Post Job Free

Resume

Sign in

Surveyor Project

Location:
Sharjah, United Arab Emirates
Salary:
6500
Posted:
November 18, 2020

Contact this candidate

Resume:

EDUCATION/QUALIFICATIOS

*- ******* ** ****

Surveying from

P.M.D.C. Surveying

Institute of Pakistan

*- *********** ****** **

Computer Sciences.

*- ********* ** *******

LANGUAGES

Arabic, English, Urdu

OTHER

Length of service in the

profession: 18

Present location:

Sharjah / UAE

Security clearance: NA

STATUS VISIT VISA

Nationality: Pakistan

E.mail:

adhypk@r.postjobfree.com

MUHAMMAD BOSTAN

LAND SURVEYOR MOBILE, 052*******

Muhammad Bostan has over 18 years in civil construction / supervision. Civil and with the best knowledge & qualifications in Occupational Health & Safety. Buildings and Infrastructure development, highways and bridges, utility services, Road work, bridge, parking area, sewerage, drainage, HV, LV and street lighting network, etisalat, irrigation, landscaping and Sewerage, Storm HDPE lined lakes.

Land surveying –Traverse and triangulation observation and computation, topographic survey, analysis of survey data and plotting of drawings, establishment of control points, cross section, long section, fixing of road IPs, sewerage manholes, chambers, kerbstone, services and ducts. Submittals – Reviewing shop drawings and as built drawings. Quantities – Measurement of completed work. Calculating quantities for earth work, road work, parking areas and services. Carryout surveying works according to drawing, specification and work procedure using the latest surveying tools and equipment like Total station and GPS.Worked on Buildings, Airport, Roads, Bridges, Sewerage, Storm water and Landscape Projects as well.

Experience in Design and Construction.

Good knowledge of survey and attending site progress meetings discuss relevant issues and solve problems.

Good Experience in Buildings, Roads, bridges, Sewerage, Storm water, airport projects as senior surveyor.

Employment Record

2019 to March 2020 land Surveyor, Bharia Town Islamabad.

2017 to 2019, Land Surveyor, Best way Co. Pakistan

2010 to 2016, Land surveyor, Saudi Oger Ltd. Jeddah. SAUDI ARABIA

2007 to 2009 Land surveyor, Khatib & Alami Consolidated Engineering Co. Dubai U.A.E.

2003 to 2007, Land surveyor, Al Omaier Trading and Contracting Company. Riyadh. SAUDI ARABIA

2000 to 2001, Land Surveyor, Habib Rafiq Pvt. Ltd. Islamabad. Pakistan.

1998 to 2000, Land surveyor, Frontier Work Organization Pakistan Areas of Expertise

Good Experience in Buildings, Roads, Infrastructure projects, Bridges, Airport taxiway, Housing Schemes, Town Planning, Sewerage, Storm, and Drainage Pipe lines Works Projects.

Experience in Design and Construction.

Good knowledge of survey and attending site progress meetings discuss . relevant issues and solve problems

Skills/Expertise: Microsoft Office Word, Excel, Auto Cad Document No. (JETT) 1

MUHAMMAD BOSTAN

LAND SURVEYOR MOBILE, 052*******

Relevant Project Experience.

Start/End Dates: 2019 to March 2020

Project name, location: Bharia Town, Housing Scheme, Islamabad. Client: Bharia Town Islamabad. Pakistan.

Title: Land Surveyor

Scope/Description: Buildings, Internal roads, footpath, utility services, Sewerage & Storm water lines &. Manholes

Responsibilities:

Layout/Setting out for Buildings and roads, parking, footpath, utility services, Sewerage & Storm water lines, man holes.

Demarcation of residential, commercial & Agricultural plots as per design data of Town planning department. Project name, location: Construction of Best Way Cement Co. Hattar. Pakistan Client: Best Way Cement Co.

Title: Land Surveyor

Start/End Dates: 2017 to Aug.2019

Scope/Description: Buildings, Roads, drainage, box culverts, Infrastructure, and Housing Colony Including the modification of existing Housing flats. Roads, Storm &Sewerage pipe lines.

Responsibilities:

Preparing the As-Built AutoCAD drawing and check the co-ordinate and level are in tolerance or not.

Setting out the survey work for different activities.

Layout of wall, formation, road base, infill concrete.

Layout of Boardwalk way.

.

