Post Job Free

Resume

Sign in

Engineer Project

Location:
Mumbai, Maharashtra, India
Posted:
December 04, 2020

Contact this candidate

Resume:

RESUME

POSITION

:

SENIOR PROJECT CONTROL ENGINEER

NAME

:

SHAIKH MOHAMMED ABDUL MAJEED

NATIONALITY

:

INDIAN

DATE OF BIRTH

:

5TH JUNE’ 1976

ADDRESS

:

FLAT NO – 207, PLATINUM AVIOR, PLOT NO-24/24A, SEC-20, ROADPALI – NAVI MUMBAI, INDIA - 410218

CONTACT NO.

:

+91-993**-**-*** /+91-773*******

E-MAIL / Skype ID

:

adic3w@r.postjobfree.com / mohamed.majeed0606

PASSPORT NO-

:

M 1945280

QUALIFICATION

:

B.E. CIVIL (DISTINCTION WITH 74 %)

COMPUTER EXPOSURE

:

PRIMAVERA, M.S. PROJECT & M.S. OFFICE.

DRIVING LICENSE

:

Valid driving License (KSA & India)

CAREER SUMMARY

Over 20 years experience in Oil, Gas and Petrochemical industry in project controls role that included Project planning, resource loaded scheduling, cost control, change management, invoicing. Phases covered are Engineering, Procurement & Construction for various projects in challenging international assignments. Worked in challenging projects in UAE, Kuwait, Saudi Arabia and India.

Worked for premier companies like WorleyParsons KSA, WorleyParsons India now being Worley, Petrofac, ARAMCO (LUBEREF), Technimont Arabia, Al-Ghanim International & Saipem-Triune.

Expertise includes hands-on experience in planning software such as Primavera P6 and MS Project. Analysis and estimation of engineering and construction manpower, resource loading and optimization. Preparation of manpower histograms, progress reports, productivity report etc.

Utilize the Planning Computerized Software as Primavera Enterprise Ver-6” for the preparation of Work Breakdown Structure (WBS), Overall EPC Project Control Schedule & Master Schedule and to assess the schedule practicality and compliance with the Contract requirements.

Update the networks on regular basis during the course of execution of the Project, and preparation of weekly/monthly progress reports and management information reports including front lined bar charts, planned versus actual ''S'' curves and project master plan.

Monitor the Physical progress of the Project by comparing planned versus actual and anticipate potential delay/ hindrances if any.

Revise (re-schedule) if necessary, the project network during the course of execution and incorporate the agreed changes of scope, which affect the schedule and re-issue for necessary approval. Evaluate and report the impact of the re-scheduling task on the Project milestones and Budget.

EMPLOYMENT HISTORY

Jan 2019-Jan2020

Worley – Kingdom of Saudi Arabia

SR. PROJECT CONTROL ENGINEER

Project Brief:

Hawiyah Unayzah sales Gas Storage project of Saudi Aramco, aggregating 242,000-man hours budgeted for detail engineering, procurement support and construction supervision. TIC Cost of 853 million UDS.

Duties & Responsibilities:

Worked as a Senior Project Control Engineer. Being responsible for development & maintenance of detailed WBS, level-3 Engineering, Procurement & Construction schedule, progress curves, man power histograms & forecast charts. Development and update project dashboard. Setting up project on EcoSys to periodically updating progress to generate EDSR report. Being involved in various project control functions and preparation of weekly / monthly reports to the client and project control statements. Also, being involved in preparation of Budgetary Cost Estimate at different design stages through material take-offs, latest and historical material prices.

Jan 2014 - May’ 2018

WorleyParsons India - Mumbai

LEAD PROJECT CONTROL ENGINEER

Project Brief:

Worked as a Lead Project Control Engineer, involved in efforts for Project Control functions for VDPL Vijaywada-Dharmapuri project. Worked for various projects like Saudi Aramco Balance of Gas Plant, Shell Kaybob, CoMH, Salem Harbor, KPone, PP13-14, Glenarm, WAFRA JO (Kuwait), Yamama LUKE Oil project for FEED etc.

