Post Job Free

Resume

Sign in

Manager Plant

Location:
Jeddah, Makkah, Saudi Arabia
Salary:
35000SR
Posted:
December 04, 2020

Contact this candidate

Resume:

*

MOSTAFA KHATER

Long experience as PMV manager, operation &

maintenance projects, city cleaning bedding,

responsible for organizing, planning, coordinating and directing the operations of all equipment and vehicles for effective maintenance and repair programs, equipment safety programs and equipment use on company job sites. acts as a technical advisor on all equipment issues and assists the management team with equipment budgets and potential equipment purchases. As well batching plant manager responsible for mobilization, erection, organizing, operating, maintenance, recruiting staff & allocate cost

NAME: MOSTAFA ABD ELRAHMAN KHATER

Tel. no. : 009*********** KSA

E- MAIL : adic0g@r.postjobfree.com

EXPERIENCE

1. EMPLOYER: ABR contracting Riyadh Saudi Arabia

PERIOD: From Feb, 2020 Till

JOB TITTLE: Batching plant & PMV (Plant Machinery & Equipment) Manager Tasks:

Mobilize, maintain precast factories ( GPC Qwaeem, Asateer & Murciya ) precast factories ( tilt table line + Elematic precast lines for panels and hollow core ) as well start up & commissioning of Power house ( gen sets + replace sync panel & switch gear + main water storage and pump house + Chiller + water boiler used 4 curing hollo core and panels production line ) maintain all related moving equipment ( wheel loaders,fork lifts, speedy and bob cats )

Start the business of ready mix concrete starting from planning, lay out, procure all batching plant equipment ( batching plant, cooling tower, gen sets, laboratory and all required facilities required including workshop to control all equipment working in 5000 villas construction project of Precast units

Recruit required manpower to run the concrete production & equipment maintenance & repair

Upgrade and put in operation all used equipment procured by company including put the machines in proper condition to pass periodic inspection of traffic department 2

2. EMPLOYER: Muriya Tourism OMAN ( ORASCOM GROUP ) PERIOD: From Jun 2018 Till, Feb 2020

JOB TITTLE: Batching plant & PMV (Plant Machinery & Equipment )Manager Tasks:

Organize department with the available manpower to match department requirements

Oversee all daily operation of plant production, quality & safety

Control ordering raw material in harmony with required concrete in different sites

Upgrade, Refurbish and renovate batching plant,water supply system, Chiller, Transit Mixers & concrete pumps

Recruit required staff to run the job in batching plant, Equipment & workshop

Maintain all job sites and operation equipment ( Dozers, Loaders, Trucks, Cranes & transportation vehicles ) including pass all equipment & vehicles from traffic inspection for registration renewal as per OMANI traffic Law

3. EMPLOYER: BUSSINESS PROFISSIONAL INVESTMENT HOLDING COMPANY PERIOD: From Sept. 2015 TO Jun 2018

JOB TITTLE: EQUIPMENT MANAGER

Tasks:

Create process and procedures for workshop activities

Put the equipment fleet in excellent working condition in order to meet client’s conditions

Assessment of existing manpower (Staff. Technicians & operators)

Maintain all fleet at job sites

Keep asset list with proper coding

Cost analysis for all fleet in order to treat any trouble leads to extra cost

Issue financial report end of each month shows all cost parameters and Recoverable compare with expected budget (cost revenue budget) in order to highlight bottle necks 4. EMPLOYER: AL-MUHIDIB CONTRACTING COMPANY

PERIOD: From July 2012 TO Sept. 2015

JOB TITTLE: PMV EQUIPMENT MANAGER

Tasks:

Reorganize PMV department

Review & rectify PMV process to match actual activities & requirements

Lay out new equipment workshop which can occupies PMV activities including fabrication

Recruit required personnel to complete workshop staff

Budget cost revenue for company equipment’s used in projects

Assessment of existing PMV manpower ( Staff. Technicians & operators )

