CURRICULAM VITAE

MOHAMMED SHOAEBUDDIN

BACHELOR’S DEGREE IN CIVIL ENGINEERING

MASTER’S DEGREE IN STRUCTURAL ENGINEERING

QA/QC CIVIL ENGINEER/INSPECTOR

ACI CERTIFIED* (Certification Id: 02048818)

ARAMCO AND SABIC APPROVED

ARAMCO REFERENCE NO: AC6-463

SABIC DOCUMENT NO: 01-0186-01

AZMEEL CONTRACTING COMPANY

SABIC MUTRAFIAH HOUSING PROJECT

JUBAIL – 35412

Iqama no : 237-***-****

(Transferrable)

Valid GCC- KSA License

Mobile no: +966- 548130722

+91-973*******

Email: adi1xk@r.postjobfree.com,

adi1xk@r.postjobfree.com

CAREER OBJECTIVE:

A challenging role in the construction firm and to pursue the path of excellence in technical domain.

WORK EXPERIENCE: 10 Years * (Gulf Experience- 6.5 years*)

1. Organization Details.

Position Held : QA/QC Civil Engineer/Inspector.

Duration : From 23 August 2017 to till Date, (Total- 42 Months).

Client : Sabic

Projects : Sabic Mutrafiah Housing Villas Project, Jubail

Firm : Azmeel Contracting Company

(Sub Contractor : Al Rashid Abetong Precast Factory, Riyadh)

Previous Project:

Position Held : QA/QC Civil Engineer/Inspector.

Duration : From 21 March 2016 to 22 August 2017, (Total- 18 Months).

Client : Saudi Aramco

Projects : Expand Dhahran Residential Community, Residential Villas Package-6,

(Saudi Aramco) Dhahran

Firm : Azmeel Contracting Company

(Sub Contractor : Al Rashid Abetong Precast Factory, Riyadh)

2. Organization Details.

Position Held : QA/QC Civil Engineer/Inspector.

Duration : From 14 August 2014 to 21 March 2016, (Total- 20 Months).

Client : Systra (Rayadah Investment Company)

Projects : King Abdullah Financial District (KAFD) Mono Rail Project, Riyadh

Firm : Saudi Oger Ltd.

3. Organization Details.

Position Held : QA/QC Civil Engineer/Inspector.

Duration : From 14 February 2014 to 10 July 2014, (Total- 6 Months).

Projects : G+20 Storey Residential Apartments

Firm : Hira Nandani Group of Construction Mumbai

4. Organization Details.

Position Held : QA/QC Civil Engineer/Inspector.

Duration : From 12 July 2010 to 11 January 2014, (Total-42 Months).

Projects : Prime Mall Commercial Complex G+6 storeys

Firm : Sherrieff Builders

PROFILE:

1. Flexible, adaptive, co-operative and a good team member with good communication skills.

2. Love to take new challenges and responsibilities, adjust quickly to organized, hardworking and systematic individual with a lot of time sense and foresight, strong grasping power and ability to update myself within very short time.

3. Seeking a responsible position to utilize my skills and abilities in the construction field and in related skills that offers professional growth while being resourceful innovative and flexible.

EDUCATIONAL QUALIFICATION:

M-tech and BE Credentials

QUALIFICATION

INSTITUTE

PERCENTAGE

MASTER’S IN STRUCTURAL ENGINEERING

P.D.A College of Engineering, Gulbarga(Autonomous Institution) Affiliated to Visvesvaraya Technological University, Belgaum, INDIA (2011-2013)

80%

BACHELOR IN CIVIL ENGINEERING

K.B.N College of Engineering, Gulbarga

Visvesvaraya Technological University, Belgaum, INDIA (2007-2011)

67%

TECHNICAL SKILLS:

1. STAAD-PRO

2. E-TABS & SAFE

3. AUTOCAD-2007

4. Primavera-P6

B.E. DISSERTATION

“ANALYSIS AND DESIGN OF MULTI STOREY COMMERCIAL BUILDING USING E-TABS”

MTECH DISSERTATION:

“FLEXURAL FATIGUE STUDIES FOR SFRC UNDER VARIABLE AMPLITUDE LOADING

FOR DIFFERENT STRESS RANGES”

Have Published papers in “International Journal of Engineering Research & Technology (IJERT)”, Volume 2,

Issue 9 (September-2013)

PERSONAL ATTRIBUTES :

Results and achievement oriented to high standards.

