Post Job Free

Resume

Sign in

Weldin Inspector

Location:
Coimbatore, Tamil Nadu, India
Salary:
Company
Posted:
November 16, 2020

Contact this candidate

Resume:

CURRICULUM VITAE FOR

Sr.Mechanical Inspector(Welding/Piping/Plant Inspection)

MONYKANDAN.T

adhv8h@r.postjobfree.com

Mobile :- +91-994*******

S/o. Mr. Thangappan. M.

*-**, ********* *****, ******am-629 195 (P.O),

Kanyakumari Dist., TamilNadu- India.

Having more than 15 years of proven professional track record in the QA&C fields of Construction, Erection &Pre-commissioning of all mechanical related activities for Oil & Gas, Petro Chemical and Process Industries as per International Standards.

Expertise in Welding, Piping Fabrication & Erection, Structural’ s, Valves, Tank Fabrication & Erections, Testing & Pre-commissioning and (construction phase) as per International Codes and Standards ASME, API, AWS & ASTM and Saudi Aramaco.

Handled materials at project site such as Titanium,DSS,Alloy20,HastAlloy,Monel,Nickel SS 304L,316L,CS,LTCS, Alloy(P11,P22,P91),FRP, GRP, Stabilized stainless steel

Attended shut down works at Gas plant, Fertilizer & Steel plants in INDIA & ABROAD

Having working Exposure in Green Field and Brown Filed areas and Tie- In connections .

To pursue a challenging career in a dynamic work environment, this encourages to nurture and present Creative and professional skills in all practical and real time situations in the organization.

Passed Full time Diploma in Mechanical Engineering (2001 to 2004) from Directorate of Technical Education,Tamilnadu -India Honors with First Class

CSWIP 3.1- Certified Welding inspector – Certificate No.# 47869/2

BGAS-CSWIP Painting Inspector Grade II-Certificate No#259033

API-510 Certified Pressure Vessel Inspector –Certificate No.# 57157

API-570 Certified Piping Inspector – Certificate No.# 59555

API-653 Above Ground Storage Tank Inspector- Certificate No.# 62969

ASNT Level-II in RT, UT, MPT and PT.

Certified GRP Pipe lamination by SKZ German Plastic center

Gasco (Abudhabi Gas Company) and Borouge (Petrochemicals Abudhabi) Approved Inspector.

Saudi Aramco Approved QC-Inspector SAP No. –80003175

Certified GRP Pipe lamination by SKZ German Plastic center Formerly worked in ApplusVelosi Saudi Arabia co Ltd (Welding/Piping/Plant Inspection)from April-2013 to July 2020.

ACADEMIC PROFILE

CAREER OBJECTIVE

PROFESSIONAL CERTIFICATIONS AND APPROVAL

SUMMARY OF PROFESSIONAL EXPERIENCE

ABOUT MY SELF

PROJECT : - Sadara chemical company (Chemicals I&II) PROJECT OWNER :- SADARA chemicals Jubail(JV of DOW+SAUDI ARAMCO) POSITION :- Plant Inspector

PERIOD :- From February -2020 to July 2020.

PROJECT : - Khurais Central Processing Facility (KHCPF) PROJECT OWNER :- Saudi Arabian Oil Company (Saudi Aramco) POSITION :- Mechanical Inspector (Brown Field and Green Field) PERIOD :- From January -2018 to January 2020.

PROJECT : - HYDRO CRACKER UNIT, JIZAN REFINERY PROJECT PROJECT OWNER :- Saudi Arabian Oil Company (Saudi Aramco) POSITION :- Sr Mechanical Inspector

PERIOD :- From April -2017 to October-2017.

NATURE OF WORK:

Reporting directly to the Unit Supervisor through GIS/Field Supervisor.

Review inspection to ensure the contractor’s Quality control documents and test results for conformance to project requirements

Regular monitoring and surveillance of EPC and sub contractor’s performance during construction activities to comply the requirement of MSAER.

Control of non-conforming work activities through the implementation of the non-conformance control procedure. If occurs,initiating log book entries in Aramco QMIS(Quality Management Information system)as Violation,Proactive notification, General Comments

Review the contractor's look-ahead schedule to assist in the planning of coverage of the work activities & prevent construction problems. Monitoring of activities as per RFI.