Advice methodology for construction equipment implementation as required for each project

3

Utilize company equipment at different project as each project requirements 5. EMPLOYER: EL SEIF ENGINEERING CONTRACTING COMPANY PERIOD: From Marsh 13th 2010 up to July 2012

JOB TITTLE: EQUIPMENT MANAGER

Tasks : Ensuring the efficiency and the effectiveness of the activities carried out by PMV which includes facilities, plant management, and operational activities related to plants, machines and vehicles by receiving and transferring them to the right place at the right time as per prescheduled plan and within company budget, assign proper tower cranes & required equipment ( placing booms, hoists, gen sets,vehicles …etc ) for various projects construction considering erection

& dismantle after projects completion.

Run transportation department in order to transfer all camps, plant,, materials to various projects Apply company procedure as to achieve optimum performance for documentation in order to insure proper records and required approvals for each process as planned. 6. EMPLOYER: SAUDAI BIN LADIN GROUP ( PRIMCO READY MIX) PERIOD: FROM NOVEMBER 1st 2008 up to Marsh 11th 2010 JOB TITLE: COMPANY EQUIPMENT MANGER

Tasks: 1.Prepair the plan for the company existing equipment & reallocate the available Manpower of the maintenance division to achieve the company goals as the solo Vendor for Saudi Bin Ladin ( ABCD ) for its projects inside kingdom. and start the concrete business market in various locations in the kingdom 2. Study the procurement of new equipment required to complete the company fleet over different locations

fleet of (12 patching plants with ice and shield water plants, 300 more transit mixer,35 concrete pumps,20 Gen set,20wheel loaders, aggregate

& sand washing machines no. of two crushing plants including vehicles

,dozers & loaders and all the necessary equipment to have integrated fleet ) 3. recruit required manpower to operate, maintain & repair the company fleet from various levels (engineers, supervision, operators, drivers, mechanics, electricians and all related jobs required for such kind of business ) 4. Prepare the proper suppliers for the required parts & supplies required to run the fleet ( fast moving parts, tires, oils & lubricants, electric components…etc 7. EMPLOYER : DALLAH GROUP COMPANY

PERIOD : FROM JUN 2004 UNTILL OCTOBER LAST2008

STUDY, BEDDING & FOLLOW UP DEPARTMENT

JOB TITLE : Equipment & study engineer

Tasks : 1. Study the new tenders for the different projects operation & maintenance Projects (city cleaning & airports), sewer projects & public services Projects within KSA & abroad.

4

2. Cost estimation for equipment, manpower & all other parameters reflected to projects cost over the project period

3. Assigning the proper equipment for the proper job including the technical

& financial comparison for different equipment & vehicles. 4. Mobilize the new projects with the different requirements of equipment’s

& Material as per the budget while study & tendering. 5. Follow up the equipment performance & related activities for all the Projects as well the erection of different equipment in the projects sites. 6. Evaluate & recruit the proper key position personnel for the operation & Maintenance activities

8. EMPLOYER SADAKA OPERATION & MAINTENANCE

PERIOD : FROM NOV2000 TO JUN 2003

JOB TITLE : EQUIPMENT & VEHICLES WORKSHOP MANAGER

FOR REYADH CITY CLEANING PROJECT

TASKS : 1. taking over the responsibility of the management of the REYADH CITY CLEANING PROJECT equipment & vehicles fleet (1000 more units)

2. Applying the company policy to maintain the equipment & vehicles standard to perform the services over the contract area & period to meet the contract conditions

3. Estimate the annual budget to maintain the fleet in running condition Considering the equipment service period & lifetime 4. Recruit the required man power to perform the required maintenance

& repair for the fleet & other facilities (landfill & power house) 5. Coordinating with the other departments to insure a smooth flow for the project activities.