Strong communication skills.

Committed, motivated and passionate about Designing and Construction.

Fast and responsive-working to strict deadlines.

Supervisory and leadership skills

Problem-solving skills

Ability to work to deadlines and within budgets

OTHER SKILLS AND COMPETENCIES:

Familiarity with ACI (AMERICAN CONCRETE INSTITUTE) Accreditation, Testing programs, Inspection programs, and construction/specialist programs. (ACI CERTIFIED).

Familiarity with ISO-International organization of standards, ISO 9000, ISO 9001,

oISO 9001:2015 - sets out the requirements of a quality management system

oISO 9000:2015 - covers the basic concepts and language

oISO 9004:2009 - focuses on how to make a quality management system more efficient and effective.

oISO 19011:2011 - sets out guidance on internal and external audits of quality management

Systems.

ICS- International classification of Standards.

oICS 93-010 Related to civil engineering works,

oICS 93-100 Related to Construction of railways,

oICS-93 080 Related to construction of roads, Quality control.

oSound Ability to maintain an overview of entire projects while continuing to attend to detailed technicalities

oExcellent verbal and written communication skills

oNegotiating understanding of relevant design standards, including Euro codes, US British Standards, codes and Network Rail Standards.

oWell versed with ASTM, PCI & ARAMCO Standards, SATIP, SAES, SAIC, QMIS System, etc.

oExperience of working within a design consultancy.

Proven ability to work as part of a team, liaising directly with clients and other design team members

Motivated, self-starter

Possess Good communication skills.

JOB RESPONSIBILITIES :

1. Organization Details.

Position Held : QA/QC Civil Engineer/Inspector.

Duration : From 23 August 2017 to till Date, (Total- 42 Months).

Client : SABIC

Projects : Sabic Mutrafiah Housing Villas Project, Jubail

Firm : Azmeel Contracting Company

Previous Project:

Position Held : QA/QC Civil Engineer/Inspector.

Duration : From 21 March 2016 to 22 August 2017, (Total- 18 Months).

Client : SAUDI ARAMCO

Projects : Expand Dhahran Residential community, Residential Villas Package-6,

(Saudi Aramco) Dhahran

Firm : Azmeel Contracting Company

Job Responsibilities:

Perform all daily inspection and test of the scope and character necessary to achieve the quality of construction required in the drawings and specifications for all works under the contract performed ON or OFF site.

To review the relevant documents prior to start of construction e.g. IFC, project specification etc.

Pre-pouring, concrete pouring inspections as per ACI (American Concrete Institute) and PCI (Precast Concrete Institute) standard guidelines.

Performing Hot Weather and Cold weather concreting according to ACI 305R, ACI 306R and specifications.

Cary out inspection and checking for all quality related procedures in the site and ensures activity at the site are as per approved method statement and inspection test plan.

Inspect and monitor all finishing inspections, painting, flooring, tiling, internal doors as per specification and checklist.

Ensure all finishing works are done as per standards and project specification.

Ensure finishing works are done to perfection to make final appearance quality is superior.

Initial and final Painting and covers all imperfections, making sure it is done hundred percent.

Flooring & tiling works are done as per method statement and slope is maintained properly.

Monitoring the concrete test such as slump test, air content, and temperature of the concrete and unit weight as per ACI & ASTM and project requirements.

Maintaining architectural view of the finished works.

Checking and Final Approval of finished surfaces as per requirement.

Evaluate testing on freshly mixed concrete Using ACI C1064, C172, C143, C31, C231, C138 etc. to determine temperature, sampling, slump, making & curing concrete test specimens, air content, density etc. of fresh concrete, respectively.

Knowledge of Shotcrete concrete as per ACI 506R and specifications accordingly.

Testing programs as per ACI (American Concrete Institute), aggregate testing, cement testing field concrete testing, laboratory concrete testing, Masonry testing.

Assess the plant QC laboratory to determine that their equipment, procedures/techniques, sample recording and result reporting compliance with the applicable standards.

Batching, mixing, transporting, applying, finishing, testing and cleanup of shotcrete materials.

Witness water test for TDS and PH weekly.

Review all third-party test results.

Ensure that concrete batching records, Monitoring testing records and documents are properly maintained in accordance with the required project quality procedures and project specifications.

Monitoring Quality conformance, performance, specifications following code provisions.

Report to the QA/QC Manager, control, and monitor all activities related to Quality Management System, QMS.