Attending the RFI’s issued by contractor for Welding, NDT activities as per ITP

Surveillance carried out on going activities at site and findings to be informed to PMT/EPC contractor through Log book entries

Perform Focus Assessment on regular intervals as per work instruction.

Initiating and follow up of Contractor/Sub contractor’s NCR’s through the completion and sign-off in a timely manner

Review of contractor’s WPS/PQR prior to start of welding activities and issuance of JCC for welders as per Project specification and codes

Monitoring and ensure the Radiographic testing coverage as per line class for 100% lines and 10% lines

Witnessing the PWHT activities and review of charts to conform the requirements as per specifications

Review and approval of Hydro and Pneumatic test packages.

Witnessing the Pneumatic and hydro test activities and ensure water quality requirement as per approved procedure

PMCC walk through participation,making punch items and entering in the MPCS system and coordination meeting with PMT for resolving PMCC items

Witnessing and reviewing reports of NDE activities such as PT,MT,RT,PMI and HT

Witnessing and monitoring of piping systems Flushing, Blowing, Drying and Layup in order to ensure that compliance to Project Specifications.

Monitoring the flushing/lay-up activities for Piping systems as per procedure

Ensure production of the construction Quality records of the project are maintained and are available at site. PROJECT : - Sadara Chemicals 1 -Chlorine and Brine PROJECT OWNER :- SADARA Petro chemicals(JV of DOW+SAUDI ARAMCO) PMT :- JACOB'S Engineering (UK) Ltd.

PERIOD :- From April -2013 to Oct 2016

NATURE OF WORK:

Reporting directly to the Project Unit Field Supervisor/Project Quality Manager (PQM).

Review the Inspection Test Plan (ITP), Quality Control Procedures (QCP),Method statement (MS) in Accordance with the requirement of company specification, International codes and Standards.

Involve in Receiving inspection of both Contractor and Company supplied materials upon arrival on site. Physical verification, documents verification like IRC, MTC, COC & submitted documents as per purchase order, Project supply plan, drawings and specifications.

Regular monitoring and surveillance of contractor’s performance during construction activities.

Participating in bi-weekly Quality meetings conducted by Owner of Company.

QA/QC Inspector shall receive RFIs and inspect the activity for all Hold and Witness Points as identified in the Contractors approved ITPs.

Submit weekly Inspection reports and Quality weekly Highlights to the QA Manager for his review and records.

Violations observed Inspection observation and comments, job clarifications, recommendations shall be communicated to the contractor through Log book.

Review the Contractor’s internal NCR’s

Review and approve contractor quality personnel in accordance with Project Schedule Q requirements.

Ensuring construction is being carried out as per IFC drawing.

Perform Focus Assessment on regular intervals as per the instruction from QA Manager.

Review and approval of WPS according to project specification and codes.

Welding consumables receiving inspection, and monitored storage of welding consumables as per project specification and standards.

Monitor weather condition for surface preparation and painting /coating application

Monitoring coating activities in the work place for daily basis

Witnessing for surface profile thickness,salt test, holiday test and adhesion test

Reviewing of paint data sheet for pot life,shelf life,mixing ratio,curing time and batch certificate.

Review and punch listing of pressure test packages and witnessing the pressure test.

Witness and review of NDE activities and Reports..

Witnessing welding procedure qualification testing and welder qualification testing and review WPS/PQR as per relevant project specifications and codes.

Inspection of construction welded storage Tanks as per code API650 and API620

Inspection activities like Tank circularity, Verticality, check peaking and banding on each shell course on the Tank, Vacuum Box test, RF pad air leak test.

Inspection activities like Tank Leak test, Hydro pneumatic test for roof plates, Tank foundation settlement during and after hydro test.

Witness Pre-commissioning activities (Flushing/Blowing/Drying/ System Layup)in order to ensure that compliance to Project Specifications.

Periodic inspections and assessments on preservations as per Contractors preservation plan.

