Post Job Free

Resume

Sign in

Mechanical Engineer Engineering

Location:
Lagos, Nigeria
Posted:
January 06, 2021

Contact this candidate

Resume:

RAJI AHMED OLANREWAJU

** ****** ****** ******, *****, Nigeria +234 807-***-**** adi8a5@r.postjobfree.com https://www.linkedin.com/in/ahmedraji/

CAREER OBJECTIVE

3+ years engineering and project management experience, reputable mechanical engineer with proven leadership, team-work and organizational skills. Astute project engineer with extensive experience in piping design and equipment installation. Wide experience in planned maintenance, autonomous maintenance and total performance management (TPM).

TECHNICAL COMPETENCIES & SOFT SKILLS

AutoCAD 2D & 3D

Inventor

Aveva E3D

Microsoft Word, Excel

Microsoft PowerPoint

Verbal and Oral communication

Total performance management (TPM)

Planned Maintenance

Heavy equipment installation

Piping Design, Layout & Masterplan

Training and Education

Autonomous Maintenance

Breakdown Analysis

Contractor Management

Health, Safety & Environment

WORK EXPERIENCE

Petroprism Limited, Lekki, Lagos – Mechanical Engineer May 2020 - Till Date

Complete field work when required; Establish strong survey control networks. Integration of control networks with 3D terrestrial scanning data.

Create, maintain and update engineering drawings including piping plans, details, and schematics, equipment layouts, and P&IDs for company pipelines, terminals, and pump stations.

Assist engineers and field personnel with the design and revisions of pipeline pumping station and terminal drawings.

Assists in the development and implementation of company design standards. Field work is required that consists of walk-downs of facilities with field personnel to mark-up and revise required drawings.

Complete Piping Design and Layouts in accordance with Industry Practices using 2D & 3D Software.

Prepare construction documents which includes general arrangements, piping Isometrics, & piping plans.

Collaborate with installation crews on handling of product, timing, and supplies that may be required on site.

Produce designs that meet targets for feasibility, performance, costs, quality and safety.

Ensuring safety and quality control policies are adhered to.

Develop detailed design drawings and specifications for mechanical equipment, tools and controls.

Prepare equipment and piping component datasheet.

Perform site inspection and supervision of projects on site. Projects:

Chevron Angola offshore facilities (Banzala Bravo, Banzala Charlie, Takula, Fox & Hotel offshore). Maclevi Projects Limited, OPIC House Ogun – Mechanical Engineer July 2018 - March 2020

Design and implement cost-effective equipment modifications to help improve safety and reliability.

Closely monitor and supervise the Contractors / Subcontractors to ensure proper installation and commissioning of all mechanical installations.

Interacts with Project Managers to complete project scope related to drawing requirements, may be required to run prints and other Project Document deliverables or assist to prepare documentation packages for issue.

Generate CAD drawings (orthographic, plans and sections, and isometrics) to support engineering, interacts with other departments and/or suppliers to obtain pertinent information.

Develop as-built documentation (2D & 3D layout drawings), modification, optimization and upgrade of existing facilities.

Modify and revise designs to correct operating deficiencies or to reduce production problems.

Supervise shop workers ensuring they utilize safe, proper, and efficient methods in fabricating products according to order specifications.

Prepare equipment and piping component datasheet.

Prepare bill of quantities, material list and scope statement. Projects:

Caustic Filtration & Recovery (Nigeria Bottling Company Plant: Ikeja, Abuja, Asejire, Port Harcourt, Benin).

Water Savings (Nigeria Bottling Company Plants: Abuja, Challawa, Ikeja, Asejire, Owerri).

Plant Facility upgrade (Nigeria Bottling Company Plants: Abuja, Challawa, Ikeja, Owerri, Port Harcourt).

Effluent Water Treatment Plant modification and Upgrade (PZ Cussons, Friesland Campina).

Nigeria Bottling Company Preform Line Design (Benin Husky Line for production of pet bottles).

Nigeria Bottling Company: Ikeja Can Line Installation and Piping. NESTLE Nigeria Plc, Agbara Ogun – Assistant Technical Training Coordinator (NYSC) July 2017 – June 2018

Re-evaluate OEM’s (original equipment manufacturer) technical manual and training modules to suit shop floor reality.

Develop customized training module as per Nestlé standards and guideline for technicians and operators.

Develop key standard routines including cleaning, inspection and lubrication manuals, basic troubleshooting summary file, basic machine operations standard operating procedures (SOP).

Develop technicians and operators’ individual development plan and competency matrix.

Recruit and Train/Induct new entrants’ production technicians and operators.

Course Instructor of materials engineering module.

Coordinate training calendar and various technical workshop events.

Coach technicians on personal development to fulfil Nestlé Leadership Framework (NLF) objectives. NESTLE Nigeria Plc, Agbara Ogun – Maintenance Engineering Intern February 2017 – June 2017

Coordinate maintenance planning and schedule in alignment with production planning.