Taking care of QA/QC document, punch lists, testing’s, maintain test records of the entire project including certificates, calibration, test results, inspection requests, non-compliance reports and site instruction/observations, permanent materials delivered and other QA/QC documents. Responsible for the closure of Non-conformance, NCR and Site Instruction, SI.

Issue NCR, NNC and Site surveillance reports for works not done according to method statement and standards.

Hold the work if not according to the ITP and Project specifications, and not to allow to proceed until produced corrective action measure.

Conduct periodic site surveillance inspection to the project in order to meet the required quality procedures and specifications according to ARAMCO Standards & US British Codes.

Maintain a clean copy of plans and specifications at site for easy reference, and documenting all revisions of plans with designated signature and initiating party.

Raise RFI @ the QMIS, 24 Hours before the actual inspection schedule.

Access to QMIS every now and then to reply log book entries (i.e., General comments, pro-active, standard violation) and closing of RFI.

Respond to client representative Log Book Entries (LBE) and introduce corrective actions and agreed completion date to eliminate Non-conformity.

Check and Verify request for inspection(RFI) to ensure completeness of supporting documents, SATIP, SAIC, applicable IFC Drawings, survey reports, test reports, and are properly filled up prior to performing inspection of client representative.

Review various test results (Compressive strength, soil report, field density test report, etc) to be submitted for review and approval of client, Saudi Aramco.

Prepare (ITP) Inspection test plan and Method statement for special process activities prior to start new activity on the job site.

Prepare monthly reports for compaction testing (FDT) Compressive strength (28 days), soil testing, Asphalt test, and update and maintain the quality record for the future references.

Assist QA/QC Manager in preparation of reports, schedule of inspection for two weeks forecast of works, inspection test plan, documents review, and Batch plant approval for Asphalt and concrete.

Mould checking as per IFC Drawings and confirming all embedded items as per drawings.

Following ACI 305R for hot weather concreting to prevent shrinkage, warping of concrete.

Inspect & verify that material and accessories are new, unused, free from damage and in accordance with Saudi Aramco approved project design drawings, diagrams, schedules, lists, databases, and associated design documents.

All quality related inspections for precast elements as per PCI Manual.

Witnessing and sentencing of all precast elements inspections within their disciplines.

Insuring work is carried out as per ITP, PIP and as per requirement of the client with quality standards.

For sandwich wall panels checking for any mixing of colored concrete over the finished front face.

Implementing ISO 9001-2005 Quality management system.

Report to the QA/QC Manager, control, and monitor all activities related to Quality Management System, QMS.

Responsible for the quality and workmanship of every activity, thorough knowledge of all phases of engineering construction relating to Civil, Architectural and Structural discipline interfacing the multidisciplinary operations.

Carry out Internal Audit at the site as scheduled in the Project Quality Plan, PQP.

Following Saudi Aramco inspection test plan (SATIP), Saudi Aramco Inspection Procedures (SAIP) to provide uniform and standardized method for specific inspections.

Checking finished surface of wall panels should be as per Mock up sample prepared & PCI.

Maintain the Architectural view of the precast panels.

Final inspection of precast elements as per finished color shade of proposed villa houses.

Inspection of finished precast elements as per Saudi Aramco Engineering Standards (SAES) before delivery.

Supervising & preparing weekly reports and casting schedule and delivery schedule for all factories and submitting to the QA/QC Manager.

Following PID instructions and comments to be followed strictly at site.

Follow up the closure of internal Log Book Entries (LBE)/ NCR’s to construction project engineer and crew for effective implementation of project quality plan, ITP’s, written procedures, project specifications, IFC Drawings, etc.

Ensuring Pre-concreting and Concrete pouring inspections are followed according Aramco guidelines.

Prepare Surveillance reports, Non-conformance reports when required to prevent non-conformance in the works.

Well versed with US British codes, UBC, ASTM and ARAMCO standards, SAES, SATIP, SAIP, SAIC, etc.

Ensuring strict safety rules are followed throughout the project work.

Supervising, Preparing and following up the (CAR/PAR) Corrective/Preventive action report.

Attend the weekly meetings.

2. Organization Details.

Position Held : QA/QC Civil Engineer/Inspector.

Duration : From 14 August 2014 to 21 March 2016, (Total- 20 Months).

Client : Systra (Rayadah Investment Company)

Projects : King Abdullah Financial District (KAFD) Mono Rail Project, Riyadh

Firm : Saudi Oger Ltd.