Witnessing the contractor/Subcontractor chemical cleaning activities of Degreasing/Acid cleaning / Passivation as per approved procedure for chlorine and oxygen services.

Witnessed Borescope inspection for system cleanliness and corrosion monitoring.

Witnessing and review of PSV calibration for set pressure, leak testing and back pressure requirements as per approved vendor procedure and API 527.

Participate to Plant Walk downs meant to verify systems readiness with owner. INSPECTED PRODUCTS & HANDLED MATERIALS –At Project site:

• Titanium, Duplex stainless steel, Monel, Hastelloy, Alloy 20, Nickel, SS 304,316, Aluminum, FRP & GRE, Carbon steel and Low temperature service carbon steel.

• Special cleaned service pipelines: Oxygen & Chlorine.

• Cooling Tower with FRP fan housing, Towers (Packed & Trayed) – FRP & Metallic, Heat Exchangers (Tube & Plate), Tanks, Vessels, Drums – FRP & Metallic and Electrolyzer.

CONSOLIDATED CONTRACTORS COMPANY (S.A.L) ABUDHABI. 1) Project : Borouge Ethylene Cracker Unit -3, Abu Dhabi. Client : LINDE AG ENGINEERING, BOURUGE POLYMERS COMPANY. Position : QC Inspector – Boiler (Piping/Welding)

Duration : Feb 2012 to Oct 2012

This project includes fabrication and erection of power piping/process piping, stack fabrication and erection, Economizer, soot blower, steam, water drum, super heaters, interconnecting piping inspection (As per ASME Sec-1, ASME B31.1 & B31.3). Material: CS, SS & Alloy Steel (ASME Sec.2) 2) Project : Habshan Flare Gas Recovery

Client : ABUDHABI GAS INDUSTRIES LIMITED (GASCO), HABSHAN. Position : QC Inspector – (Piping/Welding).

Duration : Sep 2010 to Sep 2011

3) Project : Borouge Ethylene Cracker Unit -2, Abu Dhabi. Client : LINDE AG ENGINEERING, BOURUGE POLYMERS COMPANY. Position : QC Inspector – (Piping/Welding)

Duration : Sep 2008 to Feb 2010

This project includes different types of piping materials like Carbon steel, Low carbon steel, Stainless Steel (SS304,SS316),and Alloy(P11,P22,P91) and its Pipes support fabrication and erection. SHUT DOWN JOB DETAILS:-

Organization : CONSOLIDATED CONTRACTORS COMPANY (S.A.L) ABUDHABI Duration : 45 Days shut down for each 15 days(Habshan0,1and 2)(Mar 2011 to Sep 2011). Project : Habshan Flare Gas Recovery (Hahshan 0,1 and 2) Client : ABUDHABI GAS INDUSTRIES LIMITED (GASCO), HABSHAN This shutdown was to minimize Gas flaring to the environment for Habshan -0, 1 and 2 plants in accordance with ADNOC-HSEIA. This also included new distribution system interface tie-ins with existing utility and offsite facilities.

CONSOLIDATED CONTRACTORS COMPANY (W.L.L SAUDI ARABIA) 1) Project : Khursaniyah Gas Producing Facilities Projects, Saudi Arabia. Client : SNAMPROGETTI, SAUDI ARAMCO.

Position : QC Inspector – Piping.

Duration : Jan-2007 to Mar 2008.

NATURE OF WORK:

Conducting incoming material inspection in accordance with the specification & drawings. And review of mill test certificate

Review of WPS, PQR, Welder Qualification as per ASME code and project specification

Monitored and controlled the consumption of welding consumables.

Monitored the welders’ qualification activities at fabrication shop and field.

Inspected the welded job in accordance with QA plans and procedures during, before and after welding.

Prepared welder repair track log and implemented action needed.

Issued NCRs for the jobs deviating from construction standards.

Prepared and maintained Daily Weld Reports.

Performed necessary dimensional control activities and submitted inspection report to the client.

Carried out inspection of various fit-ups and welding before, during and after welding operation as per approved Inspection and test plan, relevant engineering drawing, international standards and project specifications.

Witnessed NDT (MT, PT) for welded joints, and reviewed NDT reports.