Duties & Responsibilities:

This includes preparation of planning package that comprised of Lev-4 Primavera schedule resource loaded with man-hours comprising of over 2500 activities. Completed the InControl V10 Set-up based on various CTR/WBS & Gates for engineering activities for preparation of various reports like Engineering Deliverables Register, manpower histograms, cost reports etc. Progress update and reporting. Preparation & review of monthly project reports prior to issuing the same to the client. Progress measurement reports based on client’s approved gates. Various analysis reports related to project progress, cost & budgeting, project scope and schedule variation, productivity, man-hours control. Also involved in preparation of invoices. Well versed with ACCENTA for generating PCS Project Control Statement, MPRD & DSO reports on monthly basis. Also used TMS software for timesheet management and also preparation of GBS reports for time writing system.

Mar 2013 To Nov’ 13.

TECNIMONT ARABIA LTD – SAUDI ARABIA

Sr.PLANNING ENGINEER

Project Brief:

SADARA’s ongoing LLDPE’s Project based in Al-Jubail Saudi Arabia, comprising of Reactor unit, Hyper & Booster compressors, Blender Silo unit, Extrusion Package unit, HP / LP Recycle Gas treatment unit, Waste Oil & Modifier storage unit, Degassing & Pneumatic Conveyor system etc.

Duties & Responsibilities:

Worked as senior planning engineer and was involved in Preparation of Overall Project Schedule Work break down structure (WBS), Look ahead schedule with key activities in the early stage of the project, critical path analysis during the course of project execution, contractors schedule & resource

analysis, vendor schedule analysis & follow up, Preparation of Monthly Reports with the project “S-curves”, Weekly and Daily reports. Preparation of project review presentations etc.

Jun’ 2011 TO Dec’ 2012

SAIPEM TRIUNE ENGINEERG Ltd . Co. – MUMBAI

PMC

DY. PLANNING MANAGER

Project Brief:

ONGC’s ongoing project APU-Additional Process Unit comprising of units like LPG, Condensate Fractionation, Condensate Handling, Gas Sweetening, Utilities & Offsites. The expansion project based at Uran – New Mumbai.

Duties & Responsibilities:

Responsible as a PMC’s Senior Planning Engineer to assess EPC contractor’s overall schedule for its practicality and its compliance with contract/ planning package. Closely monitor progress / quantity curves on daily, weekly and monthly basis. Track manpower and material resources of the EPC/ Sub-contractor to check and ensure planned incremental progress. To check and assess various vendor schedules for its compliance with overall EPC schedule. Generate and issue weekly, monthly and MIS reports as per schedule. Prepare and present progress presentations at Management Review Meetings. Closely monitoring and ensuring EPC Contractor’s equipment & material delivery at site to facilitate installation as scheduled.

Oct’ 2010 –May’ 2011

PETROFAC EMIRATES UAE – ABU DHABI.

Sr.PLANNING ENGINEER

Project Brief:

Abu Dhabi - Ruwais project NGL-4th Train Gas Plant with design capacity of 27,000 TPD of NGL/LPG. The new facilities comprising of Fractionation & Refrigeration, Propane treatment, De-euthanizer Overheads treating, Sulphur recovery unit and storage tanks for Butane, Propane and Paraphenic Naphtha etc. Project also includes Interface and tie-in with existing facilities.

Duties & Responsibilities:

Responsible for updating EPC level-4 Contract Schedule using the latest Primavera-6 software as per the physical progress. Review sub-contractor’s schedule and analyze in detail to check for its compliance with contract milestones. Timely preparation of weekly and monthly project reports in accordance with project calendar. To study client’s and sub-contractor’s Contract document and to closely monitor current project status, thereby notifying to the management of the potential problems if any. To check and analyze sub-contractor’s manpower and material resources to ensure weekly and monthly incremental progress as planned.

Apr’ 2009 – July’ 2010

LUBEREF - Saudi ARAMCO Lubricating Oil Refining

Company. SAUDI ARABIA.

PLANNING ENGINEER

Project Brief:

Saudi ARAMCO Lubricating Oil Refinery construction project in Yanbu, Saudi Arabia. New Plant and facilities construction for production of Lube Oil of Grade-II/Grade-III Base Oils, Bright Stock, Drilling fluid etc. The principal components of the project include Hydrocracking and Dewaxing unit, Propane De-asphalting unit, Hydrogen production & recovery unit, Sulphur recovery and Granulation, Asphalt facilities, Offsites utilities and Flare, Storage for Feeds, intermediates and products, New buildings and DCS Control system etc.