Job Responsibilities:

Cary out inspection and checking for all quality related procedures in the site and ensures activity at the site are as per approved method statement and inspection test plan.

Monitoring and administering the QA/QC Plan or Programme and ensuring incorporated materials on construction projects are in compliance with the plans and specifications.

Assuring that the work is performed as required by the contract and meets or exceeds the required qualities.

Assuring the acceptable quality of materials, processes, and workmanship in the project work.

Issue materials receiving report for the delivered materials.

Planning capabilities, Understanding of building structure Sharp drawings and decision analysis Data Analysis Budgeting and forecasting.

Preparing reports, designs and drawings of structural elements dictated by Project requirements

Coordinating with architects, service consultants, site etc., to reach agreement about safe designs and how they may fit in with the aesthetic concept of the construction

Monitoring preparation of civil structural BOQs & technical deliverables for operating jobs.

Communicating the design of a structure through drawings, specifications to site team, monitoring and inspecting work from time to time.

Review project deliverables and objectives and update to their peer head

Knowledge of Wet concrete mixture conveyed through high pressure hose/ nozzle onto designated surface.

Batching, mixing, transporting, applying, testing, and clean up shotcrete concrete and materials as per ACI- 506R, ACI 5062 specifications.

Familiar with the different methods of shotcrete as per ACI & application and the appropriate use of method for a particular design surface and function.

Checking and confirming mix proportions of cement, aggregate and admixtures to obtain the specified strength.

Waterproofing checking underground level and in wet areas in the building.

Following up the concreting works in a presence of the Engineer or Consultant, slump test and cubes preparation for the compressive test.

Threading and Stressing of Strands as per designed pressure forces of structural designer.

Grouting of tendons at specified inlet pressure.

Pre-tensioning and Post tensioning stressing of stressing strands as per approved method statement.

Pre-tensioning of I-Beam Girders with as long spans.

Checking Loss of pre-stressing force, due to slip anchorage or relaxation of steel stress.

Coordinate, supervise and manage Main Contractor / Subcontractor PT installation team to ensure correct procedures and installation of the works is carried out to the drawings and specifications.

Monitor and ensure quality of work of Main Contractors / Subcontractors PT installation Works, ensuring that inspection and test plans (ITP’s) are prepared, reviewed, approved, and implemented.

Identify problems and discuss method(s) of rectification to ensure quality of work improves.

To check the Post Tensioning Design for compliance with relevant codes (design for the Post tensioned Slabs is being carried out by a leading International Structural Engineering Consultant).

Witnessing Rebar cage, Pt ducts, walkways inserts, chamfer, air vent as per approved drawings.

All quality related inspections of Viaduct and Guide way beams as per AASHTO Standards.

To initiate the RFI’s for Client’s witness of inspection points as per ITPs.

To review the relevant documents prior to start of construction e.g. IFC, project specification etc

Erection of pre-casted elements or guide beams with all quality conformances.

Ensuring all materials are approved and comply with ACI & ASTM Standards.

Ensure that all inspection reports are accurate and that all attached documents are current status.

Ensure all work is correctly prepared prior to any inspection being undertaken.

Reviews operating procedures, technical manuals and production schedules to determine method of conducting inspections and audits, sequence of operations and work assignments to assure all procedures are being undertaken correctly.

Ensure calibration and maintenance of equipment is recorded, tracked and performed.

Finishing plaster corrects small imperfections & scratches from main plastering.

Ensuring Quality plastering as it is very important before painting is done.

Plastering of Block works & ceilings to make even surface and overcome imperfections.

Checking geometrically straight and smooth right angles where walls meet.

Finishing of Depot building for the service of Mono rail.

Ensure that inspections are carried out in accordance with ITP’s and procedures.

Ensure nonconforming products and processes are identified, recorded, investigated and corrective action implemented.

Prepare Surveillance reports, when required to prevent non-conformance in the works.

Prepare non-conformance reports to the QC manager and assist in developing corrective actions

Preparing and following up the (CAR/PAR) Corrective/Preventive action report.

Audits and monitors quality requirements in accordance with program quality assurance policies and customer specifications.

Preventing NCR and following up to the site engineer for closure of all pending NCR’s.

Implementing ISO 9001-2005 standard in quality management system.

Review work procedures and method statements for compliance with good work practices and the customers.

Assisting Quality Assurance and Quality Control Engineer such as steel reinforcement checking same as in construction drawing.

