensure High Voltage Testing (H.V.T) of Cable.
Keep Reports and documentation of all inspection activities LUCKY CEMENT PVT LTD
Internship in Instrumentation & DCS/PLC Department. Watching PLC Panel & DCS System working.
Instrumentation Panel working & Controlling of Sensors. Learning Process of Cement Manufacturing
PROFESSIONAL SKILLS PERSONAL DETAIL
Maintenance, Service, instruments, Panel Wiring. Father’s Name: Syed Nasir Ali Trouble shooting PLC Programming. Date of Birth: 30-June-1992 Handle processing work. NIC no: 42101-9411035-3
Manage daily computerized and manual M.I.S. Married Effective communication skill creative, Team Leader, project management,