RESUME
Md. Saleem
Surveyor / Document Controller
Mob: +91-990*******
Email id: adhvh1@r.postjobfree.com
Vuyyuru, India
CAREER OBJECTIVE:
To associate with a progressive organization that gives me scope to update my knowledge and skill per the latest trends, also work as a team and contribute growth of organization.
Key Qualifications: (Technical Initial Task)
I have 11 years of practical work experience in the fields of survey & topography, and I independently handled several projects. Professional experience in surveying for industrial buildings & steel sheds, commercial buildings other infrastructure projects including topographic survey & its implementation at site. is well versed with the use of modern survey techniques and equipment's like GPS, total station, auto levels electronic theodolite. bridges, culvert, pilling, pipeline, underground utilities (civil work). Has also involved in soil field investigations. Establishing control points co-ordinates data with levelling, Traversing, as built for cutting & filling, Excavation and formation, Piles cutting as per design level, walls and columns, shifting of survey Penetration point with plummet instrument. Setting out Piles, Grid Lines Stake Out & marking, Layout of footing and column, & Stake out& Lay Out.
Preasent Working:
PRG BUILDCON INDIA PVT LTD
Feb-2018 Till Now
Role :Surveyor
Project:APTIDCO 2BHK Housing Construction .
Location:Vishakapatnam
Work Experience
Challenger Trading&Contracting, Doha, Qatar.
June 2014 – 2017
Role: Surveyor & Document Controller
Projects: Ummgarn Residential Villas & Bin Mahmoud Residential Buildings.
Locations: Ummgarn& Bin Mahmoud, Qatar.
Survey Responsibilities
Verify the accuracy of survey data including measurements and calculations conducted at survey sites.
Search legal records, survey records, and land titles to obtain information about property boundaries in areas to be surveyed.
Calculate heights, depths, relative positions, property lines, and other characteristics of terrain.
Prepare and maintain sketches, maps, reports, and legal descriptions of surveys to describe, certify, and assume liability for work performed.
Full in charge for Structural, infrastructure, Landscape and finishing works.
Coordination with management, subcontractors and consultants.
Manage our Survey teams, Subcontractors survey teams and maintain the Accuracy of the works and monitors all survey equipment’s within standard accuracy limits.
Manage the Design drawings, shop drawings, as built drawings, office documents, Calibration certificates, Survey helpers time sheets and site records.
Document Responsibilities.
Actual Taking pictures daily on site for different reports.
Daily checking of attendance for manpower
Preparing Daily, Weekly, Monthly Report and other reports as needed
Sending summary reports via email
Preparing Site Inspection Request
Sending summary reports via email, like DIS (Daily Inspection Schedule) for the QA/QC Engineers.
Updating Civil Logs
Perform tasks and mandated by immediate superior.
For MEP Department
Updating Logs (Material Inspection Request, Site Inspection Request (MEP), Non-Conformance Report, MEP Clearance).
Responsible for all project documents, transmittals and correspondences and ensures correct and prompt distribution.
Maintain proper document control and filing system with full traceability.
Update the “Register” of the documents ensures proper back-up for all project documentation.
Timely recording of document data into the standard registers ensuring that the information is accurate and up to date.
Greenko Groups, Haridwar Infrastructure Ltd. (Dec 2011 – May 2014)
Role: Surveyor
Projects: Wind Power &hydro power Plants.
Locations: Maharashtra, Karnataka and Andhra Pradesh. India.
Survey of Land, Location, Electrical line, ROW of Forest, revenue - take reference of purchased land, identify actual purchased/acquired land - reference points, marking align with village map and physically, feasibility check on WTG location, Approach road survey.
ROW Clearance and Site handing over - Ensure no land dispute, final marking, ROW clearance (main road to location), handing over.
Site visit with Govt officials, clients, project team.
Wind turbines boundary survey, including lands and roads connecting toeach wind turbine location, contours, controls points fixing with D.G.P.S& traversing with total station. 33 & 220kv sub-station grid line control rooms, roadwork’s, layout preparations.
S.B.E.C. Projects Ltd. (Mar 2011 – Dec 2011)
Role: Surveyor
Projects: GMR KamalangaEnergyLtd
Locations: Angul–Orissa, India
Works: This project consists of construction work of security barrack, Admin block and commercial complex, Club House. Marking with total station.
Verify the accuracy of survey data including measurements and calculations conducted at survey sites.
Calculate heights, depths, relative positions, property lines, and other characteristics of terrain.
Prepare and maintain sketches, maps, reports, and legal descriptions of surveys to describe, certify, and assume liability for work performed.
I.V.R.C. L Infra Projects Pvt Ltd. (Jun 2009 – Mar 2011)
Role: Surveyor
Projects: Construction of RCC Buildings & Steel Sheds in White Oil Terminal
Locations: HPCL–Visakhapatnam, Andhra Pradesh India.
Works: This project consists of work of Piles & Pile Caps construction, Product Pump Houses, Fire Waterpump sheds, Garage and fire Station, Calibration Shed, Gantry-1&2. Piles Cap, marking with total station
Fixing structural bolts in pedestal for the purpose of mechanical structure erection.
Contour surveying, Leveling and marking machinery and manually Building marks and press foundation marking and fixing Oil Pipe Line Work.
Preparing survey data for survey work in site, Set-out the shape & the orientation of the buildings.
Piling setting out and as built, Topographical survey site wide.
Core wall setting out and as built, marking of grids, Layouts of the footings, walls, columns.
Checking of the civil works, prepare survey report & Coordinate inspection and testing with the consultant.
Piles cutting as per design level, walls and columns, shifting of survey Penetration point with plummet instrument. Setting out Piles, Grid Lines Stake Out & marking, Layout of footing and column, & Stake Out & Lay Outs
Job Skills:
1.Topographical survey contour survey, preparation of drawings on AutoCAD
2.Execution of road boundary wall, slab culvert, truck drain, catch drain &pipe culvert.
3.All structure layout marking at site major bridges, minor bridges, fly-over, culverts.
4.Traversing survey checking of GPS points from one another GPS.
5.Canter line marking
6.Taking OGL& hard rock levels
7.Checking of TBM every month with consults and approval from consult.
8.Fixing of TBM pillar &row pillar fixing.
INSTRUMENTS KNOWN:
Sokia, Leica T.S. 206, Trimble M3 DR 1” & Auto Level.
EDUCATIONAL BACKGROUND
SSC andVocational Course Land surveying at Govt. Polytechnic College, Gudlavalleru.
COMPUTER SKILLS
MS-Office
Auto Cad 2d
PERSONAL DETAILS
Nationality: Indian
Date of Birth: 6thAugust, 1986
Sex: Male
Marital Status: Married
Languages Know: English, Hindi, Urdu and Telugu.
Passport No: K5496376
DECLARATION
I Md. Saleem, hereby declare that the above information enclosed by me is true to my knowledge and done by me in honest.
Applicant’s signature