Duties & Responsibilities:

Responsible for preparing and updating FEED Schedule. Contributing in preparation of SIB Specific Instruction to Bidders at the Pre-FEED stage. Preparing and setting criteria for Bid Evaluation with

respect to project control. Review Project Control procedures, WBS and detail schedule submitted by the contractor at the FEED Front End Engineering Design stage.

Mar’ 2005-Dec’ 2008

TECNIMONT ARABIA LTD – SAUDI ARABIA

PLANNING ENGINEER

Project Brief:

Project HD/LD Polyethylene with annual production Capacity of 800 KTY of TASNEE Petrochemicals in Al-Jubail Saudi Arabia being subcontracted to Tecnimont Arabia Limited a branch office of Tecnimont Spa Italy being operational in Middle East Gulf region. The contract plant has been constructed using BASELL LUPOTECH High Pressure Reactor technology. The plant comprising of HDPE / LDPE Polymerization bays, main peroxide storage & PO Cooling unit, Primary Booster & Hyper compressor, Hot water handling unit, HD / LD Black & Natural Polyethylene pellet Extrusion Package unit, HP / LP Recycle Gas treatment unit, Waste Oil & Modifier storage unit, Degassing & Pneumatic Conveyor system, Battery Limit and Utility Structure, Blender and Logistic Storage Silo building, Main substation building, Slurry cooler, Dryer, Distillation and Catalyst Structure, Internal roads and pavements, Pipe rack, underground trenches, Chemical storage and Operator Shelter building.

Duties & Responsibilities:

Job responsibility includes Preparation of EPC master and detailed level 4 Project Control Schedule using an advance project planning tool like Primavera Enterprise version. Calculating and allocating standard man hours based on efficiency factor of manpower and equipments for each activity. Issuing bulk and specialized materials, package equipments and machineries to the sub contractor. Preparation of Weekly, Monthly and various management information reports. Preparation of weekly and monthly Planned v/s Actual Overall and discipline wise S-Curves, Calculation of K Efficiency factor based on spent and earned manhours. Reviewing daily reports of subcontractors and technical co-ordination with Engineering, Procurement and Commissioning team. Providing project information to client as per contractual obligations. Effective Co-ordination with various Vendors at site right until finishing of package equipments and machinery installations. Preparing project presentations for management and sponsor meetings. Preparing Project Acceleration and Recovery schedules as per the current situation during project execution meeting contract milestones and subsequently getting approval from client.

Jan’ 2003 – Oct’ 2004

ALGHANIM INTERNATIONAL GENERAL TRADING & CONTRACTING CO. W.L.L – KUWAIT.

PLANNING ENGINEER

Project Brief:

Project of KOC in Kuwait, Wet Crude Oil Gathering Centre comprising of wet crude storage tank, waste water treatment plant, Flare stack foundation, pipe support foundations, Condensate dryer, regeneration gas KO drum foundations, wash water pump foundation, walkways & stairs foundation, Compressor discharge & suction scrubber foundations, Separator & chemical injection foundations, Desalter heater & pump shelter foundations, Internal roads / pavements & earthworks like U/G Piping, Cable trenches, Drains, Manholes, backfilling etc.

Duties & Responsibilities:

Job responsibility involved preparation of overall project schedule comprising Engineering, Procurement, Construction, Pre-commissioning & Commissioning activities. Detailed acceleration schedule and project measurement procedures for work execution. Estimation of man hours for all the activities. Resource / Cost based weightage calculations and allocation to complete project schedule. Project progress measurement and updating of work schedules. Preparation of planned versus actual

overall & discipline wise progress S-Curves. Weekly analysis and preparation of three weeks look ahead and weekly / monthly project reports with bar charts. Preparation of MIS reports for all other projects in the requisite formats. Calculation & preparation of monthly & forecast cash flows etc.

Feb’ 2000 – Nov’ 2002

R.N.A BUILDERS & DEVELOPERS, MUMBAI

PLANNING / EXECUTION ENGINEER

Duties & Responsibilities:

Preparation of construction schedules for various residential & commercial building projects. Tracking various projects based on actual physical progress at site. Preparing weekly & monthly project progress reports.