9. EMPLOYER: ARCHIRODON CONSTRUCTION(OVERSEAS)(SIDIKRIR) PERIOD: FROM NOV1999 TO MAY 2000

JOB TITLE: EQUIPMENT WORKSHOP MANGER

TASKS: 1. taking over the responsibilities of repair overhaul& maintenance procedure & schedules for land, marine &transportation equipment. 2. Recruit the requested staff to improve the workshop performance according to work flow requirements & available skills locally schedules to various plan

3. Cost effectiveness analysis of man-hours & equipment running cost including depreciation, various direct & indirect cost 4. Supervise keeping full information about company equipment 5. Insure proper spare parts procurement up to most economic cost & implementing inventory control system for fast moving items. 5

6. Keeping the main contractor (BEHECTEL) safety requirements for both of marine & land equipment, workshop & workshop facilities 10. EMPLOYER : SAUDI BIN LADIN GROUP - SBD

PERIOD: FROM 10/8/93 TO 27/5/1998

JOB TITLE: EQUIPMENT WORKSHOP MANGER (SPECIAL BUILDING DEVISION)

TASKS: 1. taking over the responsibilities of maintaining the division achieve the Department tasks in accordance to their pre –determined schedule

2. Implement the system for the department as well for the tower cranes fleet for Refurbishing, preparation, Erection &operation. 3. Taking over the responsibility for the equipment & vehicles workshop of (ARAMCO) RAS TANURA REFINARY

UPGRADE PROJECT maintain the equipment &vehicles as per the client (ARAMCO)Standards, in Charge to maintain & supervise crane operation for lifting & rigging as per (ARAMCO G.I`S) fulfilling the safety requirements for RAS TANURA REFINARY offsite area

4. Equipment workshop manager for HAFER- ALBATIN project ( Construction of 300 villas) taking over the responsibility of the location equipment including their maintenance schedules planning

ACHIEVMENTS: 1. implementing the administration system in the department 2. Upgrading the location equipment for( ARAMCO –RASTANURA PROJECT) to reach ARAMCO standard for first time in company history. 3. Re- organize the site equipment administration, settlement of the link between the projects & equipment department 4. Increase the whole productivity of the department by Implementing the proper organization procedures

11. EMPLOYER : DEFRA MACHINE - LIEBHERR DEALEAR FOR EGYPT PERIOD : FROM 1/1985 TO 30/11/1992

JOB TITLE: SERVICE ENGINEER (LIEBHERR EATH MOVING & CONCRETE EQUIPMENT)

TASKS : 1. taking over the responsibilities of maintaining LIEBHERR earthmoving

& concrete equipment including receiving, erection, assembling, handling over & warranty services.

12. EMPLOYER : IRAQY DAMS ESTABLISHMNET

PERIOD : FROM 1/1984 TO 1/1/1985

JOB TITLE: EQUIPENT WORKSHOP ENGINEER

TASKS : 1. Taking over the responsibility to repair & maintain the different 6

locations excavators mainly LIEBHERR R982 excavators ATTEND TRAINING COURSES

COURSE NAME : technical formation for LIEBHERR excavators

Period : two weeks

LOCATION : COLMAR - FRANCE

COURSE NAME : special maintenance &service for 511 up to 541 LIEBHERR wheel loaders

Period : two weeks

LOCATION : KIRCHDORF - GERMANY

COURSE NAME : SLING INSPECTOR

Period : one day

LOCATION : ARAMCO RAS TANURA REFINARY- KSA

BIO DATA

DATE OF BIRTH: 28/ 5 / 1960

NATIONALITY: EGYPTIAN

MARITIAL STATUS: Married have 3 childs

ADRESS: 23, Yousef Street, Helwan, Cairo

QUALIFICATION : B.Sc. IN MECHANICAL ENGINEERING

HELWAN UNIVERSTY

Rate of appreciation: Very good

LANGUAGES : ARABIC & ENGLISH

COMPUTER SKILLS: MS. Office



Contact this candidate