Project name, location: Haramain High Speed Rail Project (HHSR)Jeddah Railway Station, Dafah ul Madni Project, Jeddah. Qunfidah, Laith, Thriban. (Jazzan Road.) Buildings &Internal roads and Railway station work. SAUDI ARABIA Client: Saudi Railway Organization, (SRO) Govt. of Saudi Arabia Title: Land Surveyor

Start/End Dates: 2015 to 2016

Scope/Description: Buildings, Railway station, kerbstone,, footpath, sewerage & storm water line, crossing duct for Utility services, electric pole, and Feeder pillar. Project name, location: King Abdul Aziz International Airport. Jeddah. Saudi Arabia Modified Terminal Projects (Car Parking),300 m Tunnel. Jeddah, Saudi Arabia Client: Jeddah Airport Authority

Title: Senior Surveyor

Start/End Dates: 2013 to .2014

Scope/Description: Pilling, car parking foundation, utility services. MUHAMMAD BOSTAN

LAND SURVEYOR MOBILE, 052*******

Responsibilities:

Setting out of survey work for different activities.

Review shop drawings for survey work.

Inspection of finished works.

Check shop drawing for Pilling construction.

Keep all survey data up to-date.

Create permanent Control Points for controlling the project and shifting

Co-ordinate for these control points with triangulation method.

Shift bench mark (levels) at these control points with higher precision (with electronic level). Project name, location: APHA / YAMAMA /NASCO Riyadh SAUDI ARABIA Client: SAUDI GOVERNMENT

Title: Land Surveyor

Start/End Dates: 2011 to Dec.2012

Scope/Description: Modification in Kings Palace, Construction of Army Villas, Internal roads, footpath, utility services, Sewerage & Storm water lines Project name, location: Princes Noura Bint Abdul Rahman University. Riyadh SAUDI ARABIA Construction of Buildings, Internal roads, sewerage & storm water lines Riyadh. Client: Government of Saudi Arabia.

Title: Land Surveyor

Start/End Dates: 2010 to 2011

Scope/Description: Buildings PN 02, PN 07, Liburary Building, internal roads, drainage, box culverts Responsibilities:

Layout/setting out of Buildings, roads, services, drainage, ducts, channels and box culverts.

Topographic surveying and plotting in different scale.

Site measurement for monthly/final valuation.

Project name, location:1. DUBAI GULF CITY. 2. DUBAI MOTOR CITY& DUBAI INVESTMENT PARK Buildings, Internal roads/infrastructure, sewerage & storm water lines in DUBAI Client: DUBAI GULF CITY, DUBAI INVESTMENT PARK.

Title: Land Surveyor

Start/End Dates: 2007 to 2009

Scope/Description: Buildings, Villas, Internal roads, roundabout, kerbstone, crossing duct for utility services,

sewerage, storm water, manhole.

Project name, location: 1-Construction of Road from Samira To Mahlani, including Sewerage, Storm water, Services.

2- Uqla tul Satoor Round about to Mahlani Road about 14 km dual Carriageway. Client: Ministry of Roads and Transport Authority. SAUDI ARABIA Title: Land Surveyor

Start/End Dates: Mar.2006 to 2007

Scope/Description: Road, sewerage & storm water line, footpath, kerbstone utility Services MUHAMMAD BOSTAN

LAND SURVEYOR MOBILE, 052*******

Project name, location: Majmah Hafar Al Batin Road Project. SAUDI ARABIA Roads / infrastructure project in Riyadh Saudi Arabia Client: Ministry of Road and Transportation. SAUDI ARABIA Title: Land Surveyor

Start/End Dates: .2003 to 2006

Scope/Description: Road, Bridge piling, structure, abutment, piers, and utility services Responsibilities:

Setting out of Roads, bridges, piles, abutment & piers.

Layout of pedestrian underpass base slab, walls & roof slab.

Setting out of underpass base & wall etc.

Checking of profile and cross section, setting out as per horizontal and vertical alignment.

Calculating quantities & site measurement for valuation.

Controlling work as per drawing/design

Setting out of roads IP, Bridges, culverts, water supply pipe lines. Project name, location: Defence Housing Scheme. Phase II, Islamabad Pakistan. Internal roads including Sewerage, Storm water, Services Client: D.H.A. Islamabad

Title: Land Surveyor

Start/End Dates: Feb 2000 to Dec 2001

Scope/Description: Housing Scheme, Buildings works, canal, sewerage, storm water manhole & Chamber, street light pole, utility services

Project name, location: Rohri Sukkar By Pass Project. Pakistan Client: National High way Authority, Govt. of Pakistan Title: Land Surveyor

Start/End Dates: 1998 to 2000

Scope/Description: Topographic survey in different area, roads work, bridge, water supply, sewerage, storm water Pipelines

Responsibilities:

Setting out of Bridge, roads, sewerage, storm water pipe lines.

Topographic surveying and plotting in different scale.

Contour survey and plotting in different intervals.

Traversing and triangulation observation and computation.

Earth work quantity calculation by cross section, Simpson rule and trapezoidal method. Reference/s

Muhammad Rafiq

R.E. Altorath

Mobile 055*******

E. mail: adhypk@r.postjobfree.com

.



Contact this candidate