Post Job Free

Resume

Sign in

Civil construction

Location:
Palm Bay, FL
Posted:
November 17, 2020

Contact this candidate

Resume:

Skills/Certifications/Training

Quality Control

Excavator Operator – GPS/Non GPS

OSHA 10 & 30

Scheduling

Dozer Operator – GPS/Non GPS

MSHA – 8 Hour

Conflict Resolution

Front End Loader Operator

DEP Stormwater Inspector Certification (SWPP)

Organizing and Planning

Grader

Confined Space Trained

Judgement and Decision Making

Bobcat Skid-Steer

CPR Certified

OSHA/FRA Specification Compliance

Backhoe

Urinary Analysis Certified

Change Orders

Proficient in Microsoft Office

Competent Person

Civility and Respect

HCSS

Experience

HSR Constructors

May 2020 – Present

HSR is joint venture company consisting of Herzog, Stacey and Rail Works, contracted by Virgin Trains to construct the Bright Line project stretching from Vero to Cocoa. The scope of work includes railroad extensions, bridge improvements, railroad crossing improvements and drainage improvements.

Ensured all OSHA standards were met or exceeded during ongoing operations.

Read and interpreted site drawings, plans and specifications for railroad track and civil construction. Inspected and supervised the on-site tradesmen for compliance.

Responsible for ensuring a safe working environment. Led by example. Provided daily tasking of on-site tradesmen and ensured all materials and resources are in place to meet the daily schedule. Coordinated closely with sub-contractors, local FEC inspectors and RWIC as needed or required. Gave weekly safety briefings to all tradesmen expected to work on the job site.

Responsible for project scheduling to include density testing, RCP, headwalls, brick and mortar, 57 stone, concrete, and trucking companies as well as heavy equipment moves.

Responsible for daily team safety meetings such as critical lifts and drainage pipe installation, in a high-risk environment around active railroads. Wrote daily job hazard analysis and updated according to task changes.

Responsible for install of 18 – 96” RCP for drainage extensions under railroad.

Directly responsible for removal and installation of headwalls, forming and pouring concrete collars, installation of 18 – 96” RCP for drainage extensions under railroad.

Coordinated with locators to ensure all underground utilities remain intact and are not in conflict with new construction.

Reviewed project documents and plans to ensure work in the field is built to the most recent specifications and drawings.

Performed production reports, timesheets, equipment logs, inspection reports, change orders and updating project files.

Trained and motivated workers to increase efficiency and quality.

Collaborated with and frequently provide status to customers to ensure compliance and high level of customer satisfaction.

Conducted periodic reviews with each team member to promote personnel and professional development in support of company goals and objectives.

Finished Installation of all associated pipe and Headwalls before schedule and underbudget with a “skeleton crew” during every operation.

Dp Development

September 2019 – April 2020

Pipe Foreman

Dp Development is a general contractor based out of West Palm, Florida. The scope of work includes but is not limited to underground utility work, drainage development, water and wastewater plants, federal government work, roadway milling and paving, concrete flatwork, earth work and road building.

Ensured all OSHA standards were met or exceeded during ongoing operations.

Read and interpreted site drawings, plans and specifications for civil construction. Inspected and supervised the on-site tradesmen for compliance.

Responsible for ensuring a safe working environment. Led by example. Provided daily tasking of on-site tradesmen and ensured all materials and resources are in place to meet the daily schedule. Coordinated closely with sub-contractors, local inspectors as needed or required. Gave weekly safety briefings to all tradesmen expected to work on the job site.

Maintained Crew of (6) men including Excavator operator, Loader operator, Pipe Layer, Tail man, hillman, laborer. Tasked each of these men daily with their specific roles, goals, and places

Responsible for project scheduling to include density testing, delivery of RCP, headwalls, brick and mortar, 57 stone, concrete, and trucking companies as well as heavy equipment moves.

Responsible for daily team safety meetings that pertain to operations such as waterline and drainage pipe installations, in a high-risk environment around active roadways. Wrote daily job hazard analysis and updated according to task changes.

