Post Job Free

Resume

Sign in

Power Plant Engineer (electrical)

Location:
Paisar, Chhattisgarh, India
Salary:
6 lakh per annum
Posted:
December 29, 2020

Contact this candidate

Resume:

CURRICULAM VITAE

Email:adi0j5@r.postjobfree.com SONWANI

Experience:15year C/O Vipin sonwani

Village-Narotikapa

Po- Lamer

Distt: Bilaspur, Chhattisgarh

Mb. No. 078********

.

OBJECTIVE:

Seeking an opportunity for professional challenge and growth to support and enhance co-operative objectives of the companyacross Thermal / Oil & Gas / Power Sector.

SUMMRY OF SKILLS:

●Nearly 15 +years of progressive experience in Operation,Maintenance, Errection, Commissioning &Testing ofTHERMAL POWER PLANT (up to 6x600MW and 400KV system).

●Hand on experience of Erection/Testing/Commissioning of power plant MPH/Switchyard and other balance of plant equipment.

●Testing & commissioning of power plant electrical equipment like generators, GT,UAT transformer, excitation systems, switch gear, high voltage cable routing,andProtection systems.

PRESENT ORGANIZATION: RASHI STEEL&POWER PVT.LTD.VILLAGE PARAGHAT JAIRAMNAGAR

DIST.BILASPUR CG (PALLET-0.4MTPA,BENIFICATION-1.2MTPA)

DESIGNATION : SENIOR ENGINEER

DURATION : (AUG.2018 TO TILL DATE)

ROLES & RESPONSIBILITY

●Operation and maintenance of auxiliary system.

●Operation & Maintenance of DG SETS for providing uninterrupted power supply

●Startup & shutdown activities of the plant changeover of the main and auxiliary equipment as per schedule .

●Preparation of standard operating procedures, emergency procedures, isolation and normalization procedure.

PRIEVIOUS ORGANISATION:

Organization : VOLTECH O&M GROUP, AT KSK MAHANADI POWER CO. LTD .NARIYARA(C.G.) 6X600 MW TPP

Designation : SENIOR ENGINEER.

Duration : (MAY-2014 TO APR-2018)

ROLES & RESPONSIBILITY:

● Electrical operation & maintenance of 6x600MW )power plant &auxiliaries, which include improvement in equipment avibility through TBM&CBM (time based maintenance &condition based maintenance )&shut down/breakdown/predictive/preventive maintenance of all electrical equipment .

●Preparation of energy report, updated history cord, breakdown/shutdown report,energy consumption & energy baLance.

●Maintanance of station transformer (88MVA,400KV/11KV), Unit Aux. Transformer (40MVA,400/11KV),Generator transformer(3x250MVA,400/11KV) and 2500KVA LT Transformer.

●Maintenance of 11KV and 415V switchgear.maintanance of various Motor of 11KV&415V.

●Operation and maintenance of ESP

PREVIOUS ORGANIZATION:

1. Organization : OPERATIONAL ENERGY GROUP OF INDIA PVT.LTD. (2X43 MW CPP)

AT ARASMETA CAPTIVE POWER COMPANY PVT.LTD. GOPALNAGAR

DIST.- JANJGIR-CHAMPA CG

Designation : ENGINEER

Duration : APRIL 2010 TO MARCH 2014

RESPONSIBILITY:

● Electrical operation & maintenance of 86 MW(2x43 )power plant &auxiliaries, which include improvement in equipment avibility through TBM&CBM (time based maintenance &condition based maintenance )&shut down/breakdown/predictive/preventive maintenance of all electrical equipment .

●Preparation of energy report, updated history cord, breakdown/shutdown report,energy consumption & energy balance.

●Supervision of erection and commissioning of Generator (2X43MW) BHEL MAKE and Generator Transformer (47/57MVA, 11/132KV), SAT. UAT. AVR, excitation system (BHEL), 6.6 KV HT Panel (Crompton Greaves) and 415V LT panels (C&S) and drives,(SIEMENS

2. Organisation : SINGHAL ENTERPRISES PVT LTD.TARAIMAL DIST.RAIGARH CG(2X8MWCPP)

Designation : SHIFT ENGINEER

Duration : (JAN.2007 TO MARCH 2010 )

●RESPONSIBILITY: Operation and maintenance of 2*8 mw cpp & auxiliary system

●Testing & Commissioning of Transformer including IR value, Short ckt test, Vector group, ratio test, winding resistance, magnetizing current, tan delta. Stability & Charging of Transformer.

●HT motor testing & Commissioning, stability of motor & their charging.

●condition based maintenance/shut down/breakdown/predictive/preventive maintenance of all electrical equipment .

3. Organization : SIDDHI VINAYAK SPONGE IRON PVT. LTD.,

VILL- PUNJIPATHRA,DIST.- RAIGARH ( 2*100TPD)

Designation : JUNIER ENGINEER

Duration : FEB.2005 TO NOV. 2006

RESPONSIBILITY:--

●Operation and maintenance of auxiliary system.

●Operation & Maintenance of DG SETS for providing uninterrupted power supply

●Startup & shutdown activities of the plant changeover of the main and auxiliary equipment as per schedule .

●Preparation of standard operating procedures, emergency procedures, isolation and normalization procedure.

4. Organization : RADHA MADHAV SPONGE IRON PVT. LTD.

VILL- BODRI, DIST.- BILASPUR (100TPD)

Designation : JUNIER ENGINEER

Duration : DEC.2003 TO JAN. 2005

RESPONSIBILITY:--

●Supervision of erection and commissioning of electrical auxiliaries.

●Operation and maintenance of auxiliary system.

●Operation & Maintenance of DG SETS for providing uninterrupted power supply

●Startup & shutdown activities of the plant changeover of the main and auxiliary equipment as per schedule .

●Preparation of standard operating procedures, emergency procedures, isolation and normalization procedure.

PROFESSIONAL QUALIFICATION:

●2001: Passed DIPLOMA in Electrical engineering with 56.6% marks at govt .polytechnic raigarh RAJIV GANDHI TECHNICAL UNIVERCITY- BHOPAL

●1994: Passed Higher Secondary Examination with 50.2% marks (MP BOARD BHOPAL).

●1992: Passed High school Examination with 56% marks (MP BOARD BHOPAL).

DECLARATION:

I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.

PLACE :

DATE : RAJKUMAR SONWANI



Contact this candidate