Develop and review of the maintenance and its effectiveness (i.e. preventive maintenance, corrective maintenance, condition-based).

Identify and capture opportunities for improvement in equipment maintainability and reliability.

Supervise and manage the maintenance activities for industrial services/utility equipment - air compressors, boilers, conveyors, pumps, cooling towers and chillers.

Analyze all types of technical documentation (Drawings, Manuals, and P&ID).

Survey the plant to evaluate specific maintenance as per proposed procedure.

Verify and propose maintenance plan & schedule according to manufacturer’s recommendations and/or field feed-back, local regulations and practices.

Analyze and verify plant/equipment design modifications, engineering and maintenance. NESTLE Nigeria Plc, Agbara Ogun – Project Engineering Intern July 2015 – December 2015

Assist in drafting installation project plans, including a work plan as well as a scope and approach document.

Manage and co-coordinate contractors to ensure successful project completion and assure the 100% working conditions prior to project hand-over.

Develop, modify and interpreted mechanical drawings to enhance successful project completion.

Manage installation of project as assigned from start to finish and responsible for any deviation of contractors’ installation from drawings.

Ensure good safety environment to work.

Perform all such project monitoring activities as instructed by the Project Manager.

Coordinates regulatory compliance activities. Provides project management status updates to clients. Fields queries from external stakeholders and coordinates responses.

Prepare work schedules and coordinate project staff. Projects:

Agbara Factory Steam Capacity Increase Project

Civil Works – Boiler House Building Expansion of 108m2 for the new 25 tons/hr capacity boiler.

Installation and Commissioning of boiler (25 tons/hr.) and associated reverse osmosis system, new feed water system and Deaerator.

Installation and Modification of high pressure steam distribution header, boiler gas and diesel line

Restructuring of the boiler control room –improved SCADA system facility to check and monitor steam generation operations.

Modification & Installation of retrofits on existing boilers (economizers and burner) and Installation of blowdown energy recovery system.

Participated in the boiler operations and reverse osmosis system training conducted by BOSCH.

Agbara Factory Warehouse & Production Area Fire Wall Project

Erection of structural steels support to hold the fire panels above the roof.

Installation of fire panels above & down the roof to serve as a barrier between the high and low risk areas.

Cladding of the fire panels above the roof to protect it from nature (rain). Karbak Ventures, Lagos – Maintenance Engineering Intern September 2011 – August 2012

Coordinate personnel on site to ensure maintenance objectives are satisfied.

Ensure good safety environment to work.

Develop maintenance plan and alignment with maintenance engineer on work scope.

Maintenance report to the Maintenance Engineer.

Statutory check on bottling line equipment (filler, bottle washer, Recrater, Decrater, Crate-washer, Depalletizer, Repalletizer, Labeler and Pasteurizer) and replacement of its accessories when necessary.

Routine check on conveyor sprockets, electric motors, guard rails, rotary shafts, chains and replacement of conveyor accessories when necessary.

Overhaul maintenance of bottling line.

Projects:

Routine and Comprehensive Overhaul Maintenance of Bottling Lines at Guinness Lagos Brewery Karbak Ventures, Lagos – Project Engineering Intern July 2010 – November 2010

Manage and co-coordinate sub-contractors and artisans to ensure successful project completion and assure the 100% working conditions prior to project hand-over.

Manage installation of project as assigned from start to finish and responsible for any deviation of sub-contractors’ installation from drawings.

Ensure good safety environment to work.

Prepare, interprete and modify mechanical drawings.

Collaborate closely with PM’s, cross-functional teams and all partners, internal and external

Initial review of tender documentation (i.e. scope of work, specs, drawings). Projects:

Plant Capacity Increase (Supervised By GEA Brewery System) at Guinness Lagos Brewery.

Installation of silos for malt storage and econometrics to automate the inlet and outlet flow in the silos.

Expansion of the lager vessel area (pipe works) to accommodate increase in malt volume upstream.

Expansion and modification of filtering line to accommodate high malt intake downstream (pipe works and installations).

EDUCATIONAL BACKGROUND

University of Lagos, BSc. in Mechanical Engineering (Second Class Honors.). 2016 Federal Polytechnic Ilaro, National Diploma (ND) in Mechanical Engineering (Distinction). 2011 Elibel Comprehensive Academy, West African Senior Secondary Certificate Examination (WASSCE) 2008 CERTIFICATION & WORKSHOPS

Occupational health and Safety Administration, OSHA Academy 2020

Diploma in Project Management, Alison Online Training. 2020

Capital investment planning workshop, Nestle Agbara Factory 2018

Principles of Project Management, Open University, Australia. 2018

Value stream engineering design (VSED) workshop, Nestle Agbara Factory. 2017

Operation management masterplan training, Nestle Agbara Factory. 2017



Contact this candidate