nwpore we. AL ****
seLder or velding cperston's sams TAHER A.K.ABU EL YAZEID deeiticntion 31006
siding process ait sama ¥ setlienae cs: eae
renision 3G (UPWARD)
{rte nerkseatal evrheed or vortient-it versie
tn ancoraane wish peontare spent easion so.
Dianoter ana vel thicmase (At pipe) -othareiae jist thihaase) on
1 vaather upward oF dowmened
FILLER METAL
apecttioation wo, E7638 Clasaitication AMD 25.1 rae
Describe fAiler metal (4E sot covered by AME apecitication)
VISUAL INSPECTION
Bopencance ACCHPTHD —Uadereut_ ACCEPTED Piping porosity ACCEPTED
we arate tee nensite
tase contucted by Laboratory bast 2.
Aepescance
(Describe the Location nutare,and ‘taaring of the specines.)
Test contucted by aborttory teat no
RADIOGRAPHIC TEST RESULTS
Tere witnessed by mG. Pann HL ram
as cerveyor dopeove ete
Surveyor provided welder ts been engaged in type of welding covered by Wie certit
For updating this Certificate, see overl
A123Ax0045