Responsible for install of 8-24” waterline and all fittings, 18 – 96” RCP for drainage improvements under Babcock road.

Directly responsible for supervising the removal of existing waterlines, installation of service lines as well as thrust blocks, headwalls, forming and pouring concrete collars, pressure testing waterlines, bacteria testing, chlorination of new waterlines, Setting up sample points, coordination between site inspectors and water quality test companies

Coordinated with locators to ensure all underground utilities remain intact and are not in conflict with new construction.

Reviewed project documents and plans to ensure work in the field is built to the most recent specifications and drawings.

Performed production reports, timesheets, equipment logs, inspection reports, change orders and updating project files.

Trained and motivated workers to increase efficiency and quality.

Collaborated with and frequently provide status to customers to ensure compliance and high level of customer satisfaction.

Conducted periodic reviews with each team member to promote personnel and professional development in support of company goals and objectives.

Hubbard Construction

July, 2019 – September, 2019

Pipe Foreman

Hubbard Construction is a full-service construction company. The scope of work includes roadway construction, railway and bridge construction, asphalt manufacturing and paving as well as sitework and development.

Ensured all OSHA standards were met or exceeded during ongoing operations.

Read and interpreted site drawings, plans and specifications for installation of gravity sewer associated with civil construction at the Universal Studios Orlando project. Inspected and supervised on-site tradesmen for compliance.

Responsible for ensuring a safe working environment. Led by example. Provided daily tasking of on-site tradesmen and ensured all materials and resources are in place to meet the daily schedule. Coordinated closely with sub-contractors, local inspectors as needed or required. Gave weekly safety briefings to all tradesmen expected to work on the job site.

Responsible for project scheduling to include density testing, inspector scheduling, ordering materials associated with sanitary sewer installation.

Responsible for daily team safety meetings such as shoring inspections, critical lifts and gravity sewer pipe installation, in a high-risk environment over 15’ underground. Wrote daily job hazard analysis and updated according to task changes.

Responsible for install of 8-18” gravity sewer pipe as well as ensuring good grade is maintained throughout operations.

Directly responsible for installation of slide rail shoring systems, double stacked trench boxes, dewatering, installation of manholes and lift stations associated with sanitary sewer.

Coordinated with locators to ensure all underground utilities remain intact and are not in conflict with new construction.

Reviewed project documents and plans to ensure work in the field is built to the most recent specifications and drawings.

Performed production reports, timesheets, equipment logs, inspection reports, change orders and updating project files.

Trained and motivated workers to increase efficiency and quality.

Collaborated with and frequently provide status to customers to ensure compliance and high level of customer satisfaction.

Conducted periodic reviews with each team member to promote personnel and professional development in support of company goals and objectives.

Maintained Crew of (6) men including Excavator operator, Loader operator, Pipe Layer, Tail man, hillman, laborer. Tasked each of these men daily with their specific roles, goals, and places

Bergeron Construction

January, 2019 – July, 2019

Pipe Foreman

Bergeron Construction is a general contractor specializing in land development and roadway construction.

Ensured all OSHA standards were met or exceeded during ongoing operations.

Read and interpreted site drawings, plans and specifications for drainage improvements on the 17-92 project in Orlando, Florida. Inspected and supervised the on-site tradesmen for compliance.

Responsible for ensuring a safe working environment. Led by example. Provided daily tasking of on-site tradesmen and ensured all materials and resources are in place to meet the daily schedule. Coordinated closely with sub-contractors, local inspectors as needed or required. Gave weekly safety briefings to all tradesmen expected to work on the job site.

Responsible for project scheduling to include density testing, ADS, manholes, brick and mortar, 57 stone, concrete, and trucking companies as well as heavy equipment moves.

Responsible for daily team safety meetings such as critical lifts and drainage pipe installation, in a high-risk environment around active roadways. Wrote daily job hazard analysis and updated according to task changes.

