CURRUCULUM VITAE
KONIKI CHALAMAIAH
Mobile: +974-********
+91-799*******, E-Mail: adhu4p@r.postjobfree.com
BRIEF OVERVIEW:
Looking for a demanding position in a growth oriented HVAC consulting/contracting/ construction organizations, where there is ample scope for individual and organizational growth.
SUMMARY:
Around 9 YEARS OF EXPERIENCE IN MEP Industry with, good analysis, good communication and interpersonal skills, proven individually in project management and worked with team of professionals.
POSITION HELD:
HVAC Engineer .
WORK EXPERIENCE:
Working as a Mechanical Site Engineer in Voltas form June – 2020
Worked as MECHANICAL SITE ENGINEER - HVAC IN TRGS from March -2017 to March-2019.
Worked as MECHANICAL SITE ENGINEER - HVAC IN AL TURKI ENTERPRISES LLC, OMAN from March -2017 to March-2019.
Worked as HVAC ENGINEER IN Air Voice Engineering Solutions, Hyderabad, India from June 2013 to 2017.
EDUCATIONAL QUALIFICATION:
M. Tech (CAD/CAM) from Chirala Engineering College (JNTUK), Chirala in 2016.
B. Tech [Mechanical ] with 63% from Rao & Naidu Engineering College(JNTUK), Ongole in 2011.
Intermediate (M.P.C) with 79% from Surya Junior College, Inkollu in 2007.
SSC passed with 76% from S.V.K High School, Gangavaram in 2005.
COMPUTER KNOWLEDGE:
HVAC Design Software:
GENERAL FORM
Mc QUAY DUCT SIZER
Mc QUAY PIPE SIZER
PUMP HEAD CALCULATIONS FOR CHILLED WATER PRIMARY & SECONDARY PUMPS
ESP CALCULATIONS OF EXHAUST FANS, FRESH AIR FANS, FCU & AHU.
CONVERTERS
Drafting Software:
AutoCAD 2011-2017
Operating Systems:
Windows 7, Windows Vista, XP, 98.
Office Package:
MS Office 2018 (Word, Excel, PowerPoint)
TECHNICAL EXPERTISE:
HVAC JOB RESPONSIBILITIES:
Taking the Material quantity from approved Shop Drawings.
Follow-up the Materials as per execution works
Daily inspect the work
Preparing the Equipment Schedule as per approved shop drawings
Heat Load calculations, Heat Loss calculations following ASHRAE Standards.
ESP Calculations for AHU,FUC,Packaged A/C, Fans & Blowers.
Evaporator cooling coil selection.
Selection of Chillers, AHUS, FCUS, Exhaust Fan, Window Ac, Cooling Tower, and other Equipments.
PLUMBING JOB RESPONSIBILITIES:
Taking the Material quantity from approved Shop Drawings.
Follow-up the Materials as per execution works
Daily inspect the work
Water Supply and Foul Water Drainage pipes installation as per approved Drawings.
Manhole, Septic Tank, Soak away pit, Pipes & Fittings installation.
Storm water drainage & External water supply Calculation.
Garden water supply pipes installation.
Water Pump, Booster Pump, installation as per approved shop drawings.
FIRE FIGHTING JOB RESPONSIBILITIES:
Taking the Material quantity from approved Shop Drawings.
Follow-up the Materials as per execution works
Daily inspect the work
Fire water Demand & Fire water tank installation as per following NFPA Standards.
Jockey pump, Main Pump, Diesel Operated Pump, and Booster Pumps installation as per approved shop drawings.
Sprinkler system, Fire Hose Cabinet, Water Hydrant system, Smoke detector, Heat detector installation.
RESPONSIBILITIES AS A HVAC Engineer
Worked as a HVAC site Engineer.
Preliminary planning based on Architectural drawings.
Concept/Design discussions with the clients and Architects.
Co-ordination with architectural and structural & all MEP work. Mobilizing manpower and materials at the site.
Checking the weekly and monthly progress, dealing with consultant, reporting the project manager and to the project management team.
Monitoring the sub contractor work progress, checking the quality of work as per specification and approved drawings.
Going for the inspection on the site.
Checking of all HVAC, ELECTRICAL & Plumbing Service Drawings.
PROJECTS HANDLED:
Working CBD, Lusail. It’s a commercial buildings having 5-star hotels.
Working in QPD in DOHA. It is a FIT OUT project having 47 floors. Each floor having 4 AHU & 50 numbers of VAV.
Working in Central Prison Project in Thumrait Dohfar. It is a central Prison Project for Prisons having 26 buildings is a huge perimeter distance of 3km with Air cooled Screw chilled water cooling system.
DOG Kennel Project in Muscat of Oman is a Police accommodation & Trainers buildings. It is a DX-System cooling process. Completed in 18months as per Project contract.
Hotel Building is eight Flory building with two basements contains a huge area of 1000 square feet. Execution of a building and site requirements were handled by our firm
Commercial Centre is a high rise building based in Hyderabad. Designing and Execution were major aspects done by our firm. This project went on for one year and executed successfully
Hill Residency, Hyderabad is a high rise building. A complete MEP Designing was under taken by our firm
PERSONAL DETAILS:
Sex : Male
Fathers Name : NAME
D.O.B : 01.08.1990
Marital Status : MARRIED
Nationality : Indian
Passport Number : N0815440
Language Known : English, Hindi, Tamil and Telugu
Permanent Address : 2-119, Gangavaram, Inkollu (m.d), Prakasam(D.T), A.P, India – 523167.
DECLARATION
I hereby declare that the above furnished details are true to the best of my knowledge and belief.
Date : Yours Sincerely
Place : K.Chalamaiah