Following up the concreting works in a presence of the Engineer or Consultant, slump test and cubes preparation for the compressive test.

Finishing work checking in a presence of the Engineer or Consultant, block, plaster, painting, tiling, kitchen cabinets, wardrobes, ceiling and light fittings.

Maintain standards of safety and comply with Company’s Health, Safety and Environment Management System requirements.

Surface finishing works as per Approved surface requirement of Bombardier Monorail.

The completion of QC site instructions and coordinate their closure. The review of inspection test packages during the course of construction activities.

Well versed with ACI, ISO, & Saudi Arabian Standards Organization (SASO).

3. Organization Details.

Position Held : QA/QC Civil Engineer/Inspector.

Duration : From 14 February 2014 to 10 July 2014, (Total- 6 Months).

Projects : G+20 Storey Residential Apartments

Firm : Hira Nandani Group of Construction Mumbai

Job Responsibilities:

Examining and reviewing structural drawings.

Measuring works and preparing bar bending lists and quantification reports.

Preparing Bar Bending Schedule in Excel with bar bending format.

Consulting with Structural consultant for Steel Design.

Perform all QC quality related works with site engineer to follow up clients requirements.

Checking the steel on site as per the Design to client.

Preparations of approved material requirement report, Make MIR and follow up with supplier and rejection of material, which does not confirm specification as per ACI & ASTM.

Checking plastering as it is very important before painting.

Finishing of building, floor finishing, wall finishing, ceiling finishing.

Co-ordination with Architect, RCC Consultant & Client for Planning & progress.

Finished Architectural surfaces as per Approval from Architect.

To initiate the RFI’s for Client’s witness of inspection points as per ITPs.

The issuance of non-conformance reports in conjunction with the site QC team.

Prepare surveillance and Corrective actions reports.

To check the material like brick, concrete, sand, cement etc. according to the standard and execute the work smoothly by labors.

Finishing works of base coat plastering to final coat to avoid unduly uneven surface.

Visit Architects, Structural Consultants and any other outside offices as per instructions by Project Engineer or in absence of him.

Check any rectifications of structural and finishing work check the daily progress reports.

Finishing works are done as per Architect requirement, and maintain good aesthetic view of the finished structure.

Maintain the Exterior and interior finishing of building and structure to enhance their services and aesthetic qualities.

Plastering, Floor finish and Painting works as per approved Design.

Maintain quality of finished works and control wastage of materials at site.

Ensuring strict safety rules are followed throughout the project work.

Attend to the visitors and clients.

Well versed with ACI, ASTM and concrete manuals of IS 456 Indian standards.

4. Organization Details.

Position Held : QA/QC Civil Engineer/Inspector.

Duration : From 12 July 2010 to 11 January 2014, (Total-42 Months).

Projects : Prime Mall Commercial Complex G+6 storeys

Firm : Sherrieff Builders

Job Responsibilities:

Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives.

Setting out leveling and surveying the site.

Checking plans, drawings and quantities for accuracy of calculations;

Ensuring that all materials used and work performed are as per specification ACI & ASTM Standards..

Overseeing the selection and requisition of materials and plant as per ACI & ASTM.

Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project;

Managing, monitoring and interpreting the contract design documents supplied by the client or architect;

Liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project;

Coordination with Architects to prevent small imperfections which may affect the aesthetic view of the total finished structure.

Liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress.

Day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors;

Planning the work and efficiently organizing the plan and site facilities in order to meet agreed deadlines.

Providing expansion joints at intervals for tiling flooring as stated by Architects.

Plastering, painting and floor finishing work as per Approval.

Resolving any unexpected technical difficulties and other problems that may arise.

Review Contractor ITP to identify Inspection & Testing monitoring activities.

Provide QA/QC leadership and guidance to the Civil Construction team.

Finishing of building, floor finishing, wall finishing, ceiling finishing.

Finishing works are in accordance with ISO standards.

Review quality records and certifications ensure records they maintained and ready available.

Perform independent auditing, surveillance and observations.

Ensuring strict safety rules are followed throughout the project work.

Collate information and prepare weekly/ monthly activity report.

Well versed with ACI, ASTM and concrete manuals of IS 456 Indian standards.

DECLARATION:

I hereby declare that all the details furnished above are correct & true to the best of my knowledge.

Note: Should any further information, educational certificates or any experience letters be required, I would be pleased to provide the same upon request.

(MOHAMMED SHOAEBUDDIN)



Contact this candidate