Responsible for install of 18 – 72” ADS for drainage improvements on 17-92. Installation of elliptical RCP varying in size from 12x18 to 63x98

Directly responsible for removal and installation of drainage, forming and pouring concrete collars, installation of 18 – 72” ADS for drainage improvements.

Coordinated with locators to ensure all underground utilities remain intact and are not in conflict with new construction.

Reviewed project documents and plans to ensure work in the field is built to the most recent specifications and drawings.

Performed production reports, timesheets, equipment logs, inspection reports, change orders and updating project files.

Trained and motivated workers to increase efficiency and quality.

Collaborated with and frequently provide status to customers to ensure compliance and high level of customer satisfaction.

Conducted periodic reviews with each team member to promote personnel and professional development in support of company goals and objectives.

Maintained Crew of (6) men including Excavator operator, Loader operator, Pipe Layer, Tail man, hillman, laborer. Tasked each of these men daily with their specific roles, goals, and places

Southern Development and Construction

January, 2018 – January, 2019

Service Foreman

Southern Development & Construction is a professional team of estimators, project managers and contractors specializing in total site development, underground utilities, earthwork, fire lines and paving with 26 years of experience on over 800 projects.

Ensured all OSHA standards were met or exceeded during ongoing operations.

Read and interpreted site drawings, plans and specifications for installation of 4-12” water lines, sewer lines, storm drains and all service laterals associated with apartment buildings and private site development. Inspected and supervised the on-site tradesmen for compliance.

Responsible for ensuring a safe working environment. Led by example. Provided daily tasking of on-site tradesmen and ensured all materials and resources are in place to meet the daily schedule. Coordinated closely with sub-contractors, local inspectors as needed or required. Gave weekly safety briefings to all tradesmen expected to work on the job site.

Responsible for project scheduling to include density testing, pressure testing water lines, chlorinating water lines and pressure testing sewer manholes.

Responsible for daily team safety meetings such as pipe installation, in a high-risk environment around active job sites with high number of on-site tradesmen working in close quarters. Wrote daily job hazard analysis and updated according to task changes.

Coordinated with locators to ensure all underground utilities remain intact and are not in conflict with new construction.

Review project documents and plans to ensure work in the field is built to the most recent specifications and drawings.

Performed production reports, timesheets, equipment logs, inspection reports, change orders and updating project files.

Trained and motivated workers to increase efficiency and quality.

Collaborated with and frequently provide status to customers to ensure compliance and high level of customer satisfaction.

Conducted periodic reviews with each team member to promote personnel and professional development in support of company goals and objectives.

Directly Responsible for installation of fire lines, PVC, and ductile iron, all live tie ins, all sewer lateral installation, sidewalk and curb repairs, installation of all fittings involved in waterline installation on new and existing projects.

Worked on multiple projects private and public to include but not limited to UCF stadium improvements, private apartment infrastructure improvements, Worked closely with SKANSKA on all UCF projects, maintaining SKANSKA safety requirements at all times, with a stellar safety record.

Jr. Davis Construction

December, 2014 – January, 2018

Service Foreman

Jr. Davis Construction is a proven heavy highway and roadway contractor with over 33-years’ experience working with FDOT, local municipalities, local developers and engineers. JDC has the resources to successfully take on and complete any large earthwork projects with major dewatering and de-mucking components.

Ensured all OSHA standards were met or exceeded during ongoing operations.

Read and interpreted site drawings, plans and specifications for installation of water line services, sewer services, asphalt patches, concrete repairs and all punch out work associated with project close out. Inspected and supervised the on-site tradesmen for compliance.

Supervised Service crew with a total of 3-6 guys working for me at any given time. Coordinated daily task for specific workers.

Daily work was to include but not limited to; Pressure pipe tie ins, Gravity Sewer lateral tie ins, laying of new laterals, laying and tie in of all new waterline installation. Repaired and installed all collars, inverts, manhole ring and covers, did sidewalk repairs, Curb repairs, pressure testing of newly installed waterlines, Dewatering System installation and maintenance, water quality testing for SWPPP, Excavations on Pond Slopes, ditch bottoms, repair of any odds and ends in between, such as; Guard rail demo and repair, installation of all temporary traffic lane switches, Coring of newly installed Asphalt and lime rock to ensure quality standards are met. Worked closely with Brevard county inspectors to ensure job site cleanliness and public safety was always a priority.

Responsible for ensuring a safe working environment. Led by example. Provided daily tasking of on-site tradesmen and ensured all materials and resources are in place to meet the daily schedule. Coordinated closely with sub-contractors, local inspectors as needed or required. Gave weekly safety briefings to all tradesmen expected to work on the job site.

Responsible for daily team safety meetings such as critical lifts and drainage pipe installation, in a high-risk environment around active roadways. Wrote daily job hazard analysis and updated according to task changes.

Coordinated with locators to ensure all underground utilities remain intact and are not in conflict with new construction.

Review project documents and plans to ensure work in the field is built to the most recent specifications and drawings.

Performed production reports, timesheets, equipment logs, inspection reports, change orders and updating project files.

Trained and motivated workers to increase efficiency and quality.

Collaborate with and frequently provide status to customers to ensure compliance and high level of customer satisfaction.

Conduct periodic reviews with each team member to promote personnel and professional development in support of company goals and objectives.

Assistant Safety Director

Responsible for conducting all onsite drug testing for employees involved in any on-site accidents, or random Drug testing

Patrolled job sites to promote safety; reminding foreman, superintendents, operators and laborers about OSHA standards and procedures, while also enforcing sub-contractors to adhere to the same standards.

Worked closely with teams involved with higher risk operations such as heavy crane lifts, heavy traffic dirt jobs, all work associated with Reedy Creek (Disney Inspectors) and all work associated with Orlando International Airport, Ensured Safety Was of the utmost importance on every Jr.Davis construction site which at the time was over 40 different projects at any given time

Acquired multiple job specific certifications and training.

Wrote safety standards for weekly tailgate safety talks for the entire company.

Helped maintain a safety culture throughout the company.

Worked with Clients on each individual project to ensure all Jr.Davis employees on site were maintaining job specific safety standards

Attended meetings involving pre construction, any and all safety meetings associated with job sites when time permitted, or was necessary to resume normal operations

Continually handled all problems at a management level to prevent owner from the weight of daily “roadblocks” to maintain the “business as usual” model that keeps the company productive and lucrative.

Southern Development and Construction

September, 2014 – December, 2014

Pipe Layer

Adhered to all company and site safety requirements, policies and procedures.

Responsible for laying gravity sewer, force-main, installation of manholes, installation lift stations as well as 18”-48” RCP, water mains, and reclaim mains. Installation of All fittings associated with pressure pipe, directly responsible for installtion of 4”-10” gravity sewer mains over 13’ underground, setup of pipe laser and Site level, proficiently maintained grade throughout project with 0 Dig ups on newly installed gravity sewer

Responsible for setting up site laser and ensuring proper grade percentage is maintained during pipe installation.

Responsible for checking all grade of pipe, proper clearances, proper fittings, pressure testing appropriate pipe. Ensuring all fittings maintain torque specifications to meet quality standards and pass pressure tests.

Safely operated heavy machinery in a high paced environment, meeting and often delivering early on deadlines.

Backfilled, tamped, and tested all dirt associated with pipe installation

Jr. Davis Construction

September, 2013 – August, 2014

Lead Man

Adhered to all company and site safety requirements, policies and procedures.

Safely operated heavy machinery in a high paced environment, meeting and often delivering early on deadlines.

Responsible for all “Punch Out” work on Rouse Road project including but not limited to storm drain tie-ins, water line tie-ins, force -mains, sidewalk concrete restoring, forming and pouring valve pads and pressure tested manhole systems.

Education

Eau Gallie High School

May, 2010

Diploma



Contact this candidate