Radiographic interpretation, review and signing of RT reports, to follow up inspection release reports.

Monitored /reviewed positive material identification, ferrite test, torque test etc.

Conducting routine surveillance/inspections on the activities involving welding, materials etc.

Inspecting the piping & Punch listing of piping, equipment and packages and arranging for final walk down with client.

Scheduling and co-ordination of inspection activities with client inspection team.

Checking the Inspection Test Plan (ITP) and Quality Record (QR) in accordance with, ASME Sections and to fulfill the requirement of client job specification.

Counter checking the fabrication isometric drawings with GA and P&ID

NEO STRUCTO CONSTRUCTION LTD (Surat, India)

Position : Jr. Engineer

Duration : Sep-2004 to Dec-2006.

1) Project : Fab. & Assembly of FCCU Regenerator

Client : LARSEN & TOUBRO LIMITED (Hazira, India)

This project is one of the biggest Pressure vessels in the world. And also it includes internals, nozzles fabrication and assembly.

2) Project : Fab & Erection of Piping job in Continuous Polymerization Client : RELIENCE INDUSTRIES LTD (Hazira, India).

This project includes Piping (Unit piping & Jacket piping) and its Pipes support fabrication, erection for CP unit. And also it’s includes Carbon Steel & Stainless Steel piping. 3) Project : Fab & Erection of oxygen plant

Client : ESSAR STEEL LTD. (Hazira, India).

This project includes fabrication and erection of U/G, A/G Piping for cold box, cooling tower, equipments & skids. And also it’s includes Carbon Steel, Stainless Steel & Aluminum piping. NATURE OF WORK:

Ensuring complying with specified requirement for the incoming materials.

Stage wise Fit up and Weld Visual Inspection for Piping and Equipments

Inspecting alignment & orientation of pipeline as per drawing.

Pipe Support Fabrication and Erection.

Inspection of Plate Rolling for the making of Vessels

Inspection of Nozzle Installation

Inspection of Vessel Alignment and Hydro test

Undertaking line checking through Isometric drawing, P & ID.

Review of Hydro test Packages, Line Checking and Punch listing.

Witnessing the hydro test & pneumatic tests.

Involved in Re instatement and Master Punch list preparation. SHUT DOWN JOB DETAILS:-

Organization:- NEO STRUCTO CONSTRUCTION LTD (SURAT) 1)Client : ESSAR STEEL LTD (Hazira India)

Duration : 28th Nov -13th Dec 2004.

Project : Modification job of EAF-3.

2) Client : ESSAR STEEL LTD (Hazira India).

Duration : 28th Mar -10th Apr 2005.

Project : Modification job of EAF-1.

3) Client : ESSAR STEEL LTD (Hazira, India)

Duration : 19th Sep -2nd Oct 2005.

Project : Modification job of EAF-2.

In this Shut Down, The arrangement of Electric Arc Furnace was changed with client requirement. Which includes Dismantling and Re-erection of Combustion Chamber, Water Cooled Panels, Water Cooled Ducts, Fixed Elbow, Moving Elbow & It’s complete Fabrication, Erection of piping works. 4) Client : INDIAN FARMERS FERTILISER CO-OP LTD (KALOL, India) Duration : 1ST Apr -22nd Apr 2006.

Project : Reformer Revamp III

In this Shut Down, The arrangement of Harp assembly (catalyst tubes) was changed with client requirement. Which includes Dismantling and Re-erection of Pigtails, Inlet manifolds, Burner & its complete Fabrication, Erection of piping works (CS, SS, P11).

PERSONAL DATA:

Date of Birth: 07/04/1984

Gender: Male

Marital status: Married

Nationality: Indian

Languages Known: English, Tamil, Malayalam and Hindi. Passport No: K8970489

Expiry Date: 13/12/2022

Driving License: SAUDI ARABIA -KSA

Expiry Date: 24/02/2024

I HEREBY ACKNOWLEDGE THE ABOVE ALL STATEMENTS ARE TRUE AND COMPLETELY CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF.

Yours sincerely,

Place: Nagercoil,India

Date: 09-September-2020

(T.MONYKANDAN)

Non-Business Use